HALTON MOOR ROAD |
27/09/21 23:00 |
01/10/21 22:59 |
Build 2 concrete chamber 915mm x 445mm x 965mm deep in
Footway,Demolish 1 existing jointbox(s) or cabinet base(s),Install 15m of 2
poly ducts in Carriageway,Install 50m of 2 poly ducts in Verge,Install 5m of
2 poly ducts in Footway |
|
TYERSAL LANE |
20/09/21 23:00 |
23/09/21 22:59 |
|
|
WELLINGTON STREET |
18/10/21 07:00 |
19/11/21 23:55 |
|
|
LEEDS ROAD |
26/04/20 23:00 |
25/10/21 22:59 |
30 MPH speed limit reduction for ELOR construction. 06:00 Monday 27 April 2020 - 06:00 Monday 25 Oc... |
|
BUDE ROAD |
20/09/21 23:00 |
21/09/21 22:59 |
|
|
SOOTHILL LANE |
15/09/21 13:00 |
21/09/21 22:59 |
|
|
SKELTONS LANE |
26/04/20 23:00 |
25/10/21 22:59 |
30 MPH speed limit reduction for ELOR construction. 06:00 Monday 27 April 2020 - 06:00 Monday 25 Oc... |
|
A64 |
26/04/20 23:00 |
25/10/21 22:59 |
30 MPH speed limit reduction for ELOR construction. 06:00 Monday 27 April 2020 - 06:00 Monday 25 Oc... |
|
COAL ROAD |
26/04/20 23:00 |
25/10/21 22:59 |
30 MPH speed limit reduction for ELOR construction. 06:00 Monday 27 April 2020 - 06:00 Monday 25 Oc... |
|
WELLINGTON STREET |
05/10/21 19:00 |
06/10/21 05:30 |
Trial hole works |
|
CASTLE INGS DRIVE |
21/10/21 07:00 |
25/10/21 16:00 |
Install water meter to supply pipe |
|
WETHERBY ROAD |
26/04/20 23:00 |
25/10/21 22:59 |
30 MPH speed limit reduction for ELOR construction. 06:00 Monday 27 April 2020 - 06:00 Monday 25 Oc... |
|
RING ROAD (SHADWELL) |
26/04/20 23:00 |
25/10/21 22:59 |
30 MPH speed limit reduction for ELOR construction. 06:00 Monday 27 April 2020 - 06:00 Monday 25 Oc... |
|
TARNSIDE DRIVE |
17/09/21 07:00 |
23/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 2 joint holes + 10m trench in footway |
|
ABERFIELD MOUNT |
15/09/21 08:59 |
21/09/21 22:59 |
Repair leaking water supply pipe |
|
LAUREL STREET |
09/12/21 08:00 |
22/12/21 23:59 |
Connection only in conjunction with works on Chapel Lane. |
|
NEW YORK ROAD |
06/11/21 20:00 |
11/11/21 05:30 |
Regent Street Reconstruction Scheme. Shuttering - North West Wing Wall. Road Closure from 20:00 to 05:30 with diversion. |
|
HIGH WOOD ROAD |
23/09/21 07:00 |
29/09/21 15:00 |
|
|
SHAKESPEARE GARDENS |
29/09/21 07:00 |
04/10/21 16:30 |
Excavate approx. 10m of footway and build cabinet and chamber connecting into existing network. |
|
GRAVELEYTHORPE ROAD |
28/09/21 23:00 |
29/09/21 22:59 |
Renew stop tap + chamber |
|
HIGH STREET |
07/03/22 22:00 |
08/03/22 23:59 |
Level Crossing Testing. Hours of works 22.00 - 06.00... |
|
COCKSHOTT LANE |
15/10/21 08:30 |
15/10/21 14:30 |
Minor, non-excavation works. Give/Take to be installed with all chapter 8 signage, cones and barriers. Delivery vehicle to park and offload Cherry Picker to access telecoms mast on private church for testing / maintenance works. |
|
WEETWOOD LANE |
24/09/21 07:00 |
11/11/21 17:30 |
Excavate 2 x carriagway crossings and footway to allow for continuation of CityFibre build. |
|
BROADWAY |
17/10/21 23:00 |
23/10/21 22:59 |
Excavation - Works to be carried out to install new 5G telecommunications Pole. Hiab and cherry picker to be on site on the first day for the install. Cherry picker to be on site provisionally for the rest of the week as well as the TM. we will reduce the TM down as soon as possible. |
|
STONEY ROCK LANE |
29/09/21 07:00 |
04/10/21 16:30 |
Excavate approx 10m of footway to build chamber and cabinet and connect into existing network. |
|
BENSON STREET |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate in footway and carriageway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
GRANGE DRIVE |
27/09/21 07:00 |
11/10/21 22:59 |
Connection only in conjunction with works on Grange Drive. |
|
BACK BALDOVAN TERRACE |
06/10/21 23:00 |
07/10/21 22:59 |
Install stop tap + chamber |
|
BRADFORD ROAD |
08/10/21 07:00 |
08/10/21 16:00 |
Install water meter to supply pipe |
|
CHAPEL LANE |
15/12/21 08:00 |
24/12/21 23:59 |
Connection only in conjunction with works on Chapel Lane |
|
NABURN ROAD |
27/09/21 07:00 |
11/10/21 22:59 |
|
|
NABURN PLACE |
04/10/21 07:00 |
18/10/21 22:59 |
Abandon 106.66m of 4SI and replace with 50.42m of 63mmPE, 56.24m of 75mmPE by Dead Insert.
Relays x 16 Connections x 2 Transfers x 11 |
|
DARTMOUTH WAY |
26/09/21 07:00 |
26/09/21 16:00 |
renew fire hydrant |
|
LAUREL GROVE |
09/12/21 08:00 |
22/12/21 23:59 |
Connection only in conjunction with works on Chapel Lane |
|
PARNABY ROAD |
15/11/21 00:00 |
19/11/21 23:59 |
DfT Cwy resurfacing |
|
LAUREL PLACE |
15/12/21 08:00 |
24/12/21 23:59 |
Connection only in conjunction with works on Chapel Lane. |
|
LINTON ROAD |
25/08/20 23:00 |
25/01/22 23:59 |
No waiting at any time restriction Linton Common to 75m past junction of Beck Lane... |
|
PARRY LANE |
18/10/21 07:00 |
29/10/21 17:00 |
|
|
WELLINGTON STREET |
21/09/21 08:30 |
21/09/21 14:30 |
Switch around controller as it at present opens towards the carriageway |
|
MARSH LANE |
30/04/21 23:00 |
10/02/22 23:59 |
Contraflow on Westbound Carriageway with closure of Eastbound Carriageway for demolition and reconstruction of three north spans of Regent Street Flyover. Suspension of section of bus lane on A64(M) York Road eastbound carriageway. 24 hours a day. |
|
MOORLAND CLOSE |
15/10/21 07:00 |
15/10/21 16:00 |
Install water meter to supply pipe |
|
YORK ROAD |
30/04/21 23:00 |
10/02/22 23:59 |
Contraflow on Westbound Carriageway with closure of Eastbound Carriageway for demolition and reconstruction of three north spans of Regent Street Flyover. Suspension of section of bus lane on A64(M) York Road eastbound carriageway. 24 hours a day. |
|
INNER RING ROAD |
19/04/21 23:00 |
10/02/22 23:59 |
Slip road closure for demolition of north spans of Regent Street Flyover. Road closure with diversion. 24 hours a day. |
|
A64(M |
19/04/21 23:00 |
10/02/22 23:59 |
Slip road closure for demolition of north spans of Regent Street Flyover. Road closure. 24 hours a day.Advance signage - no diversion |
|
BIRKDALE ROAD |
15/11/21 08:00 |
19/11/21 18:00 |
resurfacing |
|
MARSH LANE |
19/04/21 23:00 |
10/02/22 23:59 |
Contraflow on Westbound Carriageway with closure of Eastbound Carriageway for demolition and reconstruction of three north spans of Regent Street Flyover. Suspension of section of bus lane on A64(M) York Road eastbound carriageway. 24 hours a day. |
|
YORK ROAD |
19/04/21 23:00 |
10/02/22 23:59 |
Contraflow on Westbound Carriageway with closure of Eastbound Carriageway for demolition and reconstruction of three north spans of Regent Street Flyover. Suspension of section of bus lane on A64(M) York Road eastbound carriageway. 24 hours a day. |
|
CAMBRIDGE WAY |
20/09/21 07:00 |
22/09/21 15:30 |
Excavation to install new telecoms pole |
|
ST CLAIR ROAD |
20/09/21 07:00 |
22/09/21 15:30 |
Works to excavate and install new telecoms pole |
|
|
15/09/21 08:00 |
28/09/21 16:00 |
excavate to transfer service from old column to new column |
|
|
27/09/21 06:30 |
11/10/21 22:59 |
Abandon 10m of 2ST and replace for 10m of 40mmPE by Dead Insert.
Relays x 0 Connections x 2 Transfers x 0 |
|
INNER RING ROAD |
30/04/21 23:00 |
10/02/22 23:59 |
Slip road closure for demolition of north spans of Regent Street Flyover. Road closure with diversion. 24 hours a day. |
|
A64(M |
30/04/21 23:00 |
10/02/22 23:59 |
Slip road closure for demolition of north spans of Regent Street Flyover. Road closure. 24 hours a day.Advance signage - no diversion |
|
NEPTUNE STREET |
08/06/20 23:00 |
07/12/21 23:59 |
Suspension of existing pay by telephone parking bays adjacent to Trinity One. 3 additional permit ba... |
|
COTTINGLEY DRIVE |
15/11/21 08:00 |
26/11/21 23:59 |
|
|
CLARENDON WAY |
10/10/21 23:00 |
20/10/21 22:59 |
10m CW, FW6 Box. |
|
LEEDS ROAD |
24/07/22 23:00 |
22/08/22 22:59 |
NRSWA_Permit_Leeds Road, Leeds
Abandon 566.61m of 6 CI + ST, replace with 566.61m of 125mm PE by Dead Inserted
Connections x 4 Relays x 0 Transfers x 0 |
|
WHITWOOD COMMON LANE |
27/09/21 07:00 |
05/10/21 16:00 |
LAY NEW MP SERVICE - 17M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - TWO WAY LIGHTS - PEDS TO USE FOOTWAY AS USUAL |
|
IVY GROVE |
16/09/21 08:40 |
22/09/21 22:59 |
Public Lighting Cable Fault ? Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations. |
|
MELBOURNE STREET |
21/09/21 07:00 |
28/09/21 16:30 |
Excavate to dig 120m of track in the footway, with carriageway to be used if footway is congested, connecting into existing network and building chambers and cabinets where required for cityfibre build |
|
MENSTON OLD LANE |
08/11/21 08:00 |
26/11/21 16:00 |
|
|
STOCKS HILL |
15/06/21 23:00 |
28/01/22 23:59 |
Alteration of kerbline within bus interchange. New Road created through central reserve located within Bus Station. Some incursion onto Bramley Town Street as existing kerbline junction with Town Street is adjusted. |
|
HILL CRESCENT |
08/11/21 08:00 |
26/11/21 16:00 |
|
|
TARNSIDE DRIVE |
27/06/21 23:00 |
01/10/21 22:59 |
New houses are being built within the waste land between Tarnside Rd and Hawkshead Crescent either side of the road is being developed and both sides have connections from the sewer network to be brough onto site. The works consist of 6 new sewer connection within the road, depths ranging from 3.5m deep to 2m deep, trench length average 10m long for each of the connections, each connection will require footpaths closing for the side of the road the operatives are working. |
|
SOUTH ACCOMMODATION ROAD |
08/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
|
18/10/21 20:30 |
18/10/21 22:30 |
REPLACE MANHOLE FRAME AND COVER |
|
KENSINGTON ROAD |
26/09/21 23:00 |
29/09/21 22:59 |
Renew leaking water supply pipe |
|
MERRION WAY |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
MERRION STREET |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
MARSH LANE |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
ELLAND ROAD |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
|
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
BACK GATHORNE STREET |
16/09/21 11:00 |
23/09/21 16:00 |
excavate and repair sewer |
|
WOODHOUSE STREET |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
NEW YORK ROAD |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
NORTH STREET |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
MERRION STREET |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
CHADWICK STREET |
15/03/21 00:00 |
15/08/22 22:59 |
Road closure required for safety during construction works... |
|
GANNERS LANE |
20/09/21 23:00 |
23/09/21 22:59 |
LOCATE AND CLEAR DUCT BLOCKAGES |
|
CROSS GATES ROAD |
01/06/21 08:00 |
04/02/22 15:30 |
Advanced lane closure for new signalised junction, segregated and shared cycleway / footways, controlled crossings and central reservation works. |
|
AIREVILLE TERRACE |
08/09/21 23:00 |
06/10/21 22:59 |
|
|
QUEEN ELIZABETH DRIVE |
12/10/21 08:30 |
13/10/21 14:30 |
Substation Replacement - Traffic Management Only - Two way lights to enable vehicles to park in work zone for remove of items from old substation/delivery of items for new substation |
|
BRUNSWICK TERRACE |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
CORFE CLOSE |
04/10/21 08:00 |
14/10/21 16:00 |
|
|
WOODHOUSE LANE |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
EPWORTH PLACE |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
GREAT GEORGE STREET |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
JOSEPH STREET |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
BRIGGATE |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
APPERLEY LANE |
07/11/21 08:00 |
07/11/21 16:00 |
|
|
STAFFORD STREET |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
WOODHOUSE LANE |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
FORSTER STREET |
25/11/19 08:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
CROWN POINT ROAD |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
A61 |
27/11/19 08:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision.Some Carriageway incursion on days and Lane closure for nights between 19:30 and 06:00 |
|
MERRION WAY |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
LOVELL PARK ROAD |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
NABURN ROAD |
22/09/21 23:00 |
27/09/21 22:59 |
Excavate in verge and footpath to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
VICAR LANE |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
SHAKESPEARE LAWN |
29/09/21 07:00 |
04/10/21 16:30 |
Excavate approx. 10m in the footway and build cabinet and chamber connecting into existing network. |
|
SUSSEX AVENUE |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
GEORGE MANN ROAD |
25/11/19 07:00 |
15/10/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
BALMORAL CHASE |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
SEVERN ROAD |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
OLD MILL LANE |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision.Some Carriageway incursion on days and Lane closure for nights between 19:30 and 06:00 |
|
TUNSTALL ROAD |
02/04/22 23:00 |
03/04/22 22:59 |
EVENT - LEEDS ARENA - War of the Worlds: Alive on Stage - Strategic route for the Arena and heavier... |
|
WHARFEDALE ROAD |
06/10/21 07:00 |
14/10/21 17:00 |
|
|
HAREWOOD AVENUE |
24/09/21 07:00 |
30/09/21 16:00 |
ALTER EXISTING GAS SERVICE - WORKS IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
A64(M |
12/06/20 23:00 |
05/10/21 22:59 |
Closure of slip road required for Leeds City Council (Bridges) for installation of contraflow on A64... |
|
INNER RING ROAD |
09/02/21 00:00 |
05/10/21 22:59 |
Closure of slip road required for Leeds City Council (Bridges) for installation of contraflow on A64... |
|
HOWDEN CLOUGH ROAD |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
NEW YORK ROAD |
10/05/20 23:00 |
05/10/21 22:59 |
Road closure required for Leeds City Council (Bridges) to allow for the demolition and construction... |
|
LEATHLEY LANE |
04/10/21 07:00 |
12/10/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in verge, 3m trench in footway and 8m road crossing |
|
WILLANS AVENUE |
05/10/21 11:00 |
05/10/21 15:00 |
Install water meter to supply pipe |
|
BELLE ISLE ROAD |
19/09/21 23:00 |
01/10/21 22:59 |
Kerbing + Footway works |
|
BEDFORD STREET |
17/09/21 07:00 |
28/09/21 15:30 |
Cable Diversion - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint hole in footway 5m x 1.5m |
|
|
09/11/21 08:00 |
15/11/21 17:00 |
LAY 2 X NEW SERVICES - 10M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
SELBY ROAD |
24/09/21 11:00 |
24/09/21 15:00 |
|
|
WHITEHALL ROAD EAST |
11/11/20 10:00 |
30/09/21 14:30 |
Temp traffic island due to covid |
|
WELLINGTON STREET |
21/09/21 08:30 |
21/09/21 14:30 |
Switch around controller as it at present opens towards the carriageway |
|
BISHOPGATE STREET |
19/09/21 23:00 |
01/10/21 22:59 |
Trial Holes |
|
NEWPORT ROAD |
16/09/21 07:00 |
29/09/21 16:30 |
|
|
WHACK HOUSE LANE |
17/09/21 07:00 |
30/09/21 22:59 |
|
|
GLEN ROAD |
21/09/21 07:00 |
04/10/21 16:30 |
|
|
MOORCROFT DRIVE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
ROOK S NEST ROAD |
22/09/21 07:00 |
22/09/21 18:00 |
Install stop tap + chamber |
|
CARLTON VIEW |
15/09/21 19:50 |
22/09/21 17:00 |
Service cable fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavation |
|
SISSONS ROAD |
23/09/21 07:00 |
29/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes and 3m trench in footway |
|
COTTINGLEY DRIVE |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
HIGH STREET |
19/09/21 23:00 |
24/09/21 22:59 |
To install FW 3 and road crossing. |
|
SNYDALE ROAD |
19/09/21 23:00 |
24/09/21 22:59 |
50M of overlay. |
|
WHARNCLIFFE DRIVE |
13/06/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
GLENEAGLES DRIVE |
23/09/21 23:00 |
30/09/21 22:59 |
2 x FW 2 chambers. |
|
HARTLEY STREET |
21/09/21 23:00 |
22/09/21 22:59 |
Renew stop tap + chamber |
|
LAKESIDE PARK |
22/09/21 23:00 |
29/09/21 22:59 |
To install 2 x FW chambers. |
|
KINGSTON DRIVE |
21/09/21 23:00 |
28/09/21 22:59 |
To install a FW 2 and 5m of track. |
|
SNYDALE GROVE |
20/09/21 23:00 |
27/09/21 22:59 |
FW 2 and 5M of track. |
|
TONG STREET |
13/06/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
WINDSOR CLOSE |
23/09/21 23:00 |
30/09/21 22:59 |
To clear a blockages. |
|
QUEENSBURY COURT |
23/09/21 23:00 |
30/09/21 22:59 |
To clear a blockage. |
|
BURLEY ROAD |
13/09/21 07:00 |
24/09/21 15:00 |
|
|
FERNBANK |
21/10/21 23:00 |
28/10/21 22:59 |
renew fire hydrant |
|
KNOWLES LANE |
20/09/21 23:00 |
21/09/21 22:59 |
|
|
WEBSTER STREET |
22/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street lights (3 of) |
|
BIRKDALE ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
|
|
HAIGH MOOR ROAD |
10/10/21 23:00 |
11/10/21 22:59 |
Install stop tap + chamber |
|
ST AUGUSTINE S TERRACE |
24/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street lights (2 of) |
|
AMERICA MOOR LANE |
15/11/21 07:30 |
29/11/21 23:59 |
|
|
HARLINGTON ROAD |
18/10/21 06:30 |
26/11/21 23:59 |
|
|
BRITANNIA ROAD |
23/08/21 08:00 |
15/10/21 22:59 |
|
|
STUART ROAD |
14/10/21 07:00 |
20/10/21 16:00 |
LAY NEW SERVICE - 2M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE FOOTWAY AS USUAL |
|
HOMEFIELD AVENUE |
14/09/21 07:00 |
28/09/21 22:59 |
NSWRA, Homefield Avenue, Leeds. Abandon 145.84m of 4 SI and lay 145.83m of 90mm PE.
