Map Road Start Time End Time Details
CASTLEY LANE 14/11/18 00:00 04/12/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in grass verge and 5m road crossing to joint new cable and reinstate excavations.
WHITECHAPEL ROAD 18/10/18 00:00 31/10/18 23:59 TO EXCAVATE ROAD CROSSING FOR INSTALLATION OF UNDERGROUND DUCTING
KENMORE CRESCENT 15/10/18 00:00 23/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND CABLE AND DUCT
Only events active within the next 30 days are shown on the map BLACKBURN ROAD 26/11/18 00:00 30/11/18 23:59 Carriageway Resurfacing
TURNSTEADS AVENUE 15/10/18 00:00 20/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCT AND CABLE
Only events active within the next 30 days are shown on the map M62 12/12/18 20:00 13/12/18 06:00 M62 eastbound and westbound Jct 28 various lane closures and full road closures for junction improvement works. Diversion routes in place
M62 07/11/17 10:30 31/10/18 23:59 M62 Roundabout Jct 29 Lofthouse emergency repairs on bridge 30mph speed restriction in place
BAYSWATER MOUNT 18/10/18 00:00 24/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Walkway Out in carriageway, Spoil barriers signs in carriageway
BRADFORD ROAD 28/10/18 00:00 18/11/18 23:59 CARRIAGEWAY RESURFACING SCHEME FOR BRADFORD ROAD, BATLEY FROM: HICK LANE TO: NORTH STREET DATES: 28/10/18 - 18/11/18 TIMES: MON-FRI - 09:00-17:00 SUN - 08:00 - 23:00 WORKS TO TAKE PLACE USING 2-WAY LIGHTS AND POINT CLOSURES TO SIDE ROADS
BRADFORD ROAD 28/10/18 00:00 18/11/18 23:59 CARRIAGEWAY RESURFACING SCHEME FOR BRADFORD ROAD, DEWSBURY - LINKED TO 00172199/GJ00200008388 FROM: HICK LANE TO: NORTH STREET DATES: 28/10/18 - 18/11/18 TIMES: MON-FRI - 09:00-17:00 SUN - 08:00 - 23:00 WORKS TO TAKE PLACE USING 2-WAY LIGHTS AND POINT CLOSURES TO SIDE ROADS
Only events active within the next 30 days are shown on the map WOODLANDS DRIVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map POLLARD CLOSE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M621 27/10/18 06:00 27/10/18 09:00 M621 anticlockwise Jct 1 to M62 Jct 27 lane closure for barrier repair works.
Only events active within the next 30 days are shown on the map WOODLANDS AVENUE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map GROVE CLOSE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M621 24/10/18 21:00 25/10/18 05:00 M621 clockwise Jct 1 to Jct 2 full entry slip road closure and lane closure for barrier repair works. Diversion route in place.
Only events active within the next 30 days are shown on the map LABURNUM GROVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M62 22/10/18 21:00 23/10/18 05:00 M62 eastbound Jct 28 full entry slip road closure for technology works. Diversion route in place.
Only events active within the next 30 days are shown on the map SPEN LANE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
EAST CHEVIN ROAD 19/10/18 00:00 22/10/18 23:59 HIAB to Park on carriageway for small duration to remove electricity pole. Lights to be on at 09:30 for approx two hours, immediately removed on completion
Only events active within the next 30 days are shown on the map LATHAM COURT 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map CEDAR WAY 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map POLLARD AVENUE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map LITTLEMOOR CRESCENT 14/01/19 00:00 14/02/19 23:59 New Connection - Excavate and locate cable, including 40m of trench in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map CLIFFE LANE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map SCOTT LANE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map ASH GROVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map LATHAM LANE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map WOODLANDS CRESCENT 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
HAREHILLS LANE 16/10/18 00:00 29/10/18 23:59 Substation Replacement/Maintenance - Excavate and locate cable, joint new cable and reinstate excavations. Including 4m of trench in footway. Pedestrians Maintained in footway.
CRAIG CLOSE 19/10/18 00:00 23/10/18 23:59 UNBLOCK TEE
Only events active within the next 30 days are shown on the map M62 04/12/18 21:30 05/12/18 06:00 M62 westbound Jct 26 to Jct 25 lane closures for technology works
M1 24/10/18 21:30 25/10/18 06:00 M1 northbound Jct 41 to Jct 42 lane closures for technology works
LEA MILL PARK DRIVE 04/10/18 00:00 21/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 190 meters of trench in footway and 24 meters of road crossing and 1 x joint hole in footway, Works in conjunction with works on Kirk Lane and Lea Mill Park Close.
KILPIN HILL LANE 19/10/18 00:00 22/10/18 23:59 Public Lighting Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations.
M62 23/10/18 21:00 24/10/18 05:00 M62 westbound Jct 28 to Jct 27 lane closures for technology works.
BELLE ISLE CIRCUS 08/11/18 00:00 14/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
BRIDGEWAY 05/11/18 00:00 09/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 15m of trench in footway and road crossing to joint new Industrial cable and reinstate excavations.