Transfer x 17 Relay x 26 Connections x 1 |
|
LANSDALE COURT |
16/09/21 08:00 |
21/09/21 22:59 |
|
|
TRAFFORD GROVE |
23/09/21 07:00 |
29/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in footway 5m trench in footway |
|
BELLBROOKE GROVE |
22/09/21 07:00 |
22/09/21 16:00 |
Renew stop tap + chamber |
|
TONG STREET |
06/10/21 18:00 |
06/10/21 20:30 |
|
|
CLARENDON WAY |
20/09/21 18:00 |
22/09/21 04:00 |
Non Excavation-Lighthead in place as pert of 4 way signals on Calverley Street |
|
PRINCE S WAY |
13/06/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
WAKEFIELD ROAD |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
|
26/09/21 23:00 |
01/10/21 22:59 |
Disconnect water supply |
|
QUEENSWOOD ROAD |
22/09/21 07:00 |
22/09/21 16:00 |
Install stop tap + chamber |
|
BOAR LANE |
12/09/21 23:00 |
12/11/21 23:59 |
Major highway realignment and junction improvement works |
|
WESTFIELD LANE |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate 1 location/s and install copper earthing strip to en |
|
WESTDALE DRIVE |
20/09/21 07:00 |
22/09/21 16:30 |
Carry out remedial works to clear outstanding defects. |
|
NORMANTON PLACE |
09/09/21 07:50 |
22/09/21 22:59 |
Cable Overlay (Low Voltage) ? Excavation of 1 trial holes in footway for investigation purposes. Reinstate excavations as interim. To be made permanent when cable overlay works are completed |
|
MORRIS LANE |
20/09/21 07:00 |
22/09/21 16:30 |
Excavate 45m of footway track for CityFibre new build. |
|
KNOWLES LANE |
12/09/21 23:00 |
24/09/21 22:59 |
|
|
VICAR LANE |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
LOVELL PARK ROAD |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
MERRION WAY |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
NEWPORT VIEW |
17/09/21 07:00 |
27/09/21 16:30 |
|
|
CROWN POINT ROAD |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
WOODHOUSE LANE |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
BRIGGATE |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
GREAT GEORGE STREET |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
WOODHOUSE LANE |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
YORK ROAD |
12/06/20 23:00 |
05/10/21 22:59 |
Speed limit reduction from 40mph to 30mph on the A64/A64(M) contraflow on both the East and West bou... |
|
NEW YORK ROAD |
12/06/20 23:00 |
05/10/21 22:59 |
Speed limit reduction from 40mph to 30mph on the A64/A64(M) contraflow on both the East and West bou... |
|
MEADOW LANE |
23/03/20 09:30 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. |
|
KING S ROAD |
01/09/21 08:30 |
31/03/22 22:59 |
Carriageway Resurfacing |
|
WOODHOUSE STREET |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
|
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
MERRION STREET |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
WESTGATE |
19/09/21 23:00 |
21/09/21 22:59 |
|
|
MERRION STREET |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
MERRION WAY |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
NORTH STREET |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
NEW YORK ROAD |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
GREENFIELD AVENUE |
23/09/21 07:00 |
23/09/21 19:00 |
Renew stop tap + chamber |
|
BIRCH LANE |
01/11/21 08:00 |
19/11/21 23:59 |
|
|
TUNSTALL ROAD |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
ELLAND ROAD |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
MARSH LANE |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
TONG STREET |
09/10/21 23:00 |
31/10/21 23:59 |
Carriageway Resurfacing |
|
PONTEFRACT LANE |
27/01/21 00:00 |
27/01/22 23:59 |
Road closure required to complete the residential development.... |
|
BRUNSWICK TERRACE |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
|
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
GREEN LANE |
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
OTLEY ROAD |
04/10/21 07:00 |
15/10/21 16:30 |
Excavate in the carriageway + grass verge to install CityFibre apparatus, CityFibre build. |
|
SPEEDWELL MOUNT |
07/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
WOODHOUSE STREET |
07/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
MERRION STREET |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
HAREHILLS LANE |
17/09/21 07:30 |
23/09/21 15:30 |
LAY NEW SERVIE - 1M IN PUBLIC - 10M IN PRIVATE - NGN TO EX ALL |
|
MARDALE CRESCENT |
04/10/21 06:30 |
23/10/21 16:00 |
New houses are being built within the waste land on Marsdale cresent and is being developed and have connections from the sewer network to be brough onto site.
The works consist of 2 new sewer connection within the road, depths ranging from 3.5m deep to 2m deep, trench length average 10m long for each of the connections, each connection will require footpaths closing at the side of the road to the site. The opposite side of the road will be open for foot traffic. |
|
ELLAND ROAD |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
BELL LANE |
21/09/21 18:00 |
21/09/21 20:30 |
No excavation, light head only |
|
MARSH LANE |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
MERRION STREET |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
MERRION WAY |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
NORTH STREET |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
VICTORIA STREET |
16/09/21 07:00 |
22/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in footway |
|
NEW YORK ROAD |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
WOODHOUSE STREET |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
HOLBECK MOOR ROAD |
01/11/21 00:00 |
10/11/21 23:59 |
Cwy surfacing |
|
|
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
DOMESTIC STREET |
01/11/21 00:00 |
10/11/21 23:59 |
Cwy surfacing |
|
TUNSTALL ROAD |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
JAMES STREET |
06/12/21 00:00 |
10/12/21 23:59 |
Point Closure for work on Oxford Street |
|
WEST PARK DRIVE (WEST) |
16/09/21 07:30 |
22/09/21 15:30 |
LAY NEW SERVICE - 3M IN PUBLIC - 11M IN PRIVATE - NGN TO EX PUB ONLY |
|
MEADOW LANE |
04/01/21 07:00 |
18/11/21 18:00 |
LPTIP works - Various overnight closures of carriageways, and permenant changes to road layout |
|
VICAR LANE |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
LOVELL PARK ROAD |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
GREAT GEORGE STREET |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
ELMETE MOUNT |
15/02/22 08:00 |
28/02/22 23:59 |
|
|
WOODHOUSE LANE |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
BROAD LANE |
21/09/21 18:00 |
21/09/21 20:30 |
REPLACE MANHOLE FRAME + COVER |
|
MEADOW LANE |
12/09/21 23:00 |
23/06/22 22:59 |
LPTIP WORKS - Changes to Great Wilson Street junction as part of Meadow Lane layout changes |
|
MERRION WAY |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
TONG STREET |
09/10/21 23:00 |
31/10/21 23:59 |
Carriageway Resurfacing |
|
WATER LANE |
04/01/21 07:00 |
28/01/22 23:59 |
LPTIP WORKS - changes to road layout as part of new Meadow Lane permanent layout. |
|
CROWN POINT ROAD |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
WOODHOUSE LANE |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
KENDELL STREET |
05/03/21 07:00 |
28/02/22 23:59 |
LPTIP WORKS - Layout changes as part of Meadow Lane scheme |
|
BRIGGATE |
03/10/21 23:00 |
04/10/21 22:59 |
EVENT - LEEDS ARENA - The Four Tops and The Temptations - 18:30 start... |
|
DE LACY MOUNT |
23/09/21 07:00 |
06/10/21 16:30 |
Excavate 9m of Carriageway and 30m Footway Flagstones for CityFibre new build. |
|
MOOR END LANE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
ELLAR GARDENS |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
SILK MILL AVENUE |
28/09/21 11:00 |
28/09/21 15:00 |
|
|
AIRE STREET |
03/01/22 00:00 |
02/12/22 23:59 |
Major Highway Realignment and Junction Improvement |
|
MOORGATE DRIVE |
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
HARROGATE ROAD |
15/11/19 00:00 |
13/11/21 23:59 |
Two-way Signals to facilitate emergency tree cutting work - Fri - 09:30-15:30.... |
|
EAST PARK ROAD |
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
OSMONDTHORPE LANE |
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
AMBERTON TERRACE |
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
YORK ROAD |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
SHELLDRAKE DRIVE |
06/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
NORTH LANE |
17/01/22 08:00 |
28/01/22 23:59 |
|
|
BRADFORD ROAD |
06/12/21 00:00 |
17/12/21 23:59 |
TEMPORARY 3-WAY TRAFFIC SIGNALS WILL BE REQUIRED ON BRADFORD ROAD AT THE JUNCTION WITH BOOTH STREET WHILE WORK ON BOOTH STREET IS BEING CARRIED OUT |
|
HELSTON ROAD |
06/10/21 07:00 |
06/10/21 16:00 |
Renew stop tap + chamber |
|
NORMAN GROVE |
20/09/21 07:00 |
22/09/21 16:30 |
Excavate approx 40m of track in the footway to install apparatus for CityFibre new build. |
|
HARROGATE ROAD |
27/10/21 07:00 |
27/10/21 11:00 |
Install water meter to supply pipe |
|
NORMAN GROVE |
22/09/21 07:00 |
01/10/21 16:30 |
Excavate approx 58m of track in the footway and 1x carriageway crossing to install apparatus for CityFibre new build. |
|
MORRIS LANE |
20/09/21 07:00 |
22/09/21 16:30 |
Excavate 1 x cabinet for CityFibre new build. |
|
HESKETH ROAD |
13/09/21 07:00 |
21/09/21 16:30 |
Excavate approx 55m of track to install ducting for CityFibre newbuild. |
|
WELLINGTON STREET |
03/01/22 00:00 |
02/12/22 23:59 |
Highway realignment and junction improvements |
|
EASTLEIGH DRIVE |
25/10/21 07:00 |
08/11/21 23:59 |
|
|
CASTLE INGS GARDENS |
06/09/21 08:33 |
24/09/21 22:59 |
LRS 2022/23 - Fway |
|
CASTLE INGS GARDENS |
26/09/21 23:00 |
08/10/21 22:59 |
DFT 34 - C/way |
|
SPRINGBANK ROAD |
17/10/21 23:00 |
29/10/21 22:59 |
DfT Cwy resurfacing |
|
A650 |
14/12/21 00:00 |
15/12/21 23:59 |
THESE WORKS ARE FOR THE EXCAVATION OF A TRIAL HOLE TO ASSESS THE SUITABILITY OF NEW TELECOMS EQUIPMENT |
|
SPRINGBANK ROAD |
17/10/21 23:00 |
29/10/21 22:59 |
DfT Cwy resurfacing |
|
LONG ROW |
30/09/21 07:00 |
30/09/21 16:00 |
Excavate to locate service, check flow + pressure |
|
HARWILL ROAD |
22/09/21 00:00 |
24/09/21 00:00 |
Excavation in footway to lay approx. 1 metre of duct. |
|
SMITHY LANE |
25/10/21 07:00 |
08/11/21 23:59 |
|
|
BACK MEXBOROUGH AVENUE |
26/09/21 23:00 |
27/09/21 19:00 |
Renew stop tap + chamber |
|
ECHO STREET |
31/08/21 08:15 |
27/09/21 22:59 |
|
|
BARTON GROVE |
09/09/21 07:50 |
22/09/21 22:59 |
Cable Overlay (Low Voltage) ? Excavation of 2 trial holes in footway for investigation purposes. Reinstate excavations as interim. To be made permanent when cable overlay works are completed |
|
HESKETH MOUNT |
14/09/21 07:00 |
22/09/21 16:30 |
Excavate approx 55m of track in the footway to install CityFibre apparatus. |
|
TOWN STREET |
08/08/21 23:00 |
23/09/21 23:00 |
LRS Cwy surfacing |
|
ASQUITH AVENUE |
03/10/21 23:00 |
08/10/21 22:59 |
Install 65m of 1 way poly duct in Footway |
|
STAITHGATE LANE |
27/08/21 23:00 |
28/11/21 23:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
WAKEFIELD ROAD |
04/10/21 17:00 |
26/11/21 23:00 |
Carriageway resurfacing |
|
KING S ROAD |
07/10/21 23:00 |
08/10/21 22:59 |
|
|
ASQUITH AVENUE |
03/10/21 23:00 |
08/10/21 22:59 |
Install 10m of 1 way poly duct in Carriageway,Install 35m of 1
way poly duct in Footway |
|
RAVENSCLIFFE ROAD |
25/10/21 08:30 |
25/10/21 14:30 |
REPLACE MANHOLE FRAME + COVER |
|
SOUTH STREET |
28/09/21 07:00 |
29/09/21 17:00 |
Replace 1 existing pole (pole is in private but we will need to work from the road) |
|
WAINCLIFFE DRIVE |
06/10/21 07:00 |
06/10/21 16:00 |
Install water meter to supply pipe |
|
FAWCETT LANE |
26/09/21 23:00 |
01/10/21 22:59 |
Install new water supply connection |
|
LINCOLN ROAD |
30/09/21 23:00 |
01/10/21 22:59 |
|
|
GREENFIELD AVENUE |
27/09/21 06:30 |
15/10/21 22:59 |
Abandon 331.30m of 3SI and replace with 331.30m of 63mmPE by Dead Insert.
Relays x 14 Connections x 2 Transfers x 9 |
|
ARGYLL CLOSE |
20/09/21 23:00 |
23/09/21 22:59 |
|
|
NEW CROSS STREET |
04/10/21 07:00 |
04/10/21 18:00 |
|
|
BARLEYHILL ROAD |
20/09/21 07:00 |
04/10/21 22:59 |
|
|
BRUNTCLIFFE ROAD |
28/09/21 07:00 |
08/10/21 17:00 |
|
|
GREAT GEORGE STREET |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
SCOTT LANE |
28/09/21 07:00 |
08/10/21 17:00 |
|
|
BRUNTCLIFFE ROAD |
27/09/21 07:00 |
08/10/21 17:00 |
|
|
KINGSWAY |
27/09/21 23:00 |
28/09/21 22:59 |
Renew stop tap + chamber |
|
MORRIS LANE |
14/09/21 07:00 |
22/09/21 16:30 |
Excavate 115m of footway track and 6m carriageway for CityFibre new build. |
|
MERRION WAY |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
MORRIS LANE |
21/09/21 07:00 |
30/09/21 16:30 |
Excavate approx 5m of Carriageway and 90m Footway Track to install ducting for CityFibre new build. |
|
BRIGGATE |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
TOWN STREET |
22/09/21 23:00 |
06/10/21 22:59 |
Excavate 64m of Footway Track for CityFibre new build. |
|
WOODHOUSE LANE |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
WOODHOUSE LANE |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
SWINNOW ROAD |
07/05/21 19:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
TOWN STREET |
19/09/21 23:00 |
01/10/21 22:59 |
Excavate 50m of Footway Track and 1 x cabinet for CityFibre new build. |
|
LOVELL PARK ROAD |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
SWINNOW LANE |
07/05/21 19:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
VICAR LANE |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
LEA PARK GROVE |
05/10/21 13:00 |
05/10/21 15:00 |
|
|
HOUGH LANE |
07/05/21 19:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
CROWN POINT ROAD |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
SILVER LANE |
20/09/21 07:00 |
22/09/21 16:00 |
Clear blockages |
|
HAWTHORN AVENUE |
20/09/21 07:00 |
22/09/21 16:00 |
Clear blockages |
|
BURTON ROAD |
16/09/21 07:00 |
29/09/21 22:59 |
Connection notice only. |
|
BACK LONGROYD TERRACE |
16/09/21 07:00 |
29/09/21 22:59 |
Connection notice only. |
|
PARK MOUNT |
09/09/21 11:53 |
22/09/21 22:59 |
Excavate 109m carriageway track, 16m footway track and 1 x cabinet for CityFibre new build. |
|
STONEY CROFT |
14/10/21 07:00 |
14/10/21 16:00 |
|
|
SCOTT LANE |
07/12/21 19:00 |
18/12/21 07:30 |
CARRIAGEWAY RESURFACING WORKS 100mm DEPTH INCLUDING ADJUSTMENT/REPLACEMENT OF IRONWORK AND REINSTATEMENT OF ROADMARKINGS. |
|
BRADFORD ROAD |
04/10/21 07:00 |
22/10/21 22:59 |
Abandon 118.6m od 4CI, 17.28m of 2ST, 14m of 6CI and replace with 131m of 90mmPE, 14m of 125mmPE by Dead Insert.
Relays x 8 Connections x 2 Transfers x 5 |
|
WAKEFIELD ROAD |
06/09/21 07:00 |
22/10/21 22:59 |
|
|
MAIN STREET |
01/11/21 08:00 |
15/11/21 23:59 |
|
|
MELBOURNE ROAD |
01/11/21 00:00 |
05/11/21 23:59 |
renew fire hydrant |
|
CYPRUS ROAD |
25/10/21 07:00 |
08/11/21 23:59 |
Abandon 28.37m of 4DI and replace with 28.37m of 63mmPE by Dead Insert.
Relays x 1 Connections x 2 Transfers x 1 |
|
CYPRUS GROVE |
25/10/21 07:00 |
08/11/21 23:59 |
Abandon 97.70m of 4DI and replace with 97.70m of 63mmPE by Dead Insert.
Relays x 5 Connections x 2 Transfers x 4 |
|
FARFIELD COURT |
11/10/21 07:00 |
25/10/21 22:59 |
Abandon 112.54m of 4DI and replace with 112.54m of 63mmPE by Dead Insert.
Relays x 10 Connections x 2 Transfers x 7 |
|
CYPRUS TERRACE |
18/10/21 07:00 |
01/11/21 23:59 |
Abandon 43.07m of 1.5mST, 63.58m of 4DI and replace with 43.07m of 40mmPE, 63.58m of 63mmPE by Dead Insert + Open Cut.
Relays x 5 Connections x 2 Transfers x 3 |
|
BACON AVENUE |
04/10/21 07:00 |
05/10/21 05:00 |
Remove sluice valve from water main |
|
CHAPEL CLOSE |
01/11/21 08:00 |
15/11/21 23:59 |
Abandon 41.80m of 4DI and replace with 41.80m of 63mmPE by Dead Insert.