FOUNTAINS AVENUE 20/10/18 00:00 24/10/18 23:59 UNBLOCK TEE
Only events active within the next 30 days are shown on the map M621 10/12/18 20:00 11/12/18 06:00 M621 clockwise and anticlockwise Jct 1 to Jct 7 road closures for survey works
LEEDS ROAD 17/09/18 00:00 01/02/19 23:59 ORDER FOR TMA PURPOSES ONLY LEEDS RD CARRIAGEWAY WIDENING/RESURFACING SCHEME FROM: Slipper Lane TO: Lighting Col number 73 TM: Contraflow system to be used Point Closures as per locations tab
NEW STREET 01/11/18 00:00 07/11/18 23:59 New Large Connection - Excavate and locate cable, including 1x Joint hole in footway to joint new cable and reinstate excavations to connect supply to site
A1 01/11/18 19:00 02/11/18 06:00 a1 southbound lane 3 closed mp 59.8 to 56.4
PROSPECT ROAD 05/11/18 00:00 11/11/18 23:59 Overlay exsisting footway. Grubbing required timber edging required 6mm overlay @ 25mm thick path to be as near to 2.0m wide as practicable
Only events active within the next 30 days are shown on the map ALDAMS ROAD 07/01/19 00:00 10/03/19 23:59 Pedestrian crossings upgrade scheme.
HOWARD STREET 20/10/18 00:00 26/10/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 2 joint holes in footway and 35m of trench in footway. Road too narrow for walkway
Only events active within the next 30 days are shown on the map POPELEY RISE 22/11/18 00:00 07/01/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
ABERFORD BY-PASS 22/10/18 19:00 23/10/18 06:00
M62 24/10/18 20:00 25/10/18 06:00 M62 eastbound and westbound Jct 25 to Jct 26 lane closures VRS renewals
HAZEL CLOSE 17/10/18 00:00 23/10/18 23:59 Service Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations.Peds maintained in footway.
M1 22/10/18 19:00 23/10/18 06:00
KENMORE AVENUE 13/09/18 00:00 24/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
M62 08/10/18 08:00 26/10/18 23:59 M62 eastbound Jct 29 hardshoulder closure for fencing works.
ROOKS AVENUE 12/09/18 00:00 23/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND CABLE AND DUCT
WHITECHAPEL ROAD 24/10/18 00:00 06/11/18 23:59 TO EXCAVATE IN CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING
Only events active within the next 30 days are shown on the map ABERFORD BY-PASS 12/03/19 20:00 13/03/19 06:00 m1 southbound junction j48 to junction 47
HALIFAX ROAD 03/11/18 00:00 25/11/18 23:59 SP2191 Dewsbury Ring Road Rail Station
HEMSBY ROAD 17/10/18 00:00 23/10/18 23:59 Public Lighting Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Footway closed and maintained in Carriageway.
DEWSBURY RING ROAD 11/06/18 00:00 23/12/18 23:59 Dewsbury Rail Station Gateway - initial quantities
PROSPECT TERRACE 05/11/18 00:00 14/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VIRGIN MEDIA DUCT AND CABLE
KENMORE ROAD 19/09/18 00:00 30/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
KINGS LEA 17/10/18 00:00 23/10/18 23:59 Service Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations
HOLDSWORTH STREET 17/09/18 00:00 26/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
ALBERT STREET 17/09/18 00:00 26/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
VINE AVENUE 20/09/18 00:00 31/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
DEWSBURY RING ROAD 25/06/18 00:00 23/12/18 23:59 Dewsbury Rail Station Gateway - initial quantities
ST JOHNS PLACE 22/10/18 00:00 30/11/18 23:59 Lay new duct for fibre optic connections in footway and carriageway
DEWSBURY ROAD 19/09/18 00:00 30/10/18 23:59 Lay new duct for fibre optic connections in footway
M1 31/10/18 19:00 01/11/18 06:00 m1 southbound lane 1 and lane 2 closed for patch repairs
ST JOHNS CLOSE 22/10/18 00:00 16/11/18 23:59 Lay new duct for fibre optic connections in
TOFTS ROAD 02/10/18 00:00 22/10/18 23:59 TO EXCAVATE IN FOOTWAY FOR INSTALLATION OF VIRGIN MEDIA CABLES AND DUCTS
RAILWAY STREET 29/10/18 00:00 30/11/18 23:59 Lay new duct for fibre optic connections in
CHEAPSIDE 22/10/18 00:00 23/11/18 23:59 Lay new duct for fibre optic connections in footway and carriageway
13/11/18 00:00 19/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway and 5m of trench in footway to joint new cable and reinstate excavations. For a new supply, for barriers. Working in conjusntion with Leeds City Council.
MARKET STREET 28/09/18 00:00 08/11/18 23:59 Lay new duct for fibre optic connections in
NORTH BROOK STREET 19/10/18 00:00 25/10/18 23:59 Public Lighting Knockdown - Excavate and locate cable disconnect apparatus and reinstate excavation where possible
BUTTS YARD 05/11/18 00:00 14/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VIRGIN MEDIA DUCT AND CABLE
WHITCLIFFE ROAD 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN COBBLED ROAD FOR INSTALLATION OF NEW VIRGIN MEDIA DUCT AND CABLE
18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VIRGIN MEDIA DUCT AND CABLE
Only events active within the next 30 days are shown on the map SOWOOD STREET 03/01/19 00:00 07/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 14 joint holes in footway and 140m of trench in footway. Footway occupied, pedestrians to use other footway.
OXFORD ROAD 10/09/18 00:00 14/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY (ROAD XINGS OUTSIDE 254/ 236/ 124/ 127 AND 108
PEASELAND ROAD 05/11/18 00:00 14/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VIRGIN MEDIA CABLE AND DUCT
BELGRAVE STREET 24/10/18 00:00 06/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 6mxx 2m of trench in footway.Walkway in Carriageway for pedestrians - work to be done between 8:00 + 17:00 weekdays. Van to be parked safely
WADE LANE 24/10/18 00:00 06/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 1 joint holes in footway. Footway occupied, walkway in carriageway.
WESTGATE 06/08/18 00:00 26/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW STREETSIDE CABINET, UNDERGROUD DUCTING AND CHAMBERS
SPRING ROAD 22/10/18 00:00 26/10/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway to joint new cable and reinstate excavations
SOUTHWAY 26/10/18 00:00 30/10/18 23:59 Cable Overlay (Low Voltage) ? Excavation of 5 trial holes in footway for investigation purposes. Reinstate excavations as interim. To be made permanent when cable overlay works are completed
HALIFAX ROAD 18/10/18 00:00 24/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway to joint new cable and reinstate excavations. Walkway in carriageway.
LENHURST AVENUE 18/10/18 00:00 24/10/18 23:59 New Connection - Excavate and locate cable, including 1 x Joint hole and 3m of trench in footway and 6m road crossing to joint new cable and reinstate excavations.
CRAWSHAW ROAD 31/10/18 00:00 05/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map LEA MILL PARK CLOSE 07/01/19 00:00 25/01/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 90 meters of trench in footway, 6 meter road crossing and 10 x joint hole in footway. Footway closed pedestrians to use other footway, Works to take place weekdays and weekends.
FRANKLAND PLACE 05/11/18 00:00 07/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
M62 19/11/18 21:30 20/11/18 06:00 M62 eastbound and westbound Jct 29 to Jct 31 lane closures and road closure for technology works diversion route in place
GREAT WILSON STREET 26/10/18 00:00 01/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in verge and 1m of trench in verge to joint new cable and reinstate excavations
PROVIDENCE ROAD 18/10/18 00:00 25/10/18 23:59 Service Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations. Footway closed, alternate available
FALKLAND GARDENS 17/10/18 00:00 23/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Alternative footway in use, Signs barriers spoil and excavation in carriageway
THE DRIVE 16/10/18 00:00 24/10/18 23:59 Public Lighting Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations. Excavation in footway, pedestrians to use alternative footway
M606 14/11/18 21:30 15/11/18 06:00 M606 northbound and southbound Jct 1 to Jct 3 lane closures for technology works
KIRKSTONE DRIVE 17/09/18 00:00 26/10/18 23:59 TO EXCAVATE IN CARRIAGEWAY AND FOOTWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
OLD ROAD 01/11/18 00:00 14/11/18 23:59 New Connection - Excavate and locate cable, including 2 joint holes to joint new cable and reinstate excavations
LEEDS ROAD 29/10/18 00:00 04/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway and 120m of trench in footway and 7.5m road crossing to joint new cable and reinstate excavations
VICAR LANE 12/10/18 00:00 23/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Alternative Footway in use, Vehicls signs barriers and spoil in carriageway
PEARSON STREET 11/10/18 00:00 25/10/18 23:59 25m install gas and electric main
STUNSTEDS ROAD 15/10/18 00:00 23/11/18 23:59 TO EXCAVATE IN FOOTWAY FOR INSTALLATION OF UNDERGROUND DUCT AND CHAMBERS
CROSS GREEN LANE 22/10/18 00:00 26/10/18 23:59 New Connection - Excavate and locate cable, including 1 joint hole and 2m of trench in footway and 6m road crossing to joint new cable and reinstate excavations
M621 23/10/18 21:00 24/10/18 06:00 M621 anticlockwise Jct 4 road closure and lane closures for inspection works Diversion route in place
WESTON DRIVE 08/11/18 00:00 14/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 2m of trench in footway, to joint new cable and reinstate excavations
BELLE VUE ROAD 17/10/18 00:00 23/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 20m of trench in footway, and 6m road crossing to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map SCOTT LANE 27/11/18 00:00 03/12/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 2m of trench in footway, and 7m road crossing to joint new cable and reinstate excavations
VINE STREET 12/09/18 00:00 23/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
ROUNDHAY ROAD 15/11/18 00:00 19/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map CLIFFE MOUNT 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map LATHAM LEA 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
SCHOLES LANE 29/10/18 00:00 02/11/18 23:59 .
WOODHOUSE LANE 02/11/18 00:00 08/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole and 3m of trench in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map POLLARD WAY 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
DUNSTAN GROVE 29/10/18 00:00 07/12/18 23:59 Lay new duct for fibre optic connections in footway and carriageway
DEWSBURY ROAD 22/10/18 00:00 26/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 1m of trench in footway to joint new cable and reinstate excavations to bus shelter 1066. Pedestrian walkway in carriageway
Only events active within the next 30 days are shown on the map REFORM STREET 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
MORRIS LANE 23/10/18 00:00 26/10/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway to joint new cable and reinstate excavations. Works in conjunction with Traffic Management on Norman Street QA761U1027318A
Only events active within the next 30 days are shown on the map DUNSTAN GROVE 22/11/18 00:00 26/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map CLIFFE LANE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map WEST STREET 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map GROVE LANE 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map OXFORD ROAD 15/01/19 00:00 25/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
DEIGHTON LANE 23/07/18 00:00 26/10/18 23:59 Footway Resurface Areas of Flags to flex and Re kerb
NORTHWAY 26/10/18 00:00 30/10/18 23:59 Cable Overlay (Low Voltage) ? Excavation of 1 trial hole in footway for investigation purposes. Reinstate excavations as interim. To be made permanent when cable overlay works are completed
BRADFORD ROAD 28/10/18 00:00 18/11/18 23:59 Carriageway Resurfacing
CLIFFE PARK RISE 29/10/18 00:00 02/11/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway and 15m of trench in footway to joint new cable and reinstate excavations
HEALEY LANE 23/07/18 00:00 26/10/18 23:59 Footway Resurface Areas of Flags to flex and Re kerb
GREENVIEW MOUNT 23/10/18 00:00 29/10/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes either side of footway to joint new cable and reinstate excavations
BRADFORD ROAD 22/10/18 00:00 09/11/18 23:59 Carriageway Resurfacing
Only events active within the next 30 days are shown on the map BOGGART HILL DRIVE 14/01/19 00:00 08/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 14 joint holes in footway and 170m of trench in footway. Pedestrians to use alterate footway.