Relays x 2 Connections x 2 Transfers x 2 |
|
PANELAGH AVENUE |
19/09/21 23:00 |
22/09/21 22:59 |
|
|
THE RISE |
17/09/21 07:00 |
28/09/21 16:30 |
Excavate 50m of Footway Track and 8m carriageway for CityFibre new build. |
|
WESTFIELD GROVE |
20/09/21 06:00 |
22/09/21 17:00 |
3LD0 Lead Renewal (Short Side) |
|
NORTHFIELD PLACE |
11/10/21 23:00 |
15/10/21 22:59 |
Plane and resurface an area of failing carriageway |
|
HENCONNER LANE |
23/11/21 09:30 |
23/11/21 15:30 |
Lane closure in conjunction with works on road closure of westbound on slip to Stanningley bypass. Linked permit BC008WC1JL96W |
|
RIPLEY DRIVE |
15/09/21 14:00 |
21/09/21 22:59 |
Public Lighting Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations |
|
NABURN DRIVE |
07/09/21 07:00 |
24/09/21 22:59 |
Connection only in conjunction with works on Naburn Drive |
|
HIGH STREET |
08/02/22 01:00 |
08/02/22 23:59 |
Hours of work 0001 - 0545. Using on track machinery to consolidate ballast to improve track quality... |
|
CROFT BRIDGE |
17/09/21 07:00 |
21/09/21 16:00 |
|
|
BRIDGE STREET |
04/10/21 07:00 |
15/10/21 17:00 |
Cable Overlay (High Voltage) - Excavate to Install cable, joint new cable, transfer services and reinstate excavations, including 1 joint hole in footway and 45m of trench in carriageway. |
|
MARSH LANE |
20/09/21 18:00 |
25/09/21 04:00 |
Bridge joint concrete repairs using hydro-demolition. New York Rd Viaduct Eastbound; L0228. Road closure overnight 19:00 to 05:00 daily. Noisy work until 23:00.The works duration includes two days contingency. Blue Light Route maintained though the closure.Pedestrian diversion will be in place or pedestrians will be marshalled through the closure. |
|
MANOR FARM DRIVE |
01/10/21 07:00 |
01/10/21 16:00 |
Renew stop tap + chamber |
|
STONEGATE ROAD |
12/10/21 07:00 |
12/10/21 11:00 |
Install water meter to supply pipe |
|
WESTON DRIVE |
13/09/21 07:00 |
24/09/21 22:59 |
Installation of track in footway. 2 x road crossings. |
|
WATERGATE |
26/09/21 23:00 |
10/10/21 22:59 |
|
|
WESTON PARK VIEW |
16/09/21 07:00 |
29/09/21 22:59 |
Installation of track in footway. 2 x road crossings. |
|
NEWMARKET LANE |
11/12/21 00:00 |
21/12/21 23:59 |
|
|
WESTON LANE |
15/09/21 07:00 |
21/09/21 22:59 |
Installation of track in footway. |
|
WATERGATE |
22/10/21 23:00 |
10/11/21 23:59 |
|
|
NEWMARKET LANE |
04/01/22 00:00 |
18/01/22 23:59 |
|
|
WOODHALL ROAD |
26/09/21 23:00 |
08/10/21 22:59 |
|
|
GWYNNE AVENUE |
19/09/21 23:00 |
01/10/21 22:59 |
|
|
HOLLIN GATE |
08/09/21 07:00 |
21/09/21 22:59 |
Installation of track in footway. 2 x road crossings. |
|
FARRAR LANE |
16/09/21 11:55 |
22/09/21 22:59 |
Repair sluice valve |
|
CAWLEY LANE |
09/08/21 07:15 |
30/10/21 15:00 |
Kerbing and footway surfacing works. |
|
WILLOW TERRACE ROAD |
20/09/21 18:00 |
24/09/21 16:00 |
Excavation 4 way temporary signals in place on for night 1 and 2 for Cab swap and Mewp works , Civils works during the day for remainder of the week, under pedestrian management . Barrier to remain in place overnight. |
|
SHAY STREET |
21/09/21 07:00 |
27/09/21 16:00 |
LAY NEW SERVICE - 7M IN FW |
|
BLACKMAN LANE |
16/09/21 07:30 |
22/09/21 15:30 |
CUTBACK + ALTER 90MM SERVICE - PURGE + RELIGHT REQ (CUST) |
|
|
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
MERRION STREET |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
MERRION WAY |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
NORTH STREET |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
NEW YORK ROAD |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
WOODHOUSE STREET |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
TUNSTALL ROAD |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
ELLAND ROAD |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
MARSH LANE |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
MERRION STREET |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
BAR STREET |
16/09/21 23:00 |
23/09/21 22:59 |
|
|
OXFORD ROAD |
26/09/21 23:00 |
07/10/21 22:59 |
|
|
BRADFORD ROAD |
19/09/21 23:00 |
01/10/21 22:59 |
|
|
LONGROYD GROVE |
16/09/21 12:00 |
22/09/21 22:59 |
Service cable fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavation |
|
HALLFIELD LANE |
08/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
KING LANE |
08/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
BRUNSWICK TERRACE |
05/11/21 00:00 |
05/11/21 23:59 |
EVENT - LEEDS ARENA - Elton John - Strategic route for the Arena and heavier than normal traffic ex... |
|
|
08/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
IVESON APPROACH |
08/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
BRAYTON GREEN |
22/09/21 23:00 |
27/09/21 22:59 |
Replace existing pole in situ |
|
MARLBOROUGH GARDENS |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
WILD GROVE |
21/09/21 23:00 |
22/09/21 22:59 |
Renew stop tap + chamber |
|
TEMPLE WALK |
26/09/21 23:00 |
01/10/21 22:59 |
|
|
STICKER LANE |
13/09/21 06:30 |
24/09/21 16:30 |
Lay approx 250 meters of ducting in footpath |
|
MEANWOOD ROAD |
07/10/21 23:00 |
12/10/21 22:59 |
Excavate in verge to extend existing Virgin Media network and lay duct in order to provide new customer connection (PIA) |
|
ALCESTER ROAD |
20/09/21 07:30 |
01/10/21 15:30 |
|
|
EASY ROAD |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate in footway and locate/clear blockage(s) in order to provide new customer connection |
|
LEICESTER PLACE |
13/10/21 23:00 |
18/10/21 22:59 |
ESSENTIAL TELECOMS INTEGRATION WORKS TO BE UNDERTAKEN IN THE EXISTING TELECOMS CABINETS |
|
CRACKENEDGE LANE |
09/09/21 07:00 |
22/09/21 22:59 |
|
|
WINDHILL OLD ROAD |
23/09/21 07:00 |
23/09/21 18:00 |
|
|
SHARP STREET |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
CROFT HOUSE DRIVE |
22/09/21 23:00 |
06/10/21 22:59 |
Installation of track in footway. 2 xx road crossings. |
|
NEWALL CARR ROAD |
29/09/21 23:00 |
13/10/21 22:59 |
Installation of track in footway. 2 x road crossings. |
|
BATTYE STREET |
19/09/21 23:00 |
28/09/21 22:59 |
|
|
WRENBECK DRIVE |
30/09/21 23:00 |
14/10/21 22:59 |
Installation of track in footway. 1 x road crossing. |
|
THE CRESCENT |
15/09/21 23:00 |
29/09/21 22:59 |
Installation of track in footway. 2 x road crossings. |
|
WEETWORTH PARK |
04/01/22 00:00 |
28/01/22 23:59 |
Abandon 324m of 100mmDI and 45m of 2ST, replace with 139m of 63mmPE, 185m of 90mmOE and 45m of 40mmPE by Dead Insert, connections x relays x transfers x |
|
CINDER LANE |
03/09/21 07:00 |
08/10/21 15:00 |
Installing new sign pole near to street lighting column 1.
Chapter 8 being used and banksman to escort pedestrians passed works |
|
LEEDS ROAD |
08/11/21 00:00 |
24/12/21 23:59 |
Abandon 373.5m of 6SI, 155.5m of 150mmDI and 4m of 6DI, replace with 533.5m of 125mmPE by Dead Insert, connections x9 relays x12 transfers x8 |
|
LISHEEN AVENUE |
13/12/21 00:00 |
24/12/21 23:59 |
Abandon83m of 4DI and replace with 83m of 90mmPE by Dead Insert, connections x 2 relays x transfers x |
|
CARR LANE |
10/10/21 23:00 |
12/11/21 23:59 |
Abandon 62.5m od 100mmDI and 409m of 4SI, replace with 472m of 90mmPE by Open Cut, connections x6 relays x18 transfers x12 |
|
FRONT STREET |
08/11/21 00:00 |
26/11/21 23:59 |
Abandon 123m of 6DI, 9m of 2ST and 27m of 1.5ST, replace with 123m of 125mmPE, 27m of 40mmPE and 9m of 63mmPE by Dead INsert and Open Cut, connections x10 relays x6 transfers x4 |
|
FRONT STREET |
20/09/21 23:00 |
22/09/21 22:59 |
Trial Hole and Camera work to determine depth of main |
|
SOMERVILLE GREEN |
05/04/21 23:00 |
01/03/22 00:00 |
New signalised junction, segregated and shared cycleway / footways, controlled crossings and central reservation works. |
|
|
03/10/21 23:00 |
15/10/21 22:59 |
Abandon 64.5m of 4DI and 46.5m of 2ST, replace with 64.5m of 90mmPE and 46.5m of 40mmPE by Dead Insert, connections x4 relays x9 transfers x6 |
|
SERPENTINE ROAD |
07/12/21 19:00 |
18/12/21 07:30 |
Point closure for work on Northgate |
|
HUNSLET ROAD |
12/09/21 23:00 |
17/06/22 22:59 |
Junction improvement and public realm works |
|
WOODHOUSE LANE |
08/10/21 23:00 |
09/10/21 22:59 |
Event - University of Leeds Open Day - 09:00 start... |
|
WOODHOUSE LANE |
01/10/21 23:00 |
02/10/21 22:59 |
Event - University of Leeds Open Day - 09:00 start... |
|
THE GILLS |
14/09/21 07:00 |
18/10/21 22:59 |
Installation of track in footway. 2 x road crossing. |
|
WITHENS ROAD |
07/12/21 00:00 |
17/12/21 23:59 |
CARRIAGEWAY RESURFACING WORKS 100mm DEPTH INCLUDING ADJUSTMENT/REPLACEMENT OF IRONWORK AND REINSTATEMENT OF ROADMARKINGS. |
|
BAYSWATER ROAD |
12/10/21 07:00 |
25/10/21 16:00 |
Carry out relining of existing 4 water main approx 281m including replacement of all existing fittings. |
|
WEST END GROVE |
29/09/21 23:00 |
30/09/21 22:59 |
Renew stop tap + chamber |
|
VICTORIA ROAD |
16/09/21 07:00 |
24/09/21 22:59 |
180m F/Way + 5m C/Way + 2 x FW4 + 2 x Core Drills. |
|
TONG STREET |
03/10/21 07:00 |
03/10/21 22:59 |
Slot cut loops ollowing highways resurfacing works by Highways |
|
BARWICK ROAD |
01/11/21 07:30 |
22/11/21 23:59 |
NRSWA_Barwick Road, Leeds
Abandon 30.10m of 6 SI, replace with 30.10m of 180mm PE by Open Cut
Connections x 2 Relays x 1 Transfers x 1 |
|
SELBY ROAD |
18/10/21 07:00 |
29/10/21 16:00 |
Reline existing 6 water main approx 89m from lining pit 1 on Rookwood Avenue to lining pit 2 outside 14 |
|
CALVERLEY LANE |
09/09/21 09:00 |
27/09/21 22:59 |
Connection only in conjunction with works on New Road Side.
Connection x 1, Relays x 0, Transfers x 0. |
|
WOODHOUSE STREET |
29/09/21 23:00 |
30/09/21 22:59 |
**Essential Works under Covid-19 Guidance and Government guidelines of social distancing to the public and team members** Investigative works to find high level fault in telecoms Road narrowing 08.00-18.00, reduced to the footway at all other times. |
|
CHILD LANE |
23/10/21 07:00 |
27/10/21 16:00 |
|
|
LEEDS ROAD |
14/02/22 00:00 |
15/02/22 23:59 |
Level crossing testing. Hours of works 22.00 - 06.00... |
|
KNOWLES LANE |
14/09/21 23:00 |
28/09/21 22:59 |
|
|
EDGWARE PLACE |
12/10/21 07:00 |
25/10/21 16:00 |
Installation of SV, in conjunction with relining of existing 4 water main on Bayswater Road |
|
LOWER MICKLETOWN |
18/10/21 18:00 |
18/10/21 20:30 |
REPLACE MANHOLE FRAME + COVER |
|
BRUNSWICK STREET |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
EMBLETON ROAD |
10/10/21 23:00 |
25/10/21 22:59 |
|
|
HUNGATE LANE |
20/09/21 07:00 |
22/09/21 16:00 |
renew fire hydrant |
|
PINDERS GREEN DRIVE |
10/10/21 23:00 |
25/10/21 22:59 |
|
|
PINDERS GREEN DRIVE |
22/10/21 23:00 |
10/11/21 23:59 |
|
|
HUNGATE LANE |
04/01/22 00:00 |
18/01/22 23:59 |
|
|
NEW ROAD |
26/10/21 06:30 |
05/11/21 17:00 |
Line 290m of 4 cast iron water main in New Rd, Chapel Street and Westfield Road. |
|
PARK LANE |
14/10/21 18:00 |
14/10/21 22:30 |
REPLACE MANHOLE FRAME + COVERS |
|
MOOR PARK VILLAS |
07/10/21 06:30 |
21/10/21 22:59 |
|
|
ST JOHNS PLACE |
20/09/21 08:00 |
27/09/21 16:00 |
|
|
WOODHOUSE LANE |
03/12/21 00:00 |
03/12/21 23:59 |
EVENT - LEEDS ARENA - The Human League - Strategic route for the Arena and heavier than normal traff... |
|
OULTON LANE |
04/10/21 07:00 |
15/10/21 22:59 |
Notice to replace road crossing outside 26 Oulton Lane |
|
MOOR DRIVE |
14/10/21 06:30 |
28/10/21 22:59 |
|
|
THE VIEW |
29/09/21 07:30 |
29/09/21 15:30 |
Substation Replacement - Traffic Management Only - Two way lights to enable vehicles to park in work zone for remove of items from old substation/delivery of items for new substation |
|
BROWN LANE EAST |
25/10/21 07:00 |
27/10/21 16:00 |
renew fire hydrant |
|
MAYLEA DRIVE |
17/09/21 07:00 |
21/09/21 16:00 |
Excavate to locate service, check flow + pressure |
|
HOWARD STREET |
15/09/21 10:10 |
21/09/21 22:59 |
|
|
LISTER HILL |
18/10/21 07:00 |
29/10/21 17:00 |
|
|
BACHELOR LANE |
20/09/21 07:00 |
08/10/21 17:00 |
|
|
GREAT GEORGE STREET |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
WOODHOUSE LANE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
RICHARDSHAW ROAD |
20/09/21 07:00 |
24/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in footway 5m trench in footway |
|
DEWSBURY ROAD |
26/09/21 23:00 |
29/09/21 22:59 |
|
|
NORTH STREET |
21/09/21 20:00 |
22/09/21 05:00 |
Safe access to underground network for cabling works. |
|
MARKET STREET |
02/11/21 19:00 |
02/11/21 23:00 |
|
|
BURRAS LANE |
22/09/21 23:00 |
23/09/21 22:59 |
Excavate to locate service, check flow + pressure |
|
BEXLEY TERRACE |
06/12/21 08:00 |
21/01/22 23:59 |
|
|
TUNSTALL ROAD |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
GATHORNE STREET |
24/10/21 23:00 |
12/11/21 23:59 |
Cable Overlay - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 22 joint holes in footway and 150m of trench in footway |
|
CORFE CLOSE |
04/10/21 08:00 |
14/10/21 16:00 |
|
|
MERRION STREET |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
MERRION WAY |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
GROVELANDS |
20/09/21 23:00 |
23/09/21 22:59 |
|
|
CLAREMONT ROAD |
29/09/21 07:00 |
29/09/21 16:00 |
|
|
WINDMILL LANE |
04/10/21 08:00 |
14/10/21 16:00 |
|
|
ELLAND ROAD |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
MARSH LANE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
RIDINGS WAY |
23/09/21 23:00 |
30/09/21 22:59 |
Placement of Temporary Traffic Signal Heads in conjunction with works on Potovens Lane reference QA761U19008295 |
|
EDWARD STREET |
11/10/21 23:00 |
18/10/21 22:59 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint hole in footway and 7m road crossing |
|
KNOWSTHORPE CRESCENT |
01/11/21 08:00 |
15/11/21 23:59 |
Abandon 179.80m of 12ST and replace with 179.80m of 250mmPE by Dead Insert.
Relays x 0 Connections x 2 Transfers x 0 |
|
CROSS GREEN LANE |
29/11/21 08:00 |
13/12/21 23:59 |
Abandon 2.40m of 6CI |
|
CROWN POINT ROAD |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
CROSS GREEN LANE |
08/11/21 08:00 |
24/12/21 23:59 |
Abandon 448.50m of 12ST and replace with 426.10m of 250mmPE by Open Cut + Dead Insert.
Relays x 0 Connections x 2 Transfers x 0 |
|
MERRION WAY |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
BRIGGATE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
WOODHOUSE LANE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
STAINCLIFFE ROAD |
15/11/21 08:00 |
19/11/21 18:00 |
TEMP LIGHTS FOR WORK ON GREEN LANE |
|
LOVELL PARK ROAD |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
VICAR LANE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
INNER RING ROAD |
14/10/21 19:00 |
22/10/21 04:30 |
Regent Street Reconstruction Scheme. Demolition of North Spans. Road closure from 20:00 Friday to 05:30 overnight with diversion. See seperate LAs for associated closures on NYR, York Road, Regent Street , Eastgate and Bell Street. |
|
RING ROAD BEESTON |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
ALLENBY ROAD |
21/09/21 23:00 |
22/09/21 22:59 |
Link Box Lid Replacement - Attendance required repair/replace damaged link box lid |
|
GOMERSAL LANE |
16/11/21 00:00 |
24/11/21 23:59 |
|
|
KNOWLES LANE |
05/10/21 23:00 |
09/10/21 22:59 |
|
|
UNION ROAD |
17/01/22 00:00 |
25/01/22 23:59 |
|
|
STAINCLIFFE ROAD |
22/09/21 23:00 |
29/09/21 22:59 |
|
|
DAISY HILL |
25/09/21 23:00 |
26/09/21 22:59 |
|
|
PONTEFRACT LANE |
29/09/21 19:00 |
30/09/21 05:00 |
|
|
QUEEN STREET |
05/09/21 07:00 |
10/10/21 22:59 |
To install 84M in carriageway and 3M in footway. |
|
WETHERBY ROAD |
05/10/21 18:00 |
08/10/21 05:00 |
Surfacing of carriageway |
|
HUNSLET LANE |
11/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
GLEDHOW PARK DRIVE |
01/10/21 07:00 |
14/10/21 16:30 |
Excavate 140m of 2-way feeder in footway and build 3 x chambers for CityFibre. |
|
SCOTCHMAN LANE |
07/10/21 07:00 |
07/10/21 16:00 |
Install water meter to supply pipe |
|
NEW LANE |
23/08/21 07:00 |
13/09/21 22:59 |
Abandon 160m of 18CI and replace with 160m of 90mmPE by Open Cut.