Only events active within the next 30 days are shown on the map BARNCROFT ROAD 14/01/19 00:00 14/03/19 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway, 225m trench in footway, 8m of trench in carriageway and a 10m link box hole in footway to joint new cable and reinstate excavations. Pedestrians to use alternate footway.
Only events active within the next 30 days are shown on the map BARNCROFT GARDENS 14/01/19 00:00 08/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 18 joint holes in footway and 200m of trench in footway. Pedestrians to use alternate footway.
Only events active within the next 30 days are shown on the map BARNCROFT RISE 14/01/19 00:00 08/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 8 joint holes in footway and 95m of trench in footway. Pedestrians to use alternate footway.
DEWSBURY RING ROAD 03/02/18 00:00 03/02/21 23:59 Carriageway resurfacing
SELBY ROAD 25/10/18 20:00 26/10/18 06:00 m1 jct 46
LAMBTON GROVE 18/10/18 00:00 24/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 3m of trench footway, and reinstate excavations
BARNCROFT GARDENS 17/10/18 00:00 23/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Footway closed, alternate available. Vehicles, signs, barriers and spoil in the carriageway
Only events active within the next 30 days are shown on the map 03/12/18 00:00 10/12/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway and 7m road crossing to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map DUNDERDALE CRESCENT 28/11/18 00:00 18/12/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 6m of trench in carriageway to overlay HV.
WETHERBY ROAD 01/11/18 00:00 05/11/18 23:59 Service Alteration - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map VICTORIA APPROACH 22/01/19 00:00 25/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 60m of trench in carriageway.
NAPIER TERRACE 19/10/18 00:00 25/10/18 23:59 Service Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations,
Only events active within the next 30 days are shown on the map A650 20/01/19 00:00 21/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 100m of trench in carriageway.
Only events active within the next 30 days are shown on the map VICTORIA WAY 21/01/19 00:00 01/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 35m of trench in carriageway.
Only events active within the next 30 days are shown on the map VICTORIA WAY 21/01/19 00:00 22/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 110m of trench in carriageway.
M62 15/11/18 21:30 16/11/18 06:00 M62 eastbound and westbound Jct 29 to Jct 30 road closure for technology works diversion route in place
COMMERCIAL STREET 18/10/18 00:00 24/10/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 1 joint hole in footway and reinstate excavations
Only events active within the next 30 days are shown on the map FARTOWN 02/01/19 00:00 15/01/19 23:59 New Large Connection - Excavate and locate cable, including approx 150m of trench in footway, 8m road crossing and further 10m in footway to joint new cable and reinstate excavations. In conjunction with works on Littlemoor Crescent + Hillthorpe Road. Pedestrian walkway in carriageway with reinstatement as works progress
Only events active within the next 30 days are shown on the map LITTLEMOOR CRESCENT SOUTH 09/01/19 00:00 22/01/19 23:59 New Connection - Excavate and locate cable, including 60m trench in footway, 13m trench in footway and 9m road crossing to joint new cable and reinstate excavations. Pedestrian walkway in carriageway.
Only events active within the next 30 days are shown on the map LITTLEMOOR CRESCENT SOUTH 14/01/19 00:00 01/02/19 23:59 New Connection - Excavate and locate cable, including 60m of trench in footway, and 9m road crossing, 13m trench in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map SOUTHROYD RISE 16/01/19 00:00 29/01/19 23:59 New Connection - Excavate and locate cable, including 9m of trench in footway and 9m road crossing to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map HILLTHORPE ROAD 02/01/19 00:00 15/01/19 23:59 New Connection - Excavate and locate cable, including 7m road crossing to joint new cable and reinstate excavations
HEALEY LANE 29/10/18 00:00 09/11/18 23:59 .
OXFORD ROAD 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
STONEY CROFT 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
WILLOW CLOSE 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
QUARRY ROAD 16/10/18 00:00 26/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
KEBBLE COURT 02/11/18 00:00 13/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map BROOKLYN DRIVE 22/11/18 00:00 05/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
HEMSBY ROAD 18/10/18 00:00 24/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Footway closed an alternative is available, Some carriageway incursion.