Relays x 2 Connections x 2 Tran... |
|
PONTEFRACT LANE |
28/09/21 19:00 |
29/09/21 05:00 |
|
|
HARROGATE ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
Install 53m of 1 way poly duct in Footway |
|
KNOWLES ROAD |
06/12/21 00:00 |
10/12/21 23:59 |
Point Closure for work on Oxford Street |
|
POOLE ROAD |
04/10/21 07:00 |
18/10/21 22:59 |
|
|
MIDDLETON GROVE |
20/09/21 06:00 |
27/09/21 16:00 |
Install water mains to site. |
|
ROMAN PLACE |
27/10/21 07:00 |
27/10/21 16:00 |
|
|
BALDOVAN MOUNT |
07/10/21 07:00 |
07/10/21 16:00 |
Install stop tap + chamber |
|
HENLEY ROAD |
15/09/21 23:00 |
28/09/21 22:59 |
|
|
|
04/10/21 07:00 |
08/10/21 16:00 |
LAY NEW SERVICE - 4M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - ROAD CLOSURE - PEDS TO USE ALTERNATIVE FOOTWAY |
|
ARTHUR STREET |
27/09/21 07:00 |
08/10/21 15:00 |
Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 10m road crossing |
|
LEE BRIG |
12/09/21 16:30 |
24/09/21 22:59 |
Low Voltage Mains Cable Fault ? Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. |
|
BEXLEY MOUNT |
10/01/22 08:00 |
21/01/22 23:59 |
|
|
|
18/04/21 23:00 |
01/03/22 23:59 |
New signalised junction, segregated and shared cycleway / footways, controlled crossings and central reservation works. |
|
WALTON ROAD |
22/09/21 08:30 |
24/09/21 14:30 |
Excavations required to repair OPENREACH UG duct to
allow fibre infrastructure installation. This permit is in
conjunction with BC3100000000500314206600 applied to
start on the 20/09 |
|
WETHERBY ROAD |
20/09/21 07:00 |
22/09/21 15:00 |
2 , 8 ,Build 1 concrete chamber 1310mm x 610mm x 1265mm
deep in Footway. Repair Openreach UG duct. |
|
BULLER GROVE |
17/09/21 07:00 |
22/09/21 16:30 |
Excavate to dig approx. 60m in footway and build chamber and cabinet, connecting into existing network for cityfibre build |
|
KING LANE |
15/10/21 07:00 |
29/10/21 22:59 |
|
|
BRUNSWICK TERRACE |
14/10/21 23:00 |
15/10/21 22:59 |
EVENT - LEEDS ARENA - Jason Donovan - 18:30 start... |
|
DAISY HILL |
27/09/21 07:00 |
01/10/21 15:00 |
|
|
HALES ROAD |
22/09/21 23:00 |
24/09/21 22:59 |
Remedial reinstatement required to correct defect. |
|
BRADFORD ROAD |
27/09/21 07:00 |
01/10/21 16:30 |
Excavate approx. 10m of footway and verge to connect into existing network for CityFibre build. |
|
YORK ROAD |
20/09/21 07:00 |
01/10/21 16:30 |
Excavate approx 300m in the footway with carriageway crossing at junction Hepton Court to build chambers for CityFibre build. |
|
MARSHALL STREET |
07/06/20 23:00 |
06/12/21 23:59 |
One Way Closure (Southbound) outside Temple Works to provide hoarding around delapidated building to... |
|
ROOLEY LANE |
07/12/21 00:00 |
07/12/21 23:59 |
|
|
BAYSWATER ROW |
13/09/21 09:00 |
21/09/21 16:00 |
EXCAVATE AND REPAIR SEWER |
|
EMBLETON ROAD |
26/09/21 23:00 |
10/10/21 22:59 |
|
|
YORK ROAD |
12/09/21 23:00 |
22/10/21 22:59 |
Introduction of signal toucan crossing, associated footway and carriageway based works |
|
CLARENDON WAY |
10/10/21 23:00 |
22/10/21 22:59 |
35m FW, 40m CW, CW1 box, 3 x Toby Box, Core Drill. |
|
THACKLEY ROAD |
13/10/21 23:00 |
18/10/21 22:59 |
|
|
THACKLEY ROAD |
13/10/21 23:00 |
18/10/21 22:59 |
|
|
BREARLEY STREET |
06/12/21 00:00 |
10/12/21 23:59 |
Point Closure for work on Oxford Street |
|
REIN ROAD |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
PILGRIM DRIVE |
22/11/21 08:00 |
29/11/21 18:00 |
CARRIAGEWAY RESURFACING WORKS 100mm DEPTH INCLUDING TRAFFIC CALMING ROAD PLATEAUX, ADJUSTMENT/REPLACEMENT OF IRONWORK AND REINSTATEMENT OF ROADMARKINGS. |
|
ST MARY S STREET |
13/05/20 23:00 |
11/11/21 23:59 |
Road closure required for Leeds City Council (Bridges) to facilitate access to contractors compound... |
|
INNER RING ROAD |
12/06/20 23:00 |
05/10/21 22:59 |
Speed limit reduction from 40mph to 30mph on the A64/A64(M) contraflow on both the East and West bou... |
|
NORTHOLME AVENUE |
11/10/21 07:30 |
27/10/21 14:30 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 160m trench in footway and 8m road crossing |
|
WOODHOUSE LANE |
24/09/21 23:00 |
25/09/21 22:59 |
EVENT - LEEDS ARENA - Whats love got to do with it? A Tribute to Tina Turner - Strategic route for... |
|
MILL LANE |
23/10/21 07:00 |
31/10/21 17:00 |
|
|
KINGSMARK FREEWAY |
20/09/21 07:00 |
08/10/21 16:00 |
|
|
DICK LANE |
24/09/21 07:00 |
24/09/21 18:00 |
|
|
GROVE LANE |
11/10/21 06:30 |
30/10/21 16:00 |
Dig down repair to a collapsed sewer at approximately 7 metres deep. Dig down repair and then line the section of sewer. |
|
WHACK HOUSE LANE |
27/10/21 08:30 |
27/10/21 14:30 |
renew cover + frame |
|
ALEXANDRA ROAD |
29/09/21 07:00 |
29/09/21 16:00 |
|
|
HAZELWOOD AVENUE |
01/11/21 08:00 |
12/11/21 17:00 |
Installation of new water main, swab, test and chlorinate new 200dia water main. Connect to existing on completion. |
|
HAREHILLS LANE |
01/10/21 07:00 |
07/10/21 16:30 |
Excavate approx x2 , 2m x 2m in the footway to rectify blockage- CityFibre works. |
|
HIGHFIELD |
27/09/21 07:00 |
30/09/21 16:30 |
Excavate 40m in the footway to connect into existing network for CityFibre build. |
|
CROWTHER STREET |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
GARTON DRIVE |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
OLD PARK ROAD |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
WEBB DRIVE |
26/05/21 23:00 |
31/03/22 22:59 |
Carriageway Resurfacing |
|
WESTFIELD OVAL |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
FIELDGATE ROAD |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
KENTMERE AVENUE |
06/10/21 23:00 |
11/10/21 22:59 |
Build 2 precast chamber 725mm x 255mm x 665mm deep in Footway,Install
8m of 1 way poly duct in Footway |
|
HARROGATE ROAD |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
LONG LANE |
21/09/21 08:30 |
21/09/21 14:30 |
replace manhole frame + cover |
|
YORK ROAD |
04/10/21 07:00 |
15/10/21 16:30 |
Excavate approx. 210m in the footway with 1 x crossing at junction St Alban Road to build chambers for CityFibre. |
|
PALMER ROAD |
26/05/21 23:00 |
31/03/22 22:59 |
Carriageway Resurfacing |
|
HENDFORD DRIVE |
26/05/21 23:00 |
31/03/22 22:59 |
Carriageway Resurfacing |
|
ELVEY STREET |
21/09/21 07:00 |
27/09/21 15:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint hole in footway and 1m trench in footway |
|
SANDERLING WAY |
08/08/21 23:00 |
23/09/21 23:00 |
LRS Cwy surfacing |
|
IDLE ROAD |
26/05/21 23:00 |
31/03/22 22:59 |
Carriageway Resurfacing |
|
UPPER CASTLE STREET |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
MARK STREET |
26/05/21 23:00 |
30/03/22 23:00 |
Carriageway Resurfacing |
|
PYENOT AVENUE |
16/09/21 14:00 |
29/09/21 16:00 |
excavate to transfer service from old column to new column |
|
APPERLEY GARDENS |
26/05/21 23:00 |
31/03/22 22:59 |
Carriageway Resurfacing |
|
STATION LANE |
20/09/21 07:00 |
21/09/21 17:00 |
Replace 1 existing pole 0.5m x 0.5m |
|
HAREHILLS LANE |
01/10/21 07:00 |
06/10/21 16:30 |
Excavate to locate and clear footway 2 2m x 2m blockages. |
|
BEECHWOOD |
11/10/21 07:00 |
11/10/21 16:00 |
Install stop tap + chamber |
|
BOLTON ROAD |
31/05/21 23:00 |
21/03/22 23:59 |
Carriageway Resurfacing |
|
YORK ROAD |
17/01/22 20:00 |
19/01/22 05:30 |
Regent Street Reconstruction Scheme. Contraflow removal. Overnight Road Closure from 20:00 to 05:30 with diversion. See separate LAs for associated closures on IRR + York Road. |
|
INNER RING ROAD |
17/01/22 20:00 |
18/01/22 05:30 |
Regent Street Reconstruction Scheme. Contraflow removal. Overnight Road Closure from 20:00 to 05:30 with diversion. See separate LAs for associated closures on NYR + York Road. |
|
YORK ROAD |
17/01/22 20:00 |
19/01/22 05:30 |
Regent Street Reconstruction Scheme. Contraflow removal. Overnight Road Closure from 20:00 to 05:30 with diversion. See separate LAs for associated closures on IRR + NYR |
|
STIRLING CRESCENT |
20/09/21 07:00 |
08/10/21 22:59 |
|
|
SOUTH HILL WAY |
11/10/21 11:00 |
11/10/21 15:00 |
Install water meter to supply pipe |
|
RING ROAD FARNLEY |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
LAWNS LANE |
20/09/21 07:00 |
01/10/21 16:30 |
Excavate approx 300m of track in the footway and carriageway to install CityFibre apparatus. |
|
LOTHERTON LANE |
10/11/21 07:30 |
04/03/22 23:59 |
NSWRA_Lotherton Lane. Lay 647m of 400mm PE by OC.
Transfer x 0 Relay x 1 Connections x 1 |
|
WELLINGTON STREET |
18/10/21 07:00 |
19/11/21 23:55 |
|
|
SOMERSET ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
Excavate in footway and locate/clear blockage(s) in order to provide new customer connection |
|
GELDERD ROAD |
20/09/21 19:00 |
24/09/21 04:00 |
Install ducting chambers and ILD Boxes |
|
SHADWELL PARK DRIVE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
WELLGATE |
12/10/21 07:00 |
12/10/21 11:00 |
Install water meter to supply pipe |
|
COBDEN CLOSE |
18/10/21 07:00 |
19/11/21 23:55 |
|
|
JOFFRE AVENUE |
27/09/21 07:00 |
29/09/21 16:00 |
Install water meter to supply pipe |
|
MOORSIDE ROAD |
26/10/21 07:00 |
08/11/21 17:30 |
Excavate approx 250m of footway and carriageway to build chambers and cabinets for CityFibre. |
|
WESTMINSTER PLACE |
23/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street light |
|
BACK SANDHURST PLACE |
20/09/21 23:00 |
21/09/21 22:59 |
Install stop tap + chamber |
|
TOWN STREET |
08/08/21 23:00 |
23/09/21 23:00 |
LRS Cwy surfacing |
|
DENISON STREET |
29/09/21 07:00 |
29/09/21 18:00 |
|
|
WETHERBY ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
Excavation for pole root/cabinets and associated ducting in footway for new 5G telecoms build. |
|
|
18/10/21 22:00 |
23/10/21 05:00 |
Hours of work 2300 - 0600 shifts. Inspection for Assessment of the structure at the underside of bridge using Mobile Elevating Work Platform or Tower Scaffold on the carriageway and footway. |
|
OAKWOOD LANE |
29/10/21 07:00 |
29/10/21 11:00 |
Install water meter to supply pipe |
|
ROYDSDALE WAY |
27/09/21 23:00 |
04/10/21 22:59 |
|
|
LANSHAW TERRACE |
08/08/21 23:00 |
23/09/21 23:00 |
LRS Cwy surfacing |
|
SANDERLING WAY |
08/08/21 23:00 |
23/09/21 23:00 |
LRS Cwy surfacing |
|
COLLEGE GROVE ROAD |
10/11/21 08:00 |
16/11/21 17:00 |
LAY NEW SERVICE - 3M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - GIVE + TAKE - PEDS TO USE WALKWAY PROVIDED |
|
ARMLEY PARK ROAD |
11/01/21 07:30 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
AVIARY ROAD |
01/03/21 07:00 |
23/06/22 23:00 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
CRAB LANE |
06/03/21 19:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision.Traffic Management ahd Road Closure dates to be confirmed. |
|
BOAR LANE |
04/10/20 23:00 |
04/04/22 22:59 |
Temporary prohibition of traffic required in order to construct the new widened footpaths and change... |
|
BRANCH ROAD |
06/03/21 18:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision.Traffic Management Conditions and Road CLosure dates to be confirmed |
|
CANAL ROAD |
11/01/21 07:30 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
LEDGARD WAY |
06/03/21 18:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
PARK RISE |
23/09/21 07:30 |
27/09/21 17:30 |
CUTBACK + ALTER - 1M RELAY - FULL RECONN (NGN) |
|
WESTFIELD GROVE |
27/09/21 07:00 |
29/09/21 16:00 |
Drop kerbs being installed at 21 + 23 by the same contractor |
|
HASLEY ROAD |
29/09/21 23:00 |
12/10/21 22:59 |
|
|
ROSE BANK |
19/09/21 23:00 |
01/10/21 22:59 |
|
|
PROSPECT ROAD |
07/10/21 23:00 |
21/10/21 22:59 |
|
|
OAK AVENUE |
28/09/21 23:00 |
07/10/21 22:59 |
|
|
MARSH LANE |
14/09/21 23:00 |
08/10/21 22:59 |
|
|
FROGMOOR AVENUE |
28/09/21 23:00 |
01/10/21 22:59 |
|
|
LEEDS ROAD |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
LEEDS ROAD |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
SHAKESPEARE STREET |
29/09/21 07:00 |
04/10/21 16:30 |
Excavate approx. 10m of track in the footway to install CityFibre apparatus. |
|
SHAKESPEARE AVENUE |
29/09/21 07:00 |
04/10/21 16:30 |
Excavate approx 10m of track in the footway + build cabinet + chamber to connect into existing network - CityFibre works. |
|
TONG STREET |
13/10/21 20:30 |
13/10/21 22:30 |
|
|
FIELD HEAD LANE |
07/12/21 00:00 |
17/12/21 23:59 |
TEMPORARY 2-WAY LIGHTS WILL BE REQUIRED ON FIELD HEAD LANE AT THE JUNCTION WITH LOWOOD LANE. |
|
GRAFTON STREET |
17/09/21 07:00 |
23/09/21 16:30 |
Excavate approx 50m of track in the footway, connecting into existing network and building chambers and cabinets where required for CityFibre build. |
|
WYKEBECK MOUNT |
15/09/21 08:55 |
21/09/21 22:59 |
EXCAVATE FOR TWO GAS SERVICES |
|
INGLEWOOD DRIVE |
04/10/21 07:00 |
08/10/21 17:00 |
|
|
WOODHOUSE STREET |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
|
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
NORTH STREET |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
CEDAR CLOSE |
16/09/21 07:00 |
27/10/21 22:59 |
Abandon 411.48m of 100mm DI. 70.20m of 2! ST. Replace with 135m of 90mm PE, 276.10m of 63mm pe and 70.20m of 40mm PE by dead insertion.
Connections x 7, Relays x 21, Transfers x 10. |
|
NEW YORK ROAD |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
OXFORD ROAD |
16/09/21 07:30 |
21/09/21 16:00 |
|
|
CHAPEL LANE |
03/12/21 08:00 |
24/12/21 23:59 |
|
|
MERRION STREET |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
QUEEN STREET |
26/10/21 06:30 |
05/11/21 17:00 |
Line 290m of 4 cast iron water main. |
|
WESTGATE |
14/10/21 23:00 |
19/10/21 22:59 |
1 ,Install 4m of 1 way poly duct in Footway,Install 9m of 1 way poly duct in
Carriageway |
|
DEVON CLOSE |
15/09/21 11:35 |
21/09/21 22:59 |
Renew leaking water supply pipe |
|
CHURCH ROAD |
26/10/21 07:00 |
09/11/21 23:59 |
|
|
BRUNSWICK TERRACE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
CARRINGTON STREET |
23/09/21 23:00 |
24/09/21 22:59 |
|
|
ST BARTHOLOMEW S CLOSE |
26/10/21 07:00 |
15/11/21 23:59 |
Abandon 100.40m of 100mm DI and 37m of 2 ST. Replace with 100.40m of 63mm Pe and 37m of 40mm PE by live and dead insertion.
Connections x 2, Relays x 9, Transfers x 6. |
|
LAUREL TERRACE |
29/11/21 08:00 |
13/12/21 23:59 |
Abandon 42.1m of 4 SI. Replace with 42.10m of 63mm Pe by live insertion.
Connections x |
|
OTLEY ROAD |
28/09/21 23:00 |
29/09/21 22:59 |
Install stop tap + chamber |
|
A639 |
01/10/21 19:00 |
02/10/21 05:00 |
|
|
ROOKS AVENUE |
15/09/21 12:45 |
21/09/21 22:59 |
|
|
TALBOT AVENUE |
27/10/21 07:00 |
27/10/21 11:00 |
Install water meter to supply pipe |
|
HALL ROAD |
04/10/21 07:00 |
12/10/21 16:00 |
LAY NEW MAINS + SERVICES TO FEED NEW BULD FLATS - 13M IN F/W + CW |
|
QUEENSWOOD GARDENS |
17/09/21 23:00 |
22/09/21 22:59 |
,Install 46m of 1 way poly duct in Verge,Install 5m of 1 way
poly duct in Footway |
|
LIDGETT LANE |
27/09/21 07:00 |
11/10/21 22:59 |
Abandon 161m of 8SI and replace with 161m of 125mmPE by Dead Insert.
Relays x 6 Connections x 2 Transfers x 4 |
|
COTTINGLEY DRIVE |
23/09/21 08:30 |
24/09/21 14:30 |
Remove old bus shelter and install new shelter AN10325 |
|
PARKWAY |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
GREENTON AVENUE |
27/09/21 07:00 |
27/09/21 16:00 |
|
|
BEECHWOOD TERRACE |
28/09/21 07:00 |
30/09/21 16:00 |
Renew stop tap + chamber |
|
IVY STREET |
16/09/21 08:40 |
22/09/21 22:59 |
Public Lighting Cable Fault ? Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations. |
|
WESLEY ROAD |
09/11/21 08:00 |
13/12/21 23:59 |
|
|
ELMFIELD WAY |
04/10/21 07:00 |
22/10/21 22:59 |
Abandon 99m of 150mmDI and replace with 99m of 125mmPE by Dead Insert.