WHINMORE GARDENS 05/10/18 00:00 15/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
UPPER LANE 16/10/18 00:00 26/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
BURTON CRESCENT 23/10/18 00:00 29/10/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 2 joint holes in footway and reinstate excavations
M1 24/10/18 20:00 25/10/18 06:00 M1 JUNCTION 46
M62 26/10/18 21:30 27/10/18 06:00 M62 eastbound Jct 27 to Jct 28 road closure and lane closure for technology works
ALEXANDER STREET 02/11/18 00:00 02/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in carriageway to joint new cable and reinstate excavations. 2 disabled bays and 3 parking bays have been booked out with parking services Ref: 058204 - work to be completed in 1 day
SOUTH VIEW ROAD 24/10/18 00:00 26/10/18 23:59 Excavate in footway to extend tees and termination points on Virgin Media network into private grounds
FLAX PLACE 29/10/18 00:00 16/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole 80m of trench in footway to joint new cable and reinstate excavations
RATHMELL ROAD 10/10/18 00:00 22/10/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map BEECH GROVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M1 24/10/18 19:00 25/10/18 06:00
Only events active within the next 30 days are shown on the map LILAC GROVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map MAPLE GROVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map ELM GROVE 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M621 14/11/18 21:30 15/11/18 06:00 M621 clockwise and anticlockwise Jct 27 to Jct 1 lane closures for technology works
05/11/18 00:00 09/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
M621 02/11/18 20:00 03/11/18 06:00 M621 clockwise and anticlockwise Jct 27 to Jct 1 lane closures for electrical works
NELSON STREET 07/11/18 00:00 13/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 5m of trench in footway to joint new cable and reinstate excavations
ABERFORD BY-PASS 23/10/18 19:00 24/10/18 06:00
CHURCH STREET 26/09/18 00:00 30/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY TO LAY NEW FIBRE OPTIC DUCTING
BROOKE STREET 27/09/18 00:00 07/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY TO LAY NEW FIBRE OPTIC DUCTING AND CABLE
ALBION STREET 27/09/18 00:00 24/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY TO INSTALL NEW FIBRE OPTIC DUCTING
LOWOOD LANE 05/11/18 00:00 09/11/18 23:59 New Connection - Excavate and locate cable, including 3 Joint holes in footway to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map M62 04/12/18 21:30 05/12/18 06:00 M62 eastbound Jct 25 to Jct 26 lane closures for technology works
COMPTON ROAD 28/10/18 00:00 28/10/18 23:59 New Connection - Excavate and locate cable, including 1 joint hole in footway to joint new cable and reinstate excavations. Walkway in carriageway
M62 08/11/18 21:30 09/11/18 06:00 M62 westbound Jct 26 road closure for technology works
QUEEN S PLACE 17/10/18 00:00 22/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footpath and 8m of trench in footpath and reinstate excavations
Only events active within the next 30 days are shown on the map BAWSON COURT 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map WOODLANDS ROAD 14/02/19 00:00 27/03/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
HOLDSWORTH COURT 04/10/18 00:00 14/11/18 23:59 TO EXCAVATE TO INSTALL UNDERGROUND DUCTING AND CHAMBERS
Only events active within the next 30 days are shown on the map M62 03/12/18 21:00 04/12/18 06:00 M62 eastbound Jct 25 to Jct 26 road closure and lane closures for technology works diversion route in place
OCCUPATION LANE 19/10/18 00:00 23/10/18 23:59 Complete carriageway crossing and small excavation in footway to extend existing Virgin Media network and lay duct in order to provide five customer connections
MOORSIDE 11/10/18 00:00 25/10/18 23:59 Gas Connection
Only events active within the next 30 days are shown on the map PEASELAND CLOSE 18/01/19 00:00 28/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM DUCT AND CABLE
BARWICK ROAD 09/11/18 00:00 15/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 15 of trench in verge to joint new cable and reinstate excavations. walkway for peds in grass verge while joint hole is dug, then while trench is done peds will be maintained in the footpath
PEARSON STREET 11/10/18 00:00 25/10/18 23:59 25m install gas and electric main
WESTGATE 19/10/18 00:00 29/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
WELLINGTON HILL 23/10/18 00:00 29/10/18 23:59 New Connection - Excavate and locate cable, including 2 x joint holes in footway to joint new cable and reinstate excavations
MOOR LANE 01/11/18 00:00 13/11/18 23:59 Cable Diversion - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint hole in footway.
COLLEGE GROVE VIEW 18/10/18 00:00 25/10/18 23:59 Service Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations.
WETHERBY ROAD 23/10/18 00:00 29/10/18 23:59 New Connection - Excavate and locate cable, including 2 x joint holes along grass verge and footway to joint new cable and reinstate excavations
BELLE VUE STREET 22/10/18 00:00 26/10/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 1 joint hole in footway and reinstate excavations
KEBBLE COURT 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND CABLE AND DUCT
BELLE VUE STREET 22/10/18 00:00 26/10/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 1 joint hole in footway and reinstate excavations.
Only events active within the next 30 days are shown on the map M62 20/11/18 20:00 21/11/18 06:00 M62 westbound Jct 27 to Jct 26 lane closures for technology works
QUARRY ROAD 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND CHAMBERS AND DUCT
UPPER LANE 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
BRAITHWAITE STREET 06/11/18 00:00 09/11/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 1 joint hole in footway and reinstate excavations. Disconnection to Rosemont Pharmaceuticals. Barriers may encroach into carriageway
24/09/18 00:00 26/10/18 23:59 Lay new duct for fibre optic connections in footway and carriageway
ALWOODLEY LANE 31/10/18 00:00 02/11/18 23:59 New Connection - Excavate and locate cable, including 1Joint hole in footway to joint new cable and reinstate excavations
NORMAN STREET 23/10/18 00:00 29/10/18 23:59 Placement of Temporary Traffic Signal Heads in conjunction with works on Morris Lane Reference QA761U1027318
M62 07/11/18 21:00 08/11/18 06:00 M62 westbound Jct 30 to Jct 29 road closures and lane closures for technology works diversion route in place
DEWSBURY ROAD 30/10/18 00:00 05/11/18 23:59 New Connection - Excavate and locate cable, including 1 x Joint hole in footway to joint new cable and reinstate excavations.
M62 26/10/18 20:00 27/10/18 06:00 M62 eastbound and westbound Jct 25 to Jct 26 lane closures for bridge inspections
NIBSHAW LANE 31/10/18 00:00 11/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M62 25/10/18 21:30 26/10/18 06:00 M62 westbound Jct 28 to Jct 27 road closure and lane closures for technology works. Diversion route in place.