Relays x 1 Connections x 2 Transfers x 1 |
|
THORNTON ROAD |
31/08/21 13:45 |
23/09/21 18:00 |
|
|
ALLERTON GRANGE WAY |
27/09/21 07:00 |
11/10/21 22:59 |
|
|
BRIDGE STREET |
22/09/21 07:00 |
28/09/21 16:30 |
Excavate approx 20m in the footway to install CityFibre apparatus. |
|
LEEDS ROAD |
27/09/21 23:00 |
30/09/21 22:59 |
Disconnect and Remove Kiosk |
|
MOORSIDE CLOSE |
27/09/21 07:00 |
01/10/21 16:30 |
Excavate approx 150m of footway and carriageway with 1 x cw crossing to build chambers and cabinets for CityFibre. |
|
SOUTHWAY |
25/07/22 07:00 |
05/08/22 22:59 |
|
|
BACK CARBERRY PLACE |
22/09/21 07:00 |
22/09/21 16:00 |
Renew stop tap + chamber |
|
WOOD VIEW CLOSE |
22/10/21 07:00 |
28/10/21 16:00 |
LAY NEW SERVICE - 5M IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
SWINEGATE |
20/09/21 22:00 |
25/09/21 05:00 |
2300-0600 - Daily - Inspection Assessment of the structure of the underside of the bridge |
|
GOWER STREET |
23/09/21 07:00 |
28/09/21 16:30 |
Excavate to dig 20m of track to connect into existing network and building chambers and cabinets where required as part of the city fibre build |
|
LEEDS ROAD |
22/09/21 18:00 |
22/09/21 22:00 |
|
|
LEEDS ROAD |
10/10/21 23:00 |
13/10/21 22:59 |
THESE WORKS ARE TO CLEAR VEGITATION AND TRIM BACK TREES AHEAD OF THE POLE INSTALLATION
WE WILL ALSO INSTALL ONE OF THE NEW CBAINETS |
|
KNOWLES LANE |
14/10/21 23:00 |
15/10/21 22:59 |
|
|
GRANGE DRIVE |
27/09/21 07:00 |
11/10/21 22:59 |
|
|
ABERFIELD GATE |
03/10/21 07:00 |
03/10/21 15:00 |
Excavation works -Eastbound Directional Road closure for hiab to install Telecoms pole |
|
KIRKBY LANE |
29/11/21 00:00 |
10/12/21 23:59 |
to lay 350m of duct in verge and 54m duct in carriageway |
|
WOOD STREET |
06/09/21 06:30 |
23/09/21 15:00 |
Improvement works (and change of layout) to junction between Methley road, Wood street and Saville road. |
|
LOVELL PARK HILL |
13/09/21 07:39 |
24/09/21 22:59 |
Excavate approx. 300m of footway and carriageway with x 2 crossings to build chambers and cabinets and connect into existing network. |
|
LEEDS ROAD |
03/10/21 07:00 |
04/10/21 05:00 |
|
|
LOVELL PARK CLOSE |
14/09/21 12:00 |
27/09/21 22:59 |
Excavate approx 200m in the footway and carriageway to build chambers and cabinets and connect into existing network. |
|
MILL GREEN CLOSE |
23/09/21 11:00 |
23/09/21 15:00 |
|
|
WHEELWRIGHT AVENUE |
18/10/21 07:00 |
18/10/21 16:00 |
|
|
BROWNBERRIE LANE |
25/07/22 07:00 |
05/08/22 22:59 |
|
|
WOOD LANE |
16/09/21 11:43 |
22/09/21 22:59 |
Repair leaking water supply pipe |
|
BECKETT STREET |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site... |
|
CLARENCE ROAD |
21/09/21 07:00 |
23/09/21 17:00 |
INSTALLATION OF APPROX 3M OF NEW DUCT |
|
STANNINGLEY BY-PASS |
15/03/21 10:30 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. ion. |
|
EYRES AVENUE |
05/04/21 19:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. . |
|
STANNINGLEY ROAD |
13/11/20 19:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
COCKSHOTT LANE |
29/03/21 08:30 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
LONSDALE STREET |
22/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street lights (5 of) |
|
ARMLEY GRANGE DRIVE |
25/01/21 07:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme.... |
|
MONK BRIDGE GROVE |
30/09/21 23:00 |
01/10/21 22:59 |
Renew stop tap + chamber |
|
BACON AVENUE |
04/10/21 07:00 |
05/10/21 16:00 |
Locate main, install valve + washout hydrant |
|
BRIDGE STREET |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
IVESON CRESCENT |
23/09/21 07:00 |
23/09/21 16:00 |
Renew stop tap + chamber |
|
JEREMY LANE |
16/09/21 06:55 |
21/09/21 22:59 |
|
|
TURNPIKE CLOSE |
08/11/21 08:00 |
12/11/21 18:00 |
|
|
NORTON ROAD |
25/10/21 11:00 |
25/10/21 15:00 |
Install water meter to supply pipe |
|
SIXTH AVENUE |
05/10/21 07:00 |
05/10/21 18:00 |
|
|
THE AVENUE |
04/10/21 07:30 |
06/10/21 15:30 |
|
|
STAINBECK LANE |
30/05/21 23:00 |
01/10/21 22:59 |
District Centre Scheme. Footpath remvoal around willow tree, to widen carriageway for two way traffic, with stopping up order closing northern arm of junction which will be paved as a district centre. Works to be complteded in several phases. Carriageway widening to be complted before northern arm closed permenantly. |
|
BELVEDERE ROAD |
06/12/21 00:00 |
10/12/21 23:59 |
Point closure at cross-roads for work on Oxford Street |
|
WHITE LEE ROAD |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
BACK CHATSWORTH ROAD |
27/09/21 23:00 |
28/09/21 22:59 |
Install stop tap + chamber |
|
CEDAR DRIVE |
07/10/21 07:00 |
07/10/21 16:00 |
|
|
TOPCLIFFE LANE |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
ROUNDHAY PARK LANE |
23/09/21 08:00 |
24/09/21 15:00 |
Excavation Pedestrian management works for Cab swap on 1st day, MEWP sitting on hard standing on 2nd day and civils works |
|
PROSPECT ROAD |
23/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street lights (4 of) |
|
TURNPIKE CLOSE |
06/12/21 08:00 |
10/12/21 18:00 |
|
|
CARDIGAN LANE |
21/09/21 23:00 |
24/09/21 22:59 |
|
|
A660 |
05/10/21 19:00 |
07/10/21 04:00 |
Dipstick NDT survey works for the purpose of smart street lighting project |
|
BROOM HALL AVENUE |
24/09/21 07:00 |
30/09/21 15:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint hole in footway and 2m trench in footway |
|
WELL BANK ROAD |
18/09/21 23:00 |
22/09/21 22:59 |
|
|
VALLEY FARM ROAD |
20/07/20 06:00 |
16/11/21 23:59 |
Leeds Public Transport Investment Programme A61 south - Part of LPTIP Works |
|
ROUNDHAY PARK LANE |
20/09/21 08:00 |
24/09/21 15:00 |
Excavation Pedestrian management works for Cab swap on 1st day, MEWP sitting on hard standing on 2nd day and civils works for the remainder of the week |
|
JUNCTION STREET |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
BUTTERLEY STREET |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
CROWN POINT ROAD |
27/11/19 08:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision.Some Carriageway incursion on days and Lane closure for nights between 19:30 and 06:00 |
|
TEMPLE STREET |
17/09/21 07:00 |
21/09/21 17:00 |
1 ,Install 2m of 1 way poly duct in Footway |
|
SMAWTHORNE LANE |
17/09/21 07:00 |
21/09/21 17:00 |
1 ,Install 1m of 1 way poly duct in Footway |
|
BROOKFIELD STREET |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. |
|
BLACK BULL STREET |
25/11/19 08:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision.Some carriagewy incursion on days and Lane Closure on nights between 19:30 and 06:00 |
|
LEATHLEY ROAD |
25/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. |
|
RING ROAD (SHADWELL) |
18/10/21 18:00 |
06/11/21 06:00 |
Construction works for ELOR |
|
WETHERBY ROAD |
04/10/21 18:00 |
23/10/21 05:00 |
ELOR works |
|
RING ROAD MOORTOWN |
25/10/21 08:30 |
29/10/21 14:30 |
Lane closures for remedial works |
|
HARROGATE ROAD |
25/10/21 08:30 |
29/10/21 14:30 |
Lane closures for remedial works |
|
SKELTONS LANE |
20/09/21 08:30 |
22/09/21 14:30 |
Installation of Lighting columns as part of ELOR |
|
CRACKENEDGE LANE |
12/09/21 23:00 |
24/09/21 22:59 |
|
|
TONG ROAD |
07/10/21 07:00 |
07/10/21 16:00 |
Install stop tap + chamber |
|
PARRY LANE |
21/09/21 23:00 |
24/09/21 22:59 |
|
|
BURTON ROAD |
25/08/21 08:00 |
29/09/21 22:59 |
|
|
FINKIN AVENUE |
29/09/21 23:00 |
06/10/21 22:59 |
renew ferrule on water main |
|
HIGH WOOD ROAD |
20/09/21 07:00 |
22/09/21 22:59 |
|
|
NEW LANE |
24/09/21 07:00 |
24/09/21 18:00 |
|
|
WOODHOUSE LANE |
07/10/21 23:00 |
08/10/21 22:59 |
EVENT - LEEDS ARENA - Queen Machine Symphonic feat Kerry Ellis - Strategic route for the Arena and h... |
|
DOMESTIC STREET |
06/09/21 09:00 |
19/11/21 23:59 |
Footway Maintenance |
|
MILL STREET EAST |
01/11/21 19:00 |
29/01/22 07:30 |
FOOTWAY RECONSTRUCTION AND KERBING WORKS |
|
BROADFIELD CLOSE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
WETHERBY ROAD |
29/09/21 18:00 |
01/10/21 05:00 |
Surfacing of carriageway |
|
HOLBECK LANE |
15/11/21 00:00 |
04/02/22 23:59 |
Footway maintenance |
|
SOUTH ACCOMMODATION ROAD |
11/11/19 07:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. W |
|
A64 |
20/09/21 18:00 |
09/10/21 05:00 |
ELOR WORKS |
|
HEY BECK LANE |
14/09/21 07:00 |
22/09/21 22:59 |
|
|
WETHERBY ROAD |
05/11/21 19:30 |
08/11/21 06:00 |
Surfacing of carriageway |
|
GROVE ROAD |
14/09/21 07:00 |
27/09/21 16:30 |
Excavate approx 130m trench in footway for CityFibre build. |
|
LEEDS ROAD |
09/02/22 01:00 |
10/02/22 23:59 |
Hours of work 0001 0545 shifts. Using on track machinery to consolidate ballast to improve track qu... |
|
BILLINGWOOD DRIVE |
05/10/21 07:00 |
11/10/21 16:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 2 joint holes in footway |
|
SISSONS ROAD |
22/11/21 00:00 |
07/01/22 23:59 |
LRS Fwy surfacing |
|
HARROGATE ROAD |
25/08/21 07:30 |
21/09/21 22:59 |
|
|
SISSONS TERRACE |
17/01/22 00:00 |
21/01/22 23:59 |
LRS Cwy surfacing |
|
BRITANNIA ROAD |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
HASLEMERE CLOSE |
18/09/21 23:00 |
22/09/21 22:59 |
|
|
BAINBRIGGE ROAD |
05/10/21 06:00 |
07/10/21 22:00 |
3LD0 Lead Renewal (Short Side) |
|
STATION ROAD |
01/10/21 21:00 |
02/10/21 06:00 |
Hours of work 2200 - 0700. Road Narrowing to allow safe access. Pedestrian marshalling in operation. |
|
LUMBY LANE |
05/10/21 07:00 |
05/10/21 16:00 |
Install water meter to supply pipe |
|
ROOK LANE |
10/10/21 23:00 |
15/10/21 22:59 |
|
|
NURSERY LANE |
06/09/21 08:30 |
30/09/21 22:59 |
NRSWA_Nursery Lane, Leeds
Notice for road closure only. |
|
WILLOW CRESCENT |
19/09/21 23:00 |
22/09/21 22:59 |
Install new water supply connection |
|
LEEDS ROAD |
09/02/22 00:00 |
10/02/22 23:59 |
Hours of work 0001 0545 shifts. Using on track machinery to consolidate ballast to improve track qu... |
|
GLEN GROVE |
07/10/21 07:00 |
07/10/21 16:00 |
Install water meter to supply pipe |
|
MARYFIELD AVENUE |
05/04/21 23:00 |
01/03/22 00:00 |
New signalised junction, segregated and shared cycleway / footways, controlled crossings and central reservation works. |
|
MAYLEA DRIVE |
16/09/21 23:00 |
21/09/21 22:59 |
Excavate in footway and locate/clear blockage(s) in order to provide new customer connection |
|
SAGAR STREET |
24/10/21 23:00 |
03/11/21 23:59 |
Connection due to mains replacement on Aire Street |
|
VICKERS STREET |
26/09/21 07:00 |
26/09/21 17:00 |
replace a pole |
|
SKINNER LANE |
31/01/22 22:00 |
01/02/22 23:59 |
Level Crossing Testing. Hours of works 22.00 - 06.00... |
|
BRADFORD ROAD |
13/10/21 07:00 |
13/10/21 16:00 |
Install water meter to supply pipe |
|
OLD ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
|
|
KINGSWOOD DRIVE |
28/10/21 07:00 |
28/10/21 11:00 |
Install water meter to supply pipe |
|
DEWSBURY ROAD |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
NEWSAM GREEN ROAD |
16/11/21 00:00 |
18/11/21 23:59 |
|
|
NEW YORK ROAD |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
WOODHOUSE STREET |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
THE AVENUE |
29/11/21 00:00 |
10/12/21 23:59 |
Connection due to mains replacement on Victoria Street |
|
|
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
MERRION STREET |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
PARK LANE |
13/08/21 06:00 |
11/10/21 18:00 |
Surfacing of carriageway for ELOR |
|
MARSH LANE |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
MERRION STREET |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
MERRION WAY |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
NORTH STREET |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
WETHERBY ROAD |
01/06/21 06:00 |
29/11/21 06:00 |
Road narrows scheme to allow Roundabout to be built incorporating Plant crossing |
|
RING ROAD (SHADWELL) |
04/06/21 06:00 |
11/10/21 17:00 |
Narrow lanes to accommodate works for ELOR |
|
TUNSTALL ROAD |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
ELLAND ROAD |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
LOVELL PARK HILL |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
WEETON LANE |
12/11/21 09:00 |
12/11/21 15:00 |
0900-1500 - To jet and clean culvert |
|
HARROWBY ROAD |
11/10/21 07:30 |
27/10/21 14:30 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 30m trench in footway |
|
HARWILL RISE |
09/09/21 08:00 |
22/09/21 22:59 |
Excavate approx 400m of footway and carriageway and 2 x crossings to build chambers and cabinets for CityFibre build. |
|
NORTH PARK AVENUE |
17/09/21 07:00 |
21/09/21 16:30 |
Carry out interim to perm reinstatement in the footway |
|
GOODMAN STREET |
26/10/21 07:00 |
04/02/22 23:59 |
NSWRA, Goodman Street, Leeds. Abandon 134.11m of 460mm ST and lay 133.11m of 400mm PE by ID. |
|
PORTAGE CRESCENT |
29/11/21 03:00 |
06/01/22 23:59 |
NSWRA, Portage Crescent, Leeds. Abandon 579.28m of 4 ST and lay 579.28m of 295mm PE bu ID.
Connections x 2 Transfer x 9 Relay x 13 |
|
LOVELL PARK ROAD |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
DONISTHORPE STREET |
26/10/21 07:00 |
04/02/22 23:59 |
NRSWA_Donisthorpe Road, Leeds. Abandon 224.89m of 18 , 10 CI and lay 216.34mm PE by ID.
Connections x 4 Transfer x 12 Relay x 18 |
|
HARWILL RISE |
08/09/21 07:00 |
21/09/21 22:59 |
Excavate approx 450m of footway and carriageway with 2 x crossings to build chambers and cabinets for CityFibre build. |
|
VICTORIA STREET |
22/11/21 00:00 |
03/12/21 23:59 |
Connection due to mains replacement on King George Street |
|
WHARFE CRESCENT |
01/11/21 00:00 |
12/11/21 23:59 |
LRS 2021/22 - Cway |
|
CROWN POINT ROAD |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
WEST END LANE |
15/09/21 07:00 |
21/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 2 joint holes in footway, 3m trench in footway |
|
VICAR LANE |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
BRIGGATE |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
WHARFE CRESCENT |
17/10/21 23:00 |
25/10/21 22:59 |
LRS 2021/22 - Fway |
|
MERRION WAY |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
VICTORIA STREET |
29/11/21 00:00 |
24/12/21 23:59 |
Abandon 248m of 150mmDI, 83m of 100mmDI, 15.5m of 6DI and 22.5m of 2ST, replace with 264m of 125mmPE, 83m of 90mmPE and 22.5m of 40mmPE by Dead Insert, Connections X10 Relays X12 Transfers X8 |
|
WOODHOUSE LANE |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
CHURCH AVENUE |
22/09/21 07:00 |
22/09/21 16:00 |
Reposition stop tap + chamber |
|
WOODHOUSE LANE |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
CONCORD STREET |
08/10/21 07:00 |
14/10/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in footway, 5m trench in footway |
|
GREAT GEORGE STREET |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
WETHERBY ROAD |
03/09/21 18:00 |
29/11/21 06:00 |
Surfacing of carriageway |
|
WOODSIDE VIEW |
12/10/21 07:00 |
26/10/21 22:59 |
|
|
PEVERIL MOUNT |
03/10/21 23:00 |
14/10/21 22:59 |
NPG SERVICE TRANSFER |
|
PICKERING STREET |
10/03/21 15:36 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
PICKERING STREET |
26/05/21 23:00 |
07/11/22 23:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
CROSS LANE |
20/09/21 23:00 |
21/09/21 22:59 |
Install new stop tap + chamber |
|
CROSS GATES LANE |
16/09/21 23:00 |
21/09/21 22:59 |
Excavate in verge and footway to extend existing Virgin Media network, construct new FW6 chamber and lay duct in order to provide new customer connection |
|
BRANDER ROAD |
17/09/21 07:00 |
30/09/21 16:30 |
Excavate approx. 420m of footway and verge to install CityFibre apparatus. |
|
BANK STREET |
03/10/21 23:00 |
13/10/21 22:59 |
|
|
KING GEORGE STREET |
13/09/21 09:00 |
24/09/21 22:59 |
Connection due to mains replacement on Park Avenue |
|
HOLLIN PARK ROAD |
13/10/21 07:00 |
29/10/21 22:59 |
|
|
RISHWORTH ROAD |
15/11/21 09:30 |
19/11/21 16:00 |
Nib of Centre island on Rishworth Road, Dewsbury. On the junction of Railway Street. |
|
LEEDS BARNSDALE ROAD |
19/09/21 23:00 |
01/10/21 22:59 |
road crossing on leeds barnsdale road/ connection to barnsdale estate |
|
STATION ROAD |
17/09/21 07:00 |
21/09/21 16:30 |
Excavate approx 1m of track in the footway to rectify blockage , CityFibre works. |
|
WHITEHOUSE STREET |
07/07/20 06:30 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. |
|
DUKE OF YORK STREET |
30/09/21 07:00 |
30/09/21 16:00 |
Install water meter to supply pipe |
|
WAKEFIELD ROAD |
12/10/21 07:00 |
25/10/21 16:30 |
Excavate 400m of track in footway and carriageway, 2 road crossings, chambers and cabinets for CityFibre build |
|
BRUNSWICK TERRACE |
19/11/21 00:00 |
19/11/21 23:59 |
EVENT - LEEDS ARENA - Steps - Strategic route for the Arena and heavier than normal traffic expected... |
|
ST ANDREW S AVENUE |
02/11/21 08:00 |
16/11/21 23:59 |
|
|
THIRLMERE DRIVE |
18/10/21 07:00 |
18/10/21 11:00 |
Install water meter to supply pipe |
|
CALVERLEY CUTTING |
17/09/21 06:00 |
21/09/21 17:00 |
|
|
WROSE ROAD |
27/07/21 23:00 |
28/10/21 22:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
MILES HILL ROAD |
26/10/21 11:00 |
26/10/21 15:00 |
Install water meter to supply pipe |
|
LEE MOOR ROAD |
28/09/21 23:00 |
05/10/21 22:59 |
Renew leaking water supply pipe |
|
MOOR LANE |
03/10/21 23:00 |
14/10/21 22:59 |
NPG SERVICE DISCONNECTION |
|
QUEEN S PARK DRIVE |
17/11/21 08:00 |
23/11/21 17:00 |
LAY 5 X NEW SERVICES - 5 X NEW SERVICES - 34M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - TWO WAY LIGHTS - PEDS TO USE WALKWAY PROVIDED |
|
NEW LINE |
09/11/21 00:00 |
12/11/21 23:59 |
|
|
NORTH LANE |
22/09/21 07:00 |
24/09/21 17:00 |
Installation of new duct and chambers |
|
WEST GATE |
27/09/21 18:00 |
27/09/21 22:30 |
REPLACE MANHOLE FRAME + COVERS |
|
SUNNY BANK ROAD |
05/10/21 07:00 |
05/10/21 15:30 |
|
|
BRUNSWICK ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
Renew lead supply from property boundary to water main |
|
ST LUKE S ROAD |
26/09/21 23:00 |
27/09/21 18:00 |
|
|
SOUTH VIEW ROAD |
16/09/21 10:20 |
22/09/21 22:59 |
Install 14m of 1 way poly duct in Carriageway,Install 57m of 1 way poly duct in Footway |
|
SHERBROOKE AVENUE |
18/10/21 06:30 |
05/11/21 23:59 |
NSWRA,Sherbrooke Avenue, Leeds. Abandon 200.49m of 4 ST, 100 DI and lay 635mm PE by ID.
Connections x 4 Transfer x 9 Relay x 14 |
|
HARWILL GROVE |
15/09/21 07:21 |
28/09/21 22:59 |
Excavate approx 150m of track in the footway + carriageway to install CityFibre apparatus. |
|
STATION CLOSE |
31/08/21 07:00 |
24/09/21 22:59 |
Abandon 42m of 4 SI, 20m of 2 ST. Replace with 42m of 63mm PE and 20m of 40mm LP PE by dead insertion.
Connections x 2, Relays x 7, Transfers x 4. |
|
JIN-WHIN HILL |
16/09/21 23:00 |
26/09/21 22:59 |
permit required for signal head - multiway signals for works on Methley road. |
|
CAXTON STREET |
27/09/21 18:00 |
27/09/21 22:30 |
No excavation, light head only |
|
LYMINGTON DRIVE |
22/11/21 08:00 |
03/12/21 23:59 |
|
|
SELBY ROAD |
15/09/21 08:58 |
21/09/21 22:59 |
renew ferrule on water main |
|
INGLEBOROUGH DRIVE |
16/09/21 23:00 |
21/09/21 22:59 |
REPLACE EXISTING POLE IN SITU |
|
ST PETER S STREET |
25/09/21 23:00 |
29/09/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
BOWLING BACK LANE |
27/07/21 23:00 |
28/10/21 22:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
ROOLEY LANE |
12/08/21 23:00 |
13/12/21 23:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
BANKFIELD ROAD |
22/09/21 23:00 |
27/09/21 22:59 |
Remedial works to rectify defective reinstatement - Rectify depression |
|
MARSHALL STREET |
06/10/21 23:00 |
07/10/21 22:59 |
Borehole with windowless sampler to be carried out to establish suitability of ground conditions for proposed telecommunications mast |
|
SWITHENS GROVE |
08/10/21 07:00 |
08/10/21 16:00 |
Renew stop tap + chamber |
|
THE ROUNDWAY |
07/10/21 07:00 |
07/10/21 16:00 |
Renew stop tap + chamber |
|
ST ALBAN ROAD |
06/10/21 07:00 |
08/10/21 16:30 |
To dig approx. 30m fw and verge with cw crossing at junction York Road, connecting into existing network and build chambers where required |
|
NABURN DRIVE |
02/09/21 07:00 |
22/09/21 22:59 |
Abandon 77.20m of 8SI, 55.50m of 6SI, 98.70m of 4SI and replace with 132.70m of 125mmPE, 98.70m of 90mmPE by Dead Insert.
Works to be carried out on both sides of the street
Relays x 11 Connections x 4 Transfers x 7
Relays x 5 Connections x 2 Transfers x 3 |
|
BROOKLANDS DRIVE |
13/09/21 09:28 |
24/09/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide future customer connections for new development site |
|
BROOKLANDS VIEW |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
RAMSHEAD GARDENS |
26/09/21 23:00 |
01/10/21 22:59 |
Carriageway Surfacing |
|
NABURN ROAD |
27/09/21 07:00 |
11/10/21 22:59 |
Abandon 159.60m of 6SI and replace with 159.60m of 125mmPE by Dead Insert.
Relays x 7 Connections x 2 Transfers x 5 |
|
BEXLEY MOUNT |
22/11/21 08:00 |
03/12/21 23:59 |
|
|
BURLINGTON ROAD |
15/09/21 00:30 |
21/09/21 22:59 |
Service cable fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavation |
|
CHEVINS CLOSE |
04/10/21 23:00 |
05/10/21 22:59 |
|
|
NOWELL LANE |
08/10/21 07:00 |
08/10/21 16:00 |
Excavate to locate service, check flow + pressure |
|
SHAW LANE |
23/09/21 08:30 |
23/09/21 14:30 |
CCTV to check condition of 225 Sewer, cust at 6a having issues we need to check our assets |
|
BROOMFIELD TERRACE |
29/09/21 23:00 |
06/10/21 22:59 |
|
|
NABURN ROAD |
13/09/21 11:00 |
01/10/21 22:59 |
Abandon 201m of 4SI and replace with 82.70m of 90mmPE, 48.50m of 63mmPE, 69.80m of 75mmPE by Live Insertion + Dead Insert.
Relays x 20 Connections x 6 Transfers x 14 |
|
BEXLEY VIEW |
08/11/21 08:00 |
19/11/21 23:59 |
|
|
KINGSDALE CRESCENT |
21/09/21 23:00 |
24/09/21 22:59 |
|
|
APPERLEY LANE |
28/10/21 23:00 |
02/11/21 23:59 |
Renew leaking water supply pipe |
|
HAREHILLS ROAD |
17/01/22 08:00 |
28/01/22 23:59 |
|
|
BIRKHILL |
15/09/21 10:30 |
21/09/21 22:59 |
Public Lighting Cable Fault ? Excavate to locate faulted cable, test faulted cable section and repair by jointing new cable and reinstate excavations. |
|
HIGH WOOD ROAD |
05/10/21 23:00 |
08/10/21 22:59 |
|
|
FOUNDRY MILL STREET |
02/11/21 12:00 |
02/11/21 16:00 |
Install water meter to supply pipe |
|
POLLARD WAY |
05/10/21 23:00 |
06/10/21 22:59 |
|
|
BARTHORPE CLOSE |
26/08/21 14:30 |
30/09/21 22:59 |
|
|
WOODEND CRESCENT |
05/11/21 08:00 |
05/11/21 12:00 |
Install water meter to supply pipe |
|
SERVIA HILL |
20/09/21 07:00 |
21/09/21 17:00 |
provide 1 new pole |
|
ARMLEY ROAD |
16/11/21 00:00 |
18/11/21 23:59 |
Accessing underground chamber to undertake essential fibre optice network maintenence. |
|
CARLTON VIEW |
28/09/21 07:00 |
29/09/21 17:00 |
provide 2 new poles |
|
MOORFIELD ROAD |
16/11/21 00:00 |
18/11/21 23:59 |
Accessing underground chamber to undertake essential fibre optice network maintenence. |
|
GREAT WILSON STREET |
16/11/21 00:00 |
18/11/21 23:59 |
Accessing underground chamber to undertake essential fibre optice network maintenence. |
|
SHERBURN APPROACH |
08/09/21 08:00 |
05/10/21 15:00 |
Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 3 joint holes in footway and 9m of trench in footway |
|
SHERBURN APPROACH |
15/09/21 13:00 |
05/10/21 22:59 |
CABLE OVERLAY - EXCAVATE 35M TRACK IN GINNEL |
|
HASLEWOOD DRIVE |
29/09/21 07:00 |
01/10/21 16:00 |
Install stop tap + chamber |
|
PARK ROAD |
18/10/21 11:00 |
18/10/21 15:00 |
Install water meter to supply pipe |
|
OLD RUN ROAD |
09/09/21 10:50 |
22/09/21 17:00 |
TM Only in conjunction with works on moor road |
|
POOLE CRESCENT |
24/10/21 23:00 |
28/10/21 22:59 |
Carriageway Surfacing Works |
|
MANSTON LANE |
07/10/21 07:30 |
13/10/21 15:00 |
High Voltage Connection - Excavate to Install Ducts/Cable, including 2 joint holes in verge. Connect new cable, transfer services and reinstate excavations |
|
HIGHMOOR LANE |
16/11/21 07:30 |
30/11/21 23:59 |
|
|
REDHALL CLOSE |
11/10/21 11:00 |
11/10/21 15:00 |
|
|
|
15/09/21 14:30 |
28/09/21 22:59 |
|
|
MILL LANE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
COMMONSIDE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
HIGH STREET |
19/09/21 23:00 |
28/09/21 22:59 |
|
|
HOLME WOOD ROAD |
13/09/21 23:00 |
27/09/21 22:59 |
|
|
GELDERD ROAD |
27/09/21 08:30 |
08/10/21 14:30 |
Installing Ducting Chambers ILD Boxes in footway for MOVA Loops |
|
|
20/09/21 23:00 |
23/09/21 22:59 |
LOCATE AND CLEAR DUCT BLOCKAGES |
|
SCOTLAND LANE |
20/09/21 23:00 |
23/09/21 22:59 |
LOCATE AND CLEAR DUCT BLOCKAGES |
|
LAWNS LANE |
13/09/21 07:00 |
13/10/21 16:30 |
Excavate approx. 1100 metres in the footway and carriageway for continuation of CityFibre build. |
|
LAWNS LANE |
01/10/21 07:00 |
14/10/21 16:30 |
Excavate approx 600m of track in the footway and carraigeway to install CityFibre apparatus. |
|
BEXLEY GROVE |
08/11/21 08:00 |
03/12/21 23:59 |
|
|
SAVILE ROAD |
15/09/21 07:00 |
21/09/21 15:00 |
Installing New Sign Plate x 1 |
|
ARRAN DRIVE |
20/09/21 23:00 |
23/09/21 22:59 |
LOCATE AND CLEAR BLOCKAGE |
|
CHURCH STREET |
22/10/21 07:00 |
28/10/21 16:00 |
DISCONNECT 2 x 2 ST SERVICES IN CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
DONISTHORPE STREET |
03/10/21 23:00 |
08/10/21 22:59 |
|
|
PIT FIELD ROAD |
10/11/21 08:00 |
16/11/21 17:00 |
LAY NEW SERVICE - 4M IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
HALL CLOSE |
20/09/21 07:00 |
22/09/21 22:50 |
Performing an excavation in the footway to install telecoms box/duct. |
|
MIDDLETON PARK ROAD |
24/09/21 08:30 |
27/09/21 14:30 |
Install bus shelter AN 10050 |
|
ALBION STREET |
14/09/21 23:00 |
21/09/21 22:59 |
|
|
NORTH CLOSE |
08/11/21 08:00 |
03/12/21 23:59 |
Abandon 40.50m of 6 SI, 213m of 4 SI and 31.80m of 2 ST. Replace with 40.50m of 125mm LP PE, 213m of 90mm LP PE and 31.80m of 31.80mm LP PE.
Connections x 5, Relays x 21, Transfers x 15 |
|
INNER RING ROAD |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See seperate LAs for associated closures on NYR, York Road, Regent Street , Eastgate and Bell Street. |
|
WATERGATE |
10/10/21 23:00 |
25/10/21 22:59 |
|
|
YORK ROAD |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See seperate LAs for associated closures on IRR, New York Road, Regent Street , Eastgate and Bell Street. |
|
YORK ROAD |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See seperate LAs for associated closures on IRR, York Road, Regent Street , Eastgate and Bell Street. |
|
EASTGATE |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See seperate LAs for associated closures on NYR, York Road, York Road, Regent Street and Bell Street. |
|
MABGATE |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See seperate LAs for associated closures on IRR, York Road, York Road, Eastgate and Bell Street. |
|
A61 |
14/10/19 07:00 |
16/11/21 23:59 |
Highway works associated with the construction of Stourton Park and Ride as part of Leeds Public Transport Investment Programme |
|
A639 |
28/07/20 18:00 |
16/11/21 23:59 |
Highway works associated with the construction of Stourton Park and Ride as part of Leeds Public Transport Investment Programme |
|
GRANGE AVENUE |
13/09/21 11:50 |
21/09/21 16:00 |
Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 1 joint hole in footway |
|
MEANWOOD ROAD |
17/09/21 07:00 |
23/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in footway, 1m trench in verge |
|
MILL LANE |
16/08/21 08:00 |
18/10/21 22:59 |
|
|
MILLSHAW |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
STONY LANE |
17/09/21 06:00 |
21/09/21 17:00 |
|
|
MILLSHAW ROAD |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
DEWSBURY ROAD |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
TOWN STREET |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
WESLEY STREET |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
RAILWAY STREET |
18/10/21 07:00 |
19/11/21 16:00 |
Installation of a push button pedestrian crossing point. |
|
RING ROAD BEESTON |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
DEWSBURY ROAD |
05/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Mass Vaccination Site
... |
|
CLAY PIT LANE |
28/09/21 23:00 |
30/09/21 22:59 |
FIT ELECTRONINC EQUIPMENT TO COLUMN FOR LCC |
|
WESTWOOD SIDE |
24/09/21 07:00 |
28/09/21 16:30 |
Carry out remedial works to rectify outstanding defects. |
|
GREAT WILSON STREET |
28/09/21 23:00 |
29/09/21 22:59 |
FIT ELECTRONINC EQUIPMENT TO COLUMN FOR LCC |
|
SHEAF STREET |
12/09/21 23:00 |
17/06/22 22:59 |
Junction improvement and public realm works |
|
CROWN POINT ROAD |
28/09/21 23:00 |
29/09/21 22:59 |
FIT ELECTRONINC EQUIPMENT TO COLUMN FOR LCC |
|
BRIDGE END |
28/09/21 23:00 |
29/09/21 22:59 |
FIT ELECTRONINC EQUIPMENT TO COLUMN FOR LCC |
|
POOLE ROAD |
04/10/21 07:00 |
05/11/21 23:59 |
|
|
CROWN POINT ROAD |
12/09/21 23:00 |
17/06/22 22:59 |
Junction improvement and public realm works |
|
DEWSBURY ROAD |
15/09/21 14:00 |
21/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in footway, 3m trench in footway |
|
NORTH WAY |
18/10/21 07:00 |
04/11/21 23:59 |
Abandon 121.40m of 4 SI, 41.40m of 4 DI + 16.70m OF 2 ST. Replace with 162.80m OF 90mm LP PE + 16.70m of 40mm LP PE by dead insertion.
Connections X 4. Relays x 10 + Transfers X 8 |
|
HUNSLET LANE |
16/09/21 23:00 |
23/09/21 22:59 |
NEW CONNECTION COLUMN 26G295 NPG FOR LCC |
|
NEW ROAD SIDE |
22/09/21 23:00 |
27/09/21 22:59 |
2 x core drills, 1 toby and FW/2 box. |
|
CRESCENT AVENUE |
30/09/21 07:00 |
20/10/21 22:59 |
|
|
CROW LANE |
24/09/21 07:00 |
30/09/21 16:00 |
ALTER EXISTING GAS SERVICE - WORKS IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
HIGH STREET |
22/09/21 23:00 |
23/09/21 22:59 |
|
|
WYNFORD MOUNT |
15/09/21 07:00 |
28/09/21 16:30 |
|
|
LOW LANE |
26/10/21 07:00 |
02/11/21 17:30 |
Excavate approx 210m of track in the carriageway to install CityFibre apparatus. |
|
PONTEFRACT LANE |
02/10/21 19:00 |
03/10/21 05:00 |
Loop cutting on the M1 southbound jct 45-jct 44 |
|
LINCOLN ROAD |
22/09/21 23:00 |
29/09/21 22:59 |
DISCO/TRANSFER COLUMN 6L306 NPG FOR LCC |
|
WOODHOUSE LANE |
26/10/22 23:00 |
27/10/22 22:59 |
EVENT - LEEDS ARENA - Cirque Du Soleil - Corteo - Strategic route for the Arena and heavier than no... |
|
NORTH GROVE DRIVE |
04/01/22 08:00 |
29/01/22 23:59 |
Abandon 206.40m of 4 SI. Replace with 215.59m of 90mm LP PE by dead insertion.
Connections x 2, Relays x 23, Transfers x 6 |
|
NORTH GROVE RISE |
18/01/22 08:00 |
28/02/22 23:59 |
|
|
NORTH LANE |
11/10/21 07:00 |
10/12/21 23:59 |
Abandon 168.1m of 8 SI, 130.6m OF 6 SI + 158.2m OF 4 SI. Replace with 168.1m OF 180mm LP PE, 130.6m of 125mm LP PE + 158.2mm OF 90mm LP PE.
11 X CONNECTIONS. 25.8 X RELAYS. 18 X TRANSFERS |
|
TOWN STREET |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
WYNFORD AVENUE |
20/09/21 07:00 |
01/10/21 16:30 |
|
|
NEW YORK ROAD |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See separate LAs for associated closures on IRR, York Road, Regent Street , Eastgate and Bell Street. |
|
INNER RING ROAD |
23/10/21 19:00 |
01/11/21 05:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See seperate LAs for associated closures on NYR, York Road, Regent Street , Eastgate and Bell Street. |
|
BELL STREET |
14/10/21 19:00 |
23/10/21 04:30 |
Regent Street Reconstruction Scheme. New Bridge Beam Installation. Road closure from 20:00 to 05:30 overnight with diversion. See separate LAs for associated closures on IRR, NYR, York Road, Regent Street, and Eastgate. |
|
LOMBARD STREET |
03/10/21 23:00 |
10/10/21 22:59 |
LRS 2021/22 - Cway |
|
YORK ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
|
|
MONKSWOOD BANK |
21/09/21 07:00 |
21/09/21 16:00 |
|
|
MIDDLETON PARK CIRCUS |
22/09/21 08:30 |
24/09/21 14:30 |
Install bus shelter AN10012 |
|
LOMBARD STREET |
26/09/21 23:00 |
01/10/21 22:59 |
LRS 2021/22 - Fway |
|
MILL LANE |
02/11/21 21:30 |
02/11/21 23:30 |
|
|
NEW YORK ROAD |
20/11/21 20:00 |
25/11/21 05:30 |
Regent Street Reconstruction Scheme. Lane 2 Closure on slip road down to Regent Street. Shuttering - North West Wing Wall. 20:00 to 05:30 each night. See also closure of A61 Eastgate. |
|
NEW YORK ROAD |
04/12/21 20:00 |
09/12/21 05:30 |
Regent Street Reconstruction Scheme. Shuttering - North West Wing Wall/Paraslim Removal. Road Closure from 20:00 to 05:30 with diversion. |
|
NEW YORK ROAD |
04/12/21 20:00 |
09/12/21 05:30 |
Regent Street Reconstruction Scheme. Lane 2 Closure on slip road down to Regent Street. Shuttering - North West Wing Wall. 20:00 to 05:30 each night. See also closure of A61 Eastgate. |
|
OBAN CLOSE |
15/09/21 07:00 |
29/09/21 22:59 |
Connection only in conjunction with works on Dewsbury Road |
|
HOUGHLEY LANE |
25/01/21 07:00 |
24/06/22 22:59 |
A647 corridor works part of Leeds Public Transport Investment Programme. |
|
HILLFOOT DRIVE |
17/09/21 07:00 |
21/09/21 16:30 |
Carry out interim to perm reinstatement in the footway |
|
HOLLIN PARK CRESCENT |
12/10/21 23:00 |
26/10/21 22:59 |
|
|
NEW YORK ROAD |
13/11/21 20:00 |
18/11/21 05:30 |
Regent Street Reconstruction Scheme. Lane 2 Closure on slip road down to Regent Street. Shuttering - North West Wing Wall. 20:00 to 05:30 each night. See also closure of A61 Eastgate. |
|
NEW YORK ROAD |
27/11/21 20:00 |
02/12/21 05:30 |
Regent Street Reconstruction Scheme. Shuttering - North West Wing Wall/Paraslim Removal. Road Closure from 20:00 to 05:30 with diversion. |
|
NEW YORK ROAD |
27/11/21 20:00 |
02/12/21 05:30 |
Regent Street Reconstruction Scheme. Lane 2 Closure on slip road down to Regent Street. Shuttering - North West Wing Wall. 20:00 to 05:30 each night. See also closure of A61 Eastgate. |
|
NEW YORK ROAD |
20/11/21 20:00 |
25/11/21 05:30 |
Regent Street Reconstruction Scheme. Shuttering - North West Wing Wall. Road Closure from 20:00 to 05:30 with diversion. |
|
SPEN LANE |
13/09/21 07:34 |
24/09/21 16:30 |
Excavate approx 100m trench in the footway and verge. |
|
PRIMROSE CRESCENT |
29/09/21 07:00 |
01/10/21 16:00 |
|
|
MELTON AVENUE |
27/09/21 07:00 |
29/09/21 16:00 |
Reposition stop tap + chamber |
|
ASKET HILL |
04/03/22 08:00 |
07/04/22 22:59 |
Abandon 10m of 4 SI. Replace with 10m of 125mm Pe at jct Ladwodd Mead.
Connect to Elmete Hill and Elmete Way.
Connections x 3, Relays x 0, Transfers x 0. |
|
CROSS CROWN STREET |
07/12/21 19:00 |
18/12/21 07:30 |
Point closure for work on Northgate |
|
AYRESOME AVENUE |
27/10/21 07:00 |
27/10/21 16:00 |
|
|
ROUNDHAY ROAD |
22/09/21 23:00 |
23/09/21 22:59 |
ssential Works under Covid-19 Guidance and Government guidelines of social distancing to the public and team members.NON EXCAVATION: WORKING ON EXISITING TELECOMMUNICATIONS SITE AT HEIGHT TO WORK ON MAST HEAD. Lane Closure + priority system to be used. Footway closed, pedestrians to be diverted at nearest corssing points. Bus Stop to be suspended. |
|
RUSHTON STREET |
26/09/21 23:00 |
29/09/21 22:59 |
Kerbing, Footway and Drainage works |
|
NORTHGATE |
07/12/21 19:00 |
18/12/21 07:30 |
CARRIAGEWAY RESURFACING WORKS 100mm DEPTH INCLUDING ADJUSTMENT/REPLACEMENT OF IRONWORK AND REINSTATEMENT OF ROADMARKINGS. |
|
HOLBORN APPROACH |
19/09/21 23:00 |
01/10/21 22:59 |
LRS 2021/22 - Cway |
|
DIB LANE |
21/10/21 23:00 |
04/11/21 23:59 |
|
|
KIRKDALE AVENUE |
27/07/21 13:20 |
29/10/21 22:59 |
|
|
HIGHFIELD ROAD |
29/09/21 23:00 |
04/10/21 22:59 |
|
|
LEY FLEAKS ROAD |
29/09/21 23:00 |
04/10/21 22:59 |
|
|
ACACIA DRIVE |
27/09/21 07:00 |
29/09/21 16:00 |
Drop kerb - formation of simple drop kerb to Acacia Walk (Private Drive),
No TM but pedestrian walkway will be provided |
|
QUEENS DRIVE |
20/10/21 07:00 |
26/10/21 16:00 |
ALTER EXISTING GAS SERVICE - WORKS IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
KIRKDALE CRESCENT |
10/09/21 07:00 |
24/09/21 22:59 |
NRSWA_CONN_Kirkdale Drive, Leeds
Connection only in conjunction with works on Kirkdale Crescent.