BRIDGE STREET 25/10/18 00:00 29/10/18 23:59 Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Install 24m of 1 way poly duct in Footway,Install 6m of 1 way poly duct in Carriageway
SAXTON LANE 05/11/18 00:00 16/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 10m of trench in verge to joint new cable and reinstate excavations
CLIFF HOLLINS LANE 05/11/18 00:00 16/11/18 23:59 Bridge parapet remedial workd on Cringles bridge K0243
M1 24/10/18 20:00 25/10/18 06:00 M1 southbound Jct 40 full exit slip road closure and lane closures for carriageway repairs. Diversion route in place
WHINGATE 30/10/18 00:00 02/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
ACKTON LANE 01/11/18 00:00 07/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole and 10m of trench in footway to joint new cable and reinstate excavations
HALIFAX ROAD 26/10/18 00:00 26/10/18 23:59 TO MAKE INTERIM REINSTATEMENT PERMANENT
BRADFORD ROAD 18/10/18 00:00 26/10/18 23:59 Link Box Repair - Excavate to Install a new link box, joint new cables and reinstate excavations. Including 6m trench in footway.
A63 08/01/18 06:00 31/10/18 19:00 a63 western dumbbell roudabout lane 1 closed
WELLINGTON ROAD 26/10/18 00:00 30/10/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in footway. Barriers may encroach into carriageway
SEAFORTH GROVE 23/10/18 00:00 25/10/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1x Joint hole and 5m of trench in footway
MONK BRIDGE AVENUE 23/10/18 00:00 25/10/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in footway. Barriers may encroach into carriageway
MILL STREET 19/11/18 00:00 28/11/18 23:59 Lay approx. 50m of water main + connection
VICAR LANE 28/10/18 00:00 29/10/18 23:59 Remedial works to rectify defective reinstatement in carriageway - wrong material used.
SOUTH VIEW 13/11/18 00:00 15/11/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in concrete footway. Barriers may encroach into carriageway
ABERFORD BY-PASS 26/10/18 20:00 27/10/18 06:00 a1m southbound lane 3 and lane 4 closed mp 55.5 to m1 southbound 318.4
15/11/18 00:00 21/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway and 5m of trench in footway to joint new cable and reinstate excavations. For a new supply, for barriers. Working in conjusntion with Leeds City Council.
BROOMFIELD VIEW 22/10/18 00:00 24/10/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in footway. Barriers may encroach into carriageway
Only events active within the next 30 days are shown on the map MARTIN TERRACE 07/01/19 00:00 25/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 28 joint holes in footway and 155m of trench in footway. Footway occupied, pedestrians to use alternative footway.
Only events active within the next 30 days are shown on the map BANKFIELD TERRACE 14/01/19 00:00 25/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 10 joint holes in footway and 105m of trench in footway. Footway occupied, pedestrians to use opposite footway.
BRIGGATE 19/11/18 00:00 23/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole and 5m trench to joint new cable and reinstate excavations. Working in conjunction with LCC
Only events active within the next 30 days are shown on the map BANKFIELD ROAD 07/01/19 00:00 21/01/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 6m of trench in footway. Footway occupied, pedestrians to use other footway.
Only events active within the next 30 days are shown on the map ARGIE ROAD 03/01/19 00:00 24/01/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 6 joint holes in footway.
PONTEFRACT LANE 25/10/18 00:00 31/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
SUTHERLAND MOUNT 25/10/18 00:00 29/10/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in footway. Barriers may encroach into carriageway
M62 29/10/18 09:00 02/11/18 16:00 M62 westbound Jct 25 lane closures for carriageway improvements
M621 27/10/18 05:00 27/10/18 09:00 M621 anticlockwise Jct 1 to Jct 27 lane closures for barrier repair
PARK VIEW 27/10/18 00:00 30/10/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in tarmac footway. Barriers may encroach into carriageway
02/11/18 00:00 14/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 3m of trench in footway to joint new cable and reinstate excavations
HAREHILLS LANE 08/11/18 00:00 09/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole and 12m of trench in footway to joint new cable and reinstate excavations
WELLINGTON STREET 25/10/18 00:00 29/10/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway to joint new cable and reinstate excavations. Pedestrian walkway to be within lane closure
AIRE STREET 23/10/18 00:00 29/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway, and 9m road crossing to joint new cable and reinstate excavations. Working half and half at a time, priority boards to be used if needed.
WESLEY STREET 19/11/18 00:00 21/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and approx 15m of trench in footway and reinstate excavations
BRADFORD ROAD 01/05/14 00:00 01/05/19 23:59 Carriageway reconstruction
BRADFORD ROAD 01/05/14 00:00 01/05/19 23:59 Carriageway reconstruction
LEEDS ROAD 01/05/14 00:00 01/05/19 23:59 Carriageway reconstruction
DOMESTIC STREET 30/10/18 00:00 05/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations. For a new three phase supply.
Only events active within the next 30 days are shown on the map BURLEY LODGE ROAD 24/01/19 00:00 13/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 3 joint holes in footway and 15m of trench in footway, and 10m road crossing. Pedestrians to use alternate footway.
TOWN STREET 22/10/18 00:00 26/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations
NEW LANE 15/10/18 00:00 25/10/18 23:59 20m install gas main and gas road crossing and connection
LEEDS ROAD 31/10/18 00:00 06/11/18 23:59 Service replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 Joint hole in footway.
FENCOTE CRESCENT 13/10/18 00:00 22/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Alternative Footway in use
BURLEY LODGE STREET 24/10/18 00:00 13/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 5 joint holes in footway and 40m of trench in footway, and 7m road crossing
LAVENDER WALK 02/11/18 00:00 08/11/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 2 joint holes in footway and reinstate excavations
Only events active within the next 30 days are shown on the map BARNCROFT CLOSE 14/01/19 00:00 01/02/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 11 joint holes in footway and 130m of trench in footway. Pedestrians to use alternate footway.
HIGHFIELD ROAD 22/10/18 00:00 26/10/18 23:59 TO EXCAVATE IN FOOTPATH FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
BURLEY LODGE TERRACE 23/10/18 00:00 05/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 10m of trench in footway to install a 4 way link box. Pedestrians to use alternate footway.