Connections x 2, Relays x 0, Transfers x 0. |
|
UPPER RUSHTON ROAD |
05/10/21 23:00 |
06/10/21 22:59 |
|
|
NEW YORK ROAD |
20/11/21 20:00 |
25/11/21 05:30 |
Regent Street Reconstruction Scheme. Traffic Signals/Islands Works. Road Closure from 20:00 to 05:30 with diversion. |
|
GELDERD ROAD |
11/10/21 07:00 |
18/10/21 16:30 |
Excavate approx. 120m of track in the footway, x1 Carriageway crossing to install CityFibre apparatus. |
|
NEW VILLAGE WAY |
01/03/22 08:00 |
14/03/22 23:59 |
|
|
THE TURNWAYS |
10/10/21 23:00 |
22/11/21 23:59 |
C/way resurfacing |
|
BRITANNIA ROAD |
25/07/22 07:00 |
10/08/22 22:59 |
|
|
ORANGE STREET |
27/09/21 23:00 |
28/09/21 22:59 |
|
|
LEEDS ROAD |
27/09/21 23:00 |
28/09/21 22:59 |
|
|
QUEEN STREET |
21/09/21 23:00 |
24/09/21 22:59 |
Repair leaking water supply pipe |
|
PROSPECT STREET |
30/10/21 07:00 |
30/10/21 12:00 |
Silo replacement and repair |
|
PROSPECT STREET |
02/10/21 07:00 |
02/10/21 12:00 |
Silo replacement and repair |
|
CANAL LANE |
13/10/21 23:00 |
18/10/21 22:59 |
Renew leaking water supply pipe |
|
PINFOLD LANE |
27/09/21 23:00 |
30/09/21 22:59 |
Disconnect and Remove Kiosk |
|
CANNON STREET |
13/12/21 00:00 |
24/12/21 23:59 |
Notice only for lighthead due to gas main replacement on Leeds Road |
|
CASTLE PARADE |
08/11/21 00:00 |
26/11/21 23:59 |
Notice only for lighthead due to gas main replacement ob Front Street |
|
BELLWOOD AVENUE |
28/09/21 07:00 |
04/10/21 16:00 |
ALTER EXISTING GAS SERVICE - WORKS IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
GRAFTON STREET |
13/12/21 00:00 |
24/12/21 23:59 |
Notice only for lighthead due to gas main replacement on Leeds Road |
|
CARR WOOD ROAD |
08/11/21 00:00 |
26/11/21 23:59 |
Notice only for lighthead due to gas main replacement ob Front Street |
|
CARR LANE |
22/11/21 00:00 |
03/12/21 23:59 |
Connection and Lighthead due to gas main replacement on Leeds Road |
|
WOOD S ROW |
04/10/21 07:00 |
12/10/21 16:00 |
LAY NEW MAINS + SERVICES TO FEED NEW BUILDS - 1M IN PUBLIC FW |
|
STREET LANE |
18/10/21 07:00 |
29/10/21 16:30 |
Excavate approx 280m trench in footway and 2x road crossings over moorland view and moorland walk for cityfibre build |
|
SCOTCHMAN LANE |
16/09/22 07:00 |
28/10/22 22:59 |
Abandon 69.20m of 6 Ci, 207m of 6 Si. 31.40m of 4 CI and 20.20m of 2 ST. Replace with 276.20m of 125mm PE, 31.40m of 90mm PE and 20.20m of 40mm PE by dead insertion.
Connections x 7, Relays x 38 Transfers x 25 |
|
LINTON ROAD |
25/08/20 23:00 |
25/01/22 23:59 |
No waiting at any time restriction Linton Common to 75m past junction of Beck Lane... |
|
A647 |
23/11/21 09:30 |
23/11/21 15:30 |
Install overhead fibre cabling |
|
THE TURNWAYS |
10/10/21 23:00 |
22/11/21 23:59 |
C/way resurfacing |
|
|
05/10/21 23:00 |
08/10/21 22:59 |
ESSENTIAL UPGRADE WORKS ON EXISTING TELECOMS CABINETS ON SITE, WORKING WITHIN EXISTING CABINETS ONLY |
|
GILDERSOME SPUR |
08/09/21 14:01 |
21/09/21 22:59 |
Excavate approx 260m of footway and carriageway with 2 x road crossings to build chamber and cabinet. |
|
VICKERS STREET |
28/07/22 07:00 |
08/08/22 22:59 |
|
|
FOUNTAIN STREET |
24/07/22 23:00 |
10/08/22 22:59 |
|
|
ALTOFTS ROAD |
26/09/21 23:00 |
30/09/21 22:59 |
Install new water supply connection |
|
SHERBURN ROAD NORTH |
22/09/21 07:00 |
22/09/21 16:00 |
2924-POLLUTION LINING
WORKING FROM M/H IN C/W |
|
CLOVER COURT |
30/09/21 23:00 |
01/10/21 22:59 |
Install stop tap + chamber |
|
VERNON PLACE |
19/09/21 23:00 |
22/10/21 22:59 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 5 joint holes in carriageway, 100m trench in carriageway |
|
SHARP STREET |
13/10/21 23:00 |
21/10/21 22:59 |
|
|
YORK ROAD |
18/04/21 23:00 |
01/03/22 23:59 |
New signalised junction, segregated and shared cycleway / footways, controlled crossings and central reservation works. |
|
KIRKDALE CRESCENT |
13/08/21 07:00 |
11/10/21 22:59 |
|
|
WHITE LAITHE ROAD |
22/09/21 07:00 |
22/09/21 16:00 |
Traffic Light head in conjunction with QB043252745850050-01 |
|
WAKEFIELD ROAD |
11/10/21 07:00 |
22/10/21 16:30 |
Excavate approx. 520m of footway track including 2x carriageway crossings to install CityFibre apparatus. |
|
EDWARD STREET |
28/09/21 07:00 |
07/10/21 16:00 |
LAY NEW SERVICE - 9M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - PRIORITY WORKING - PEDS TO USE ALTERNATIVE FOOTWAY |
|
TEMPLE VIEW TERRACE |
16/09/21 23:00 |
21/09/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
EDGWARE PLACE |
29/09/21 23:00 |
04/10/21 22:59 |
Renew stop tap + chamber |
|
LONGWOOD CLOSE |
16/09/21 07:00 |
30/09/21 22:59 |
Abandon 108.50m of 4SI and replace with 108.50m of 90mmPE by Dead Insert.
Relays x 0 Connections x 2 Transfers x 0 |
|
TALBOT STREET |
15/09/21 07:00 |
21/09/21 22:59 |
|
|
LONG ROW |
29/09/21 07:00 |
12/10/21 17:00 |
|
|
LISTER HILL |
29/09/21 07:00 |
12/10/21 17:00 |
|
|
HOLMSLEY LANE |
28/06/21 07:00 |
01/10/21 22:59 |
|
|
HILLCREST RISE |
08/10/21 07:00 |
12/10/21 16:00 |
Install stop tap + chamber |
|
TEMPEST ROAD |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
PONTEFRACT ROAD |
17/01/22 00:00 |
28/01/22 23:59 |
Connection and lightheads due to gas main replacement on Weetworth Park |
|
SWEET STREET |
06/09/21 07:00 |
08/10/21 16:00 |
Works to footway, excavate and remove existing footway, install new pin kerbs, type 1 and paving to Siddall Street and Sweet Street. |
|
LOWER LANE |
18/10/21 07:00 |
29/10/21 17:00 |
|
|
VICAR LANE |
16/09/21 10:00 |
22/09/21 22:59 |
Low Voltage Mains Cable Fault ? Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. |
|
CONWAY PLACE |
07/03/22 08:00 |
21/03/22 23:59 |
Connection only in conjunction with woks on Darfield Place |
|
EASY ROAD |
10/01/22 00:00 |
21/01/22 23:59 |
Connection notice only. |
|
BURTON ROAD |
16/09/21 07:00 |
29/09/21 22:59 |
Connection notice only. |
|
YORK ROAD |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
ALBION STREET |
12/07/21 08:00 |
13/10/21 15:00 |
Civils works to remove poles and equipment and install new traffic signal equipment . |
|
WOODHOUSE LANE |
12/07/21 08:00 |
13/10/21 15:00 |
Civils works to remove poles and equipment and install new traffic signal equipment . |
|
CAVALIER APPROACH |
03/01/22 08:00 |
18/01/22 23:59 |
NSRWA_Cavalier Approach, Leeds. Abandon 114.22 4 SI and lay 114.22m of 120mm PE by ID.
Transfer x 2 Relay x 2 Connections x 2 |
|
SIDDALL STREET |
06/09/21 07:00 |
08/10/21 16:00 |
Works to footway, excavate and remove existing footway, install new pin kerbs, type 1 and paving to Siddall Street and Sweet Street. |
|
ASHTON MOUNT |
14/02/22 08:00 |
28/02/22 23:59 |
Abandon 20.10m of 50mmST and replace with 40mmPE by Dead Insert
Relays x 2 Connections x 2 Transfers x 1 |
|
CONWAY PLACE |
14/02/22 08:00 |
28/02/22 23:59 |
Connection only in conjunction with works on Darfield Street. |
|
SLIPPER LANE |
21/09/21 23:00 |
24/09/21 22:59 |
|
|
BRUNTCLIFFE ROAD |
03/08/22 23:00 |
22/09/22 22:59 |
|
|
|
22/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street light |
|
BACK IVY STREET |
16/09/21 07:00 |
30/09/21 22:59 |
Connection only in conjunction with works on Back Ivy Street. |
|
WOODHOUSE STREET |
10/10/21 23:00 |
15/10/21 22:59 |
Build 1 concrete chamber 1220mm x 680mm x 1665mm deep in footway Demolish 1 existing jointbox(s) or cabinet base(s) |
|
TANSHELF DRIVE |
20/09/21 23:00 |
23/09/21 22:59 |
Excavate in footway and re-locate existing termination point on Virgin Media network in order to provide new customer connection |
|
SELBY ROAD |
09/08/21 07:00 |
30/11/21 17:00 |
Construction of new ghost island junction, including (inter alia) widening, tie-ins, resurfacing, lighting, signing, drainage and lining works etc. |
|
MOORHOUSE AVENUE |
17/10/21 23:00 |
22/10/21 22:59 |
Excavate 1m in carriageway (entrance to site) to enable new gas connection to serve new development. |
|
ANNIE STREET |
07/10/21 07:00 |
07/10/21 16:00 |
Install stop tap + chamber |
|
COTTINGLEY DRIVE |
20/09/21 07:00 |
24/09/21 15:00 |
Lay heating pipe to feed Cottingley Towers and Cottingley Heights |
|
LING LANE |
19/09/21 23:00 |
22/09/21 22:59 |
permit for the use of TM in realtion to permit YN108-LDS1123-WHp3UK-TW1 |
|
HUNSLET ROAD |
28/06/20 23:00 |
27/12/21 23:59 |
Road closure and turn bans required for remodelling of junction as part of LPTIP works.... |
|
KING GEORGE AVENUE |
02/10/21 07:00 |
03/10/21 16:30 |
Excavate 1 x 12m road crossing. |
|
|
17/10/21 23:00 |
29/10/21 22:59 |
Connection only due to mains replacement on Bradley Street |
|
WESLEY STREET |
17/10/21 23:00 |
29/10/21 22:59 |
Connection and Road Closure due to mains replacement on Bradley Street |
|
AMBERTON PLACE |
16/09/21 08:54 |
22/09/21 22:59 |
Renew leaking water supply pipe |
|
OAK DRIVE |
04/10/21 07:00 |
18/10/21 22:59 |
Abandon 15m of 4 SI. Replace with 15m of 90mm LP PE by dead insertion.
Connections x 1, Relays x 0, Transfers x 0. |
|
GREAT NORTH ROAD |
30/09/21 07:00 |
08/10/21 17:00 |
|
|
CHURCHVILLE TERRACE |
30/09/21 07:00 |
13/10/21 17:00 |
|
|
YORK ROAD |
12/06/20 23:00 |
05/10/21 22:59 |
Bus lane suspension required for Leeds City Council (Bridges) due to contraflow on A64/A64(M).... |
|
EASTGATE |
14/09/21 20:10 |
21/09/21 22:59 |
Low Voltage Mains Cable Fault ? Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavations. |
|
MEADOW ROAD |
20/10/21 07:00 |
21/10/21 16:00 |
Dropped Kerb |
|
PARK DALE |
16/09/21 07:00 |
08/10/21 15:00 |
|
|
PARK FIELD |
16/09/21 07:00 |
06/10/21 15:00 |
|
|
TATEFIELD GROVE |
24/09/21 07:00 |
07/10/21 22:59 |
|
|
WOODSIDE VIEW |
15/09/21 10:50 |
21/09/21 22:59 |
Repair Leaking Pipe |
|
MOORSIDE ROAD |
28/09/21 23:00 |
12/10/21 22:59 |
Excavate to dig approx. 560m in footway, carriageway to be used if footway is congested, x4 road crossings adjacent to 221, junction Moorside Mount and junction Moorside Approach, building chambers and cabinets where required |
|
NOON CLOSE |
15/11/21 08:00 |
21/12/21 17:30 |
Excavating in footway and carriageway to lay new sewer pipe. |
|
LEEDS ROAD |
22/09/21 07:00 |
22/09/21 16:00 |
Install stop tap + chamber |
|
BRADFORD ROAD |
16/09/21 07:00 |
06/10/21 15:00 |
NRSWA_Permit_Bradford Road:Menston
Abandon 169.6m of 4in SI and replace with 63mm 40mm and 90mm PE by dead insertion |
|
CONWAY TERRACE |
25/10/21 07:00 |
08/11/21 23:59 |
Connection only in conjunction with works on Conway Terrace |
|
HAREHILLS ROAD |
27/09/21 07:00 |
11/10/21 22:59 |
Connection only in conjunction with works on Back Conway Street |
|
MIDDLETON ROAD |
25/10/21 07:00 |
12/11/21 23:59 |
Abandon 249.50m of 4 Si. Replace with 240.50m of 90mm Pe by dead insertion.
Connections x 4, Relays x 10, Transfers x 7. |
|
BRADLEY AVENUE |
22/11/21 00:00 |
17/12/21 23:59 |
Connection due to mains replacement on Bradley Avenue |
|
CONWAY AVENUE |
14/10/21 07:00 |
28/10/21 22:59 |
Connection only in conjunction with works on Conway Avenue |
|
BAILDON CLOSE |
08/11/21 00:00 |
12/11/21 23:59 |
Carriageway Surfacing |
|
LANE END |
03/10/21 23:00 |
06/10/21 22:59 |
Permit for TM setup only |
|
A64 |
29/09/21 07:30 |
05/10/21 15:30 |
LAY NEW 63MM MAINS + 32M NEW SERVICES - NGN TO EX PUB ALL |
|
LEEDS ROAD |
31/03/21 23:00 |
01/01/22 23:59 |
Improvement Works |
|
WATTLESYKE |
15/09/21 18:42 |
21/09/21 22:59 |
Repair burst water main |
|
OTLEY ROAD |
14/09/21 12:30 |
29/10/21 15:00 |
|
|
BOLTON ROAD |
29/09/21 23:00 |
10/10/21 22:59 |
NPG SERVICE TRANSFER |
|
LINTON GROVE |
10/09/21 13:30 |
23/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1x joint hole and 18m trench in footway. |
|
RAWSON SQUARE |
29/09/21 23:00 |
10/10/21 22:59 |
NPG SERVICE TRANSFER |
|
RUDGATE PARK |
16/09/21 07:00 |
22/09/21 17:00 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 1 joint holes in carriageway, 5m trench in carriageway |
|
STATION ROAD |
29/09/21 23:00 |
10/10/21 22:59 |
NPG SERVICE TRANSFER |
|
LADY BALK LANE |
11/10/21 08:00 |
15/10/21 22:00 |
2924-POLLUTION LINING - SE45225901 - SE45226905
2924-POLLUTION LINING - SE45225902 |
|
ABERFIELD GATE |
04/10/21 08:30 |
06/10/21 14:30 |
Excavtion works - Lane Closure for deliveries and work vehicles for the rigging and installation of pole install on footpath with terraplas walkway on grass verge for pedestrians |
|
MISTRESS LANE |
15/07/21 07:15 |
01/10/21 22:59 |
|
|
KINGSDALE CRESCENT |
24/10/21 23:00 |
29/10/21 22:59 |
|
|
ST WILFRIDS DRIVE |
15/09/21 01:00 |
21/09/21 22:59 |
Repair burst water main |
|
OAKDENE DRIVE |
11/10/21 23:00 |
14/10/21 22:59 |
Excavate 1 location/s and install copper earthing strip to en |
|
SEVERN ROAD |
23/09/21 23:00 |
24/09/21 22:59 |
renew fire hydrant frame + cover |
|
MONTAGU AVENUE |
25/10/21 07:00 |
05/11/21 18:00 |
Cable Overlay (High Voltage) - Excavate to Install cable, joint new cable, transfer services and reinstate excavations, including 1m trench in footway |
|
NEW YORK ROAD |
20/12/21 20:00 |
24/12/21 05:30 |
Regent Street Reconstruction Scheme. New Parapet Installation/Paraslim Striking. Road Closure from 20:00 to 05:30 with diversion. |
|
BRIGGATE |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
NEW YORK ROAD |
11/12/21 20:00 |
16/12/21 05:30 |
Regent Street Reconstruction Scheme. New Parapet Installation/Paraslim Striking. Road Closure from 20:00 to 05:30 with diversion. |
|
WOODHOUSE LANE |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
WOODHOUSE LANE |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
NEW YORK ROAD |
17/11/21 20:00 |
19/11/21 05:30 |
Regent Street Reconstruction Scheme. New Parapet Installation/Paraslim Striking. Road Closure from 20:00 to 05:30 with diversion. |
|
GREAT GEORGE STREET |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
LOVELL PARK ROAD |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
VICAR LANE |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
NEW YORK ROAD |
18/12/21 20:00 |
23/12/21 05:30 |
Regent Street Reconstruction Scheme. New Parapet Installation/Paraslim Striking. Road Closure from 20:00 to 05:30 with diversion. |
|
CROWN POINT ROAD |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
MERRION WAY |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
BACK LANE |
03/10/21 23:00 |
06/10/21 22:59 |
Excavate in footway and carriageway to extend existing Virgin Media network, construct new FW2 chamber and lay duct in order to provide future customer connections for new development site |
|
BROOKLANDS GARTH |
16/09/21 23:00 |
21/09/21 22:59 |
Excavate in footway and carriageway to extend existing Virgin Media network, construct new FW2 chamber and lay duct as part of ongoing diversionary scheme |
|
ANNE STREET |
21/09/21 07:00 |
21/09/21 18:00 |
|
|
REIN ROAD |
19/09/21 23:00 |
24/09/21 22:59 |
Kerb + footway maintenance |
|
CRAGSIDE WALK |
23/08/21 07:00 |
21/10/21 22:59 |
|
|
ELLAND ROAD |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
MARSH LANE |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
THE PADDOCK |
26/09/21 23:00 |
27/09/21 22:59 |
footway defect to rectify |
|
VICTORIA CLOSE |
07/09/21 12:00 |
21/09/21 22:59 |
Connection only in conjunction with works on Victoria Avenue |
|
TUNSTALL ROAD |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
WIKE LANE |
19/09/21 23:00 |
22/09/21 22:59 |
EXCAVATION :- 2 meters in verge
METER POSITION OPTION : ON PRIVATE LAND NEXT TO NEW BUILD |
|
LEEDS OLD ROAD |
27/07/21 23:00 |
28/10/21 22:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
LEEDS ROAD |
27/07/21 23:00 |
28/10/21 22:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
KNOWSTHORPE CRESCENT |
01/11/21 08:00 |
15/11/21 23:59 |
Connection only in conjunction with works on Knowsthorpe Crescent. |
|
CROSS BELGRAVE STREET |
20/07/20 23:00 |
18/01/22 23:59 |
Road closure required for additional space to allow safe social distancing for the re-opening of a b... |
|
HIGHWOOD AVENUE |
21/09/21 07:00 |
23/09/21 22:50 |
Performing an excavation in the footway to install telecoms box/duct. |
|
CROSSLEY STREET |
05/10/21 23:00 |
13/10/21 22:59 |
New Connection - Excavate and locate cable, joint new cable and reinstate excavations, including 3 joint holes in footway + 50m trench in footway |
|
ROCHESTER ROAD |
07/12/21 00:00 |
17/12/21 23:59 |
CARRIAGEWAY RESURFACING WORKS 100mm DEPTH INCLUDING ADJUSTMENT/REPLACEMENT OF IRONWORK AND REINSTATEMENT OF ROADMARKINGS. |
|
BACK LANE |
15/11/21 00:00 |
19/11/21 23:59 |
LRS 2021/22 - Cway |
|
SOUTH PARKWAY |
20/09/21 07:00 |
24/09/21 16:00 |
Excavation in Carriageway and Footway for a Water Mains connection to liven mains feeding new Keepmoat development site. Footway closure to pile spoil on footpath. Alternate footpath provided. Approx 4m x 1.m. |
|
BIRCH AVENUE |
11/10/21 23:00 |
15/10/21 22:59 |
|
|
GAYTHORNE ROAD |
16/09/21 07:50 |
22/09/21 22:59 |
|
|
MOORSIDE MOUNT |
05/10/21 07:00 |
18/10/21 16:30 |
Excavate approx 300m of track in the footway and carriageway including 2x carriageway crossings to install Cityfibre apparatus. |
|
MOORSIDE GARDENS |
05/10/21 07:00 |
14/10/21 16:30 |
Excavate approx. 200m of track in the footway and carriageway to install CityFibre apparatus. |
|
MOORSIDE TERRACE |
13/10/21 07:00 |
22/10/21 16:30 |
Excavate approx. 360m in the footway and carriageway , including x2 carriageway crossings on CityFibre new build. |
|
BACK LANE |
10/10/21 23:00 |
15/10/21 22:59 |
LRS 2021/22 - Fway |
|
CHURCH ROAD |
29/11/21 08:00 |
15/12/21 23:59 |
|
|
CLARENCE ROAD |
08/01/21 14:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. |
|
EASTDEAN BANK |
14/10/21 07:00 |
14/10/21 11:00 |
|
|
FARMSTEAD ROAD |
17/09/21 07:00 |
21/09/21 15:30 |
|
|
EAST GRANGE SQUARE |
27/09/21 06:30 |
11/10/21 22:59 |
NSRWA_East Grange Sqaure, Leeds. Abandon 48.89m of 4 SI and lay 28.88m of 90mm PE by ID.