Only events active within the next 30 days are shown on the map BURLEY ROAD 21/01/19 00:00 25/01/19 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 1 joint hole in footway and 5m of trench in footway. Pedestrians walkway in carriageway
M62 30/10/18 21:30 31/10/18 06:00 M62 eastbound Jct 26 road closure and lane closures for technology works diversion route in place
Only events active within the next 30 days are shown on the map M1 05/04/19 20:00 06/04/19 06:00 M1/A63 junction 45
TOPCLIFFE LANE 25/10/18 00:00 29/10/18 23:59 Service Replacement - Excavate and locate cable, joint new cable and reinstate excavations, including 1 x Joint hole in footway.
OUZLEWELL GREEN 29/10/18 00:00 21/12/18 23:59 Overhead Replacement ? Replacement of overhead lines with new underground cables. Including 400 meters of trench in footway and 9 meter road crossing.
M62 29/10/18 21:30 30/10/18 06:00 M62 eastbound Jct 26 to jct 27 lane closures for technology works
ASHGAP LANE 17/10/18 00:00 23/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Some carriageway incursions, walkway provided for pedestrians
ASH STREET 29/10/18 00:00 07/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
PEASELAND ROAD 29/10/18 00:00 07/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
SELBY ROAD 18/10/18 00:00 24/10/18 23:59 New Connection - Excavate and locate cable, including 1 joint hole in footway and 7m trench in footway to joint new cable and reinstate excavations
PARKSIDE ROAD 29/10/18 00:00 04/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 15m of trench and 3 joint holes in footway and 55m of trench in verge/footway/carriageway, and Xm road crossing
BURNUP GROVE 29/10/18 00:00 07/12/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M62 23/10/18 19:00 24/10/18 06:00 m62 westbound jct 29 to jct 28
GRANGE ROAD 03/10/18 00:00 13/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
Only events active within the next 30 days are shown on the map KIRK LANE 21/01/19 00:00 23/01/19 23:59 Cable Overlay - Excavate 1 x joint hole in footway to disconnect faulty cable, once overlay is complete
Only events active within the next 30 days are shown on the map KENMORE WAY 20/12/18 00:00 04/02/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
M62 01/10/18 09:30 15/11/19 15:30
KENMORE DRIVE 01/10/18 00:00 09/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
KENMORE VIEW 01/10/18 00:00 09/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND DUCTING AND CHAMBERS
Only events active within the next 30 days are shown on the map M62 05/12/18 21:30 06/12/18 06:00 M62 eastbound and westbound Jct 26 to Jct 27 road closures and lane closures for technology works diversion route in place
HAREHILLS LANE 14/08/18 00:00 28/10/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 20 Joint holes in footway and 120m of trench in footway, and 5 x 6m road crossing. 4 Way lights to be used Sndays only. Access to properties maintained, walkway in carriageway when needed.In conjunction with Harehills Lane.
BALNE LANE 29/10/18 00:00 09/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 85m of trench in footway, and 7m road crossing
STRATHMORE AVENUE 05/09/18 00:00 23/10/18 23:59 Cable Overlay - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 25 Joint holes and 8m road crossing
BALNE LANE 22/10/18 00:00 08/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 137m of trench in footway.
HAREHILLS LANE 22/07/18 00:00 04/11/18 23:59 Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 20 Joint holes in footway and 160m of trench in footway, and 13mm road crossing. Road Crossing to be done under 2 way lights. Works at junction of Foundry Approach to be done under 4 way lihts on Sundays only. In conjuction with Strathmore Avenue,
POPELEY RISE 21/09/18 00:00 26/10/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map KIRKSTONE DRIVE 22/11/18 00:00 07/01/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
19/09/18 00:00 30/10/18 23:59 Lay new duct for fibre optic connections in footway
Only events active within the next 30 days are shown on the map THE COPPICE 22/11/18 00:00 07/01/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
22/10/18 00:00 23/11/18 23:59 Lay new duct for fibre optic connections in carriageway
KING STREET 22/10/18 00:00 30/11/18 23:59 Lay new duct for fibre optic connections in carriageway
HEATON AVENUE 08/10/18 00:00 16/11/18 23:59 TO EXCAVATE TO INSTALL UNDERGROUND DUCTING AND CHAMBERS
M62 24/10/18 22:00 25/10/18 06:00 M62 westbound Jct 27 to Jct 26 lane closures for barrier repair
VALLEY ROAD 18/10/18 00:00 24/10/18 23:59 Low Voltage Mains Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. Walkway Out in carriageway, Barriers and vehicles in carriageway
M62 08/11/18 21:30 09/11/18 06:00 M62 westbound Jct 28 to Jct 27 lane closures for technology works
SECOND AVENUE 23/10/18 00:00 25/10/18 23:59 UNBLOCK DUCT
WESTBURN PLACE 22/10/18 00:00 30/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
BRAMHOPE ROAD 01/10/18 00:00 09/11/18 23:59 TO EXCAVATE TO INSTALL UNDERGROUND DUCTING AND CHAMBERS
05/10/18 00:00 15/11/18 23:59 TO EXCAVATE IN INSTALL UNDERGROUND DUCTING AND CHAMBERS
M1 31/10/18 20:00 01/11/18 06:00 M1 northbound and southbound Jct 41 lane closures for landscaping works
WHITCLIFFE ROAD 01/10/18 00:00 09/11/18 23:59 TO EXCAVATE TO INSTALL UNDERGROUND DUCTING AND CHAMBERS
UPPER TOWN STREET 30/10/18 00:00 01/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway to joint new cable and reinstate excavations. For new 3 phase supply. Walkway in carriageway.