Transfer x 3 Relay x 4 Connections x 1 |
|
|
22/09/21 23:00 |
11/10/21 22:59 |
1 ,Build 1 precast chamber 1310mm x 610mm x 1265mm deep in
Footway,Excavate 2.43m3 to a depth of up to 1200mm to allow for duct
repositioning in Footway,Excavate 7.36m3 to a depth of up to 700mm to
allow for duct repositioning in Footway,Install 38m of 1 way poly duct in
Footway,Reinstate 10.80m2 following excavation in Footway,Reinstate
9.78m3 following excavation in Footway,Reposition 21.60m of 1 way poly
duct |
|
NOWELL LANE |
15/09/21 07:00 |
21/09/21 16:30 |
Excavate approx. 70m in the footway and carriageway with 1 x crossing, to connect into existing network and build chamber and cabinet. |
|
WOODHOUSE STREET |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
|
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
NOWELL STREET |
15/09/21 07:16 |
24/09/21 16:30 |
Excavate approx. 220m of footway and carriageway connecting into existing network to building chamber and cabinet. |
|
MERRION STREET |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
MERRION STREET |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
MERRION WAY |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
NORTH STREET |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
NEW YORK ROAD |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
WELLINGTON GARDENS |
11/10/21 07:00 |
11/10/21 11:00 |
|
|
BRUNSWICK TERRACE |
16/12/21 00:00 |
16/12/21 23:59 |
EVENT - LEEDS ARENA - Lost in Music - Strategic route for the Arena and heavier than normal traffic... |
|
KIRKDALE MOUNT |
08/09/21 15:30 |
22/09/21 22:59 |
Connection only in conjunction with works on Kirkdale Crescent.
Connection x 1, Relays x 0, Transfers x 0 |
|
BARKEREND ROAD |
14/10/21 18:00 |
14/10/21 20:30 |
|
|
CRANMER GARDENS |
06/10/21 07:00 |
19/10/21 16:30 |
Excavate in the verge to install chambers + dig 100m of trench in the verge to install CityFibre apparatus. |
|
BELLE ISLE ROAD |
04/10/21 06:30 |
05/11/21 23:59 |
NSWRA, Belle Isle Road, Leeds. Abandon 319.03m of 8 DI and lay 319.03m of 180mm PE by ID. |
|
EAST GRANGE GARTH |
10/09/21 08:00 |
24/09/21 22:59 |
NSWRA,East Grange Garth, Leeds. Abandon 134.18 of 100mm DI and lay 134.18m of 90mm by ID.
Transfer x 11 Relay x 16 Connections x 2 |
|
EAST GRANGE DRIVE |
06/09/21 08:30 |
15/10/21 22:59 |
Abandon 376.50m of 6 SI, 81.50m of 2 ST. Replace with 376.50m of 125mm Pe and 81.50m of 40mm PE.
Connections x 10, Relays x 17, Transfers x 13. |
|
SKINNER LANE |
09/12/21 21:30 |
10/12/21 07:00 |
2130-0700 - Ground Surveys |
|
COAL HILL LANE |
09/10/21 00:00 |
10/10/21 00:00 |
PUDSEY 79 - DSLAM 836712 - Overlay ? Lay approx 12m of Duct 54/56 in fw and cw to link existing BT Boxes to facilitate spine cabling works. |
|
MANSTON GROVE |
30/09/21 10:30 |
30/09/21 14:30 |
|
|
FAIRBURN DRIVE |
20/09/21 07:00 |
22/09/21 17:00 |
Works to locate and clear duct blockages for telecoms |
|
TOWN STREET |
09/10/21 00:00 |
10/10/21 00:00 |
PUDSEY 79 - DSLAM 836712 - TRAFFIC MANAGEMENT - Portable traffic signal head only, linked to BC211NWWC4KJJ2R002 - with no Excavation. |
|
CHAPELTOWN ROAD |
21/09/21 19:00 |
22/09/21 03:00 |
Monitoring Inspection to L225 Oatland Lane Bridge. Road closure beneath the bridge - Westbound closed first and Eastbound closed second with diversion. TTRO Applications attached |
|
AMBERTON ROAD |
07/10/21 07:00 |
20/10/21 16:00 |
Carry out re-lining of exisiting 4 water main in conjunction with scheme on Amberton Road |
|
STICKER LANE |
27/07/21 23:00 |
28/10/21 22:59 |
REMEDIAL WORKS TO PREVIOUS Carriageway Resurfacing |
|
LEA ROAD |
29/09/21 08:00 |
12/10/21 16:00 |
excavate to provide new service to new traffic sign |
|
REDHILL DRIVE |
20/09/21 07:00 |
21/09/21 17:00 |
1M TRACK WORK |
|
MONKSWOOD |
08/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
PALEY TERRACE |
21/09/21 06:30 |
23/09/21 16:00 |
excavation and replacement of existing street lights (3 of) |
|
HIGHFIELD ROAD |
08/01/21 00:00 |
31/12/21 23:59 |
Covid-19 Vaccination Site... |
|
PRIESTLEY GARDENS |
03/10/21 23:00 |
06/10/21 22:59 |
Build 1 precast chamber 1310mm x 610mm x 1265mm deep in
Footway,Install 12m of 1 way poly duct in Footway,Install 6m of 1 way poly
duct in Carriageway |
|
WORTLEY ROAD |
22/09/21 07:00 |
24/09/21 16:30 |
Excavate 75m in the footway for CityFibre new build. |
|
WORTLEY ROAD |
22/09/21 07:00 |
01/10/21 16:30 |
Excavate 65m footway and 12m carriageway for CityFibre new build. |
|
NEW YORK ROAD |
01/06/21 08:00 |
30/09/21 14:30 |
New York Road from North Street to Regent Street. Lane 2 closure required adjacent to bridge. Enabling construction of west abutment. Primarily as a safety zone for loading wagons within our widening. 09:00 to 15:30, 7 days a week. |
|
TORRE ROAD |
16/09/21 07:00 |
29/09/21 16:30 |
Excavate approx 350m of track in the footway, carriageway + verge to install CityFibre apparatus. |
|
WOODHOUSE LANE |
23/08/21 08:30 |
29/10/21 22:59 |
Footway maintenance |
|
WESTFIELD ROAD |
22/09/21 23:00 |
29/09/21 22:59 |
Install washout hydrant to water main |
|
HAIGHSIDE DRIVE |
27/09/21 23:00 |
28/09/21 19:00 |
Renew stop tap + chamber |
|
LINGFIELD GREEN |
04/10/21 07:00 |
06/10/21 16:30 |
Excavate approx 100m of trench in footway to install CityFibre apparatus. |
|
LINGFIELD BANK |
04/10/21 07:00 |
15/10/21 16:30 |
Excavate approx 295m in the footway and grass verge including 2x road crossings to install CityFibre apparatus. |
|
SELBY ROAD |
18/10/21 07:00 |
29/10/21 16:00 |
Install 125mm cross connection with strainer / meter / PRV on bypass |
|
SPEN LANE |
29/09/21 23:00 |
04/10/21 22:59 |
|
|
FERRYBRIDGE ROAD |
26/10/21 08:30 |
27/10/21 14:00 |
Replace 1 existing pole |
|
THE MOUNT |
06/12/21 08:00 |
17/12/21 18:00 |
CARRIAGEWAY RESURFACING WORKS 100mm DEPTH INCLUDING ADJUSTMENT/REPLACEMENT OF IRONWORK AND REINSTATEMENT OF ROADMARKINGS. |
|
WOODROYD ROAD |
19/09/21 23:00 |
22/09/21 22:59 |
|
|
MERRION STREET |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
|
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
WOODHOUSE STREET |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
NEW YORK ROAD |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
NORTH STREET |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
MERRION WAY |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
LIDGETT HILL |
20/09/21 23:00 |
23/09/21 22:59 |
renew fire hydrant |
|
MERRION STREET |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
GILDERSOME LANE |
22/09/21 23:00 |
27/09/21 22:59 |
Excavate in carriageway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
RAYNEL DRIVE |
17/10/21 23:00 |
29/10/21 22:59 |
LRS 2021/22 - CWAY |
|
RAYNEL DRIVE |
22/08/21 23:00 |
01/10/21 22:59 |
LRS 2021/22 - FWAY |
|
BRUNSWICK TERRACE |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
RAYNEL DRIVE |
17/10/21 23:00 |
29/10/21 22:59 |
LRS 2021/22 - CWAY |
|
RAYNEL DRIVE |
22/08/21 23:00 |
01/10/21 22:59 |
LRS 2021/22 - FWAY |
|
RAYNEL DRIVE |
17/10/21 23:00 |
29/10/21 22:59 |
LRS 2021/22 - CWAY |
|
HIGH STREET |
23/09/21 08:30 |
23/09/21 13:30 |
Final samples are required to be taken in existing bore holes. |
|
CROWN POINT ROAD |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
MERRION WAY |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
LOVELL PARK ROAD |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
VICAR LANE |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
WOODHOUSE LANE |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
GREAT GEORGE STREET |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
LOTHERTON LANE |
07/09/21 07:00 |
27/10/21 22:59 |
DIRECTIONAL DRILL NEW 400M PE MP MAIN |
|
BRIGGATE |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
PONTEFRACT LANE |
06/09/21 07:30 |
15/10/21 16:00 |
Continuing laying 355 main on-site |
|
WOODHOUSE LANE |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
LOW ROAD |
11/11/19 08:00 |
25/09/21 22:59 |
A61 south corridor works part of Leeds Public Transport Investment Programme. Works include improvements to bus infrastructure including bus lanes, modernisation of all traffic signals and improved cycling and pedestrian provision. |
|
REES WAY |
24/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street lights (2 of) |
|
BLAKENEY GROVE |
27/10/21 07:00 |
27/10/21 11:00 |
Install water meter to supply pipe |
|
TUNSTALL ROAD |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
ELLAND ROAD |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
MARSH LANE |
12/11/21 00:00 |
12/11/21 23:59 |
EVENT - LEEDS ARENA - Ant Middleton - 18:00 start... |
|
HUGH STREET |
25/10/21 07:00 |
25/10/21 11:00 |
Install water meter to supply pipe |
|
BLACK BULL STREET |
13/09/21 07:00 |
17/06/22 16:00 |
Junction improvement and public realm works |
|
CROSS GREEN LANE |
06/12/21 08:00 |
21/01/22 23:59 |
NSRWA_Cross Green Lane, Leeds. Abandon 295.03m 6 CI, 2 ST and lay 292.62m of 125mm PE by ID.
Transfer x 2 Relay x 5 Connections x 5 |
|
OLDFIELD LANE |
04/10/21 22:00 |
05/10/21 05:00 |
Hours of work 2300 - 0600. Ladders Inspection of bridge deck |
|
GIPTON WOOD ROAD |
25/10/21 07:00 |
05/11/21 18:00 |
Cable Overlay (High Voltage) - Excavate to Install cable, joint new cable, transfer services and reinstate excavations, including 10m of trench in footway. |
|
EASTERLY ROAD |
25/10/21 07:00 |
05/11/21 18:00 |
Cable Overlay (High Voltage) - Excavate to Install cable, joint new cable, transfer services and reinstate excavations, including 55m in footway. |
|
LEEDS ROAD |
29/06/20 07:00 |
01/10/21 16:00 |
|
|
NORTH LANE |
18/10/21 07:00 |
29/10/21 22:59 |
Connection only in conjunction with works on North Lane.
Connection x 2, Relays x 0, Transfers x 0. |
|
CRAGSIDE WALK |
18/05/21 07:00 |
24/11/21 23:59 |
|
|
MONTAGU AVENUE |
29/09/21 07:00 |
01/10/21 16:00 |
Renew stop tap + chamber |
|
CHARLES AVENUE |
25/10/21 07:00 |
08/11/21 23:59 |
NSWRA_Charles Avenue, Leeds. Abandon 105.45m of 4 CI and lay 105.45m of 63mm PE by ID.
Transfer x 6 Relay x 9 Connections x 1 |
|
CHURCH ROAD |
17/01/22 08:00 |
31/01/22 23:59 |
NSRWA,Church Road, Leeds. Abandon 25.17m of 1.5 ST and lay 25.17m of 63mm PE by ID.
Transfer x 1 Relay x 1 Connection x 1 |
|
BACK BRUDENELL ROAD |
29/09/21 07:00 |
29/09/21 16:00 |
Install stop tap + chamber |
|
BARTON GROVE |
21/09/21 07:00 |
21/09/21 16:00 |
|
|
STANHOPE GARDENS |
14/09/21 06:30 |
28/09/21 22:59 |
|
|
KINGSDALE CRESCENT |
27/09/21 19:00 |
29/09/21 22:59 |
|
|
VINERY ROAD |
15/09/21 02:00 |
21/09/21 22:59 |
Low Voltage Cable Fault - Excavate to locate faulted cable, test faulted cable section and repair by jointing in new cable and reinstate excavation |
|
KINGSDALE CRESCENT |
27/09/21 19:00 |
29/09/21 22:59 |
|
|
ASHBOURNE DRIVE |
27/09/21 19:00 |
29/09/21 22:59 |
|
|
CALVERLEY GARDENS |
13/09/21 07:00 |
27/09/21 22:59 |
Connection only in conjunction with Calverley Lane. |
|
EASY ROAD |
08/11/21 08:00 |
22/11/21 23:59 |
NSWRA_Easy Road, Leeds. Abandon 154.22m of 6 SI, 100 DI and lay 154.22m of 125mm PE by ID.
Transfer x 6 Relay x 13 Connection x 0 |
|
WALKLEY LANE |
13/10/21 08:00 |
26/10/21 16:00 |
excavate to transfer service from old column to new column |
|
KENNERLEIGH GROVE |
29/09/21 23:00 |
30/09/21 22:59 |
Renew stop tap + chamber |
|
NEPTUNE STREET |
24/01/22 08:00 |
07/02/22 23:59 |
NSRWA_Neptune Street, Leeds. Abandon 95.08m of 100 DI, 50 SI and lay 95.08m of 278mm PE by ID.
Transfer x 1 Relay x 2 Connections x 0 |
|
GREENHILL ROAD |
26/04/21 08:30 |
05/11/21 23:59 |
Permanent formation of new development entrance and driveways to new plots |
|
PARK PARADE |
18/10/21 07:00 |
01/11/21 23:59 |
NSWRA_Park Avenue, Leeds. Abandon 51.37m of 2 SI and lay 51.37m of 40mm PE by ID.
Tranfers x 2 Relay x 2 Connections x 2 |
|
PONTEFRACT LANE |
15/11/21 08:00 |
10/12/21 23:59 |
NSRWA_Pontefract Lane, Leeds. Abandon 329.27m of 4 DI, 6 CI, 2 ST and lay 329.27m of 331mm PE by OC
Transfer x |
|
THORNLEIGH STREET |
01/11/21 08:00 |
15/11/21 23:59 |
NSWRA_Thornleigh Street, Leeds. Abandon 44.78m of 3 CI and lay 44.78m of 63mm PE by ID.
Transfer x 2 Relay x 3 Connections x 2 |
|
FLAX PLACE |
17/01/22 00:00 |
01/02/22 23:59 |
NSWRA_Flax Place, Leeds. Abandon 62.99m of 100 DI and lay 62.99m of 90mm PE by ID.
Transfer x 0 Relay x 0 Connections x 2 |
|
FREDERICK AVENUE |
18/10/21 07:00 |
05/11/21 23:59 |
NSWRA, Frederick Avenue, Leeds. Abandon 102.26m of 4 SI and lay 102.26m of 63mm PE.
Transfer x 7 Relay x 11 Connection x 1 |
|
ST JOHN S ROAD |
15/10/21 07:00 |
28/10/21 22:59 |
Abandon 128m of 100mm DI and 17.45m of 2 ST. Replace with 128m of 90mm Pe and 17.45m of 40mm PE by dead insertion.
Connections x 2, Relays x 10, Transfers x 6 |
|
ROMAN AVENUE |
22/11/21 07:30 |
31/03/22 17:00 |
|
|
ST JOHN S DRIVE |
25/10/21 07:00 |
12/11/21 23:59 |
Abandon 172m of 100mm DI and 17m of 2 ST. Replace with 173m of 63mm PE and 17m of 40mm PE by dead insertion.
Connections x 4, Relays x 13, Transfers x 7. |
|
KEDLESTON ROAD |
15/11/21 00:00 |
25/03/22 23:59 |
|
|
YORK ROAD |
26/10/21 07:00 |
26/10/21 16:00 |
Renew stop tap + chamber |
|
CANAL STREET