22/10/18 00:00 02/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in verge and 30m of trench in verge, and 5m road crossing to joint new cable and reinstate excavations for new substation at Plot M, logic Leeds. Bridleway to be kept open at all times.
Only events active within the next 30 days are shown on the map M62 03/01/19 20:00 04/01/19 06:00 M62 eastbound Jct 31 to Jct 32 lane closures for inspections
HOPE STREET 31/10/18 00:00 02/11/18 23:59 Disconnection of Supply - Excavate and locate cable, carry out disconnection, including 1 joint hole in verge and reinstate excavations
CHURCH LANE 05/11/18 00:00 15/11/18 23:59 New Connection - Excavate and locate cable, including 4m of trench in unmade verge, and 8m road crossing to joint new cable and reinstate excavations
PARK LANE 13/11/18 00:00 19/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 3m of trench in grass verge, and 7m road crossing, and 3m of trench in grass verge and 2m trench in footway to joint new cable and reinstate excavations. Priority boards to be used to maintain traffic flow
ALBION STREET 16/11/18 00:00 22/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway and 5m of trench in footway to joint new cable and reinstate excavations. For a new supply, for barriers. Working in conjusntion with Leeds City Council.
BRIGGATE 14/11/18 00:00 20/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway and 5m of trench in footway to joint new cable and reinstate excavations. For a new supply, for barriers. Working in conjusntion with Leeds City Council.
KENMORE CLOSE 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND CHAMBERS
TURNSTEADS MOUNT 17/10/18 00:00 27/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUNF CABLE AND DUCT
TURNSTEADS CRESCENT 17/10/18 00:00 27/11/18 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF UNDERGROUND CABLE AND DUCT
13/11/18 00:00 19/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint holes in footway and 5m of trench in footway to joint new cable and reinstate excavations. For a new supply, for barriers. Working in conjusntion with Leeds City Council.
Only events active within the next 30 days are shown on the map OXFORD ROAD 22/11/18 00:00 07/01/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
Only events active within the next 30 days are shown on the map CHURCH LANE 22/11/18 00:00 07/01/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
M1 30/10/18 19:00 31/10/18 06:00 m1 northbound lane 1 and lane 2 closed mp 303.5 to mp 304.2
LEDSTON MILL LANE 24/10/18 00:00 31/10/18 23:59 Overhead Replacement - Installation of replacement of new overhead lines and overhead conductors as part of ongoing works to reinforce the network, Diversion route to be installed.
BARNSDALE ROAD 19/10/18 00:00 01/11/18 23:59 Overhead Replacement - Replacement of overhead conductor to reinforce network, Install scaffold netting over Barnsdale Road on 20/10/2018 and to removed netting on 27/10/2018. - Works to be done under Road closure. Diversion route to be installed.
M1 05/11/18 21:00 06/11/18 06:00 M1 northbound Jct 42 lane closures for barrier repair works.
BARNSDALE ROAD 29/10/18 00:00 02/11/18 23:59 Overhead Replacement ? Traffic Management only (2 way signals) to allow for recovery of scaffolding.
KENMORE GROVE 18/10/18 00:00 28/11/18 23:59 TO EXCAVATE IN FOOTWAY FOR INSTALLATION OF UNDERGROUND CABLE AND DUCT
BACK NEWTON LANE 06/11/18 00:00 12/11/18 23:59 Overhead Replacement - Installation of replacement overhead conductors as part of ongoing works to reinforce the network
TURNSTEADS DRIVE 19/10/18 00:00 29/11/18 23:59 TO EXCAVATE IN FOOTWAY FOR INSTALLATION OF UNDERGROUND CABLE AND DUCT
BACK NEWTON LANE 06/11/18 00:00 30/11/18 23:59 Overhead Replacement - Installation of replacement overhead conductors as part of ongoing works to reinforce the network
Only events active within the next 30 days are shown on the map 03/12/18 00:00 16/01/19 23:59 TO EXCAVATE IN FOOTWAY AND CARRIAGEWAY FOR INSTALLATION OF NEW VM CABLE AND DUCT
BARNSDALE ROAD 15/10/18 00:00 26/10/18 23:59 Vegetation Management ?2 way lights so vegetation clearance can be conducted either side of the road then scaffold installed either side of the road, this is to make way for the construction of a new Extra High Voltage electricity Overhead Lines going into Ledston substation
CASTLEY LANE 17/10/18 00:00 29/10/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in verge and 5m road crossing to joint new cable and reinstate excavations
Only events active within the next 30 days are shown on the map M62 15/12/18 20:00 16/12/18 06:00 M62 eastbound and westbound Jct 26 to Jct 27 road closure for cable works diversion route in place
Only events active within the next 30 days are shown on the map BLAKERIDGE LANE 23/02/20 00:00 26/02/20 23:59 Remedial repair of DEFECT VM/DEF/048344. Original Notice NK100/NOBG/4037357M
Only events active within the next 30 days are shown on the map COLORADO WAY 04/12/18 00:00 10/12/18 23:59 New Connection - Excavate and locate cable, including 2 Joint holes in footway and 10m road crossing to joint new cable and reinstate excavations
BACK NEWTON LANE 17/10/18 00:00 26/10/18 23:59 Overhead Replacement - Replacement of overhead conductor to reinforce network - Traffic Management only - 2 way lights.
KIRKGATE 29/10/18 00:00 08/11/18 23:59 New Connection - Excavate and locate cable, including 1 Joint hole in footway and 5m of trench in footway to joint new cable and reinstate excavations. Footway closure approved by Jim McCormick.
BACK NEWTON LANE 17/10/18 00:00 26/10/18 23:59 Overhead Replacement - Replacement of Low Voltage overhead conductor to reinforce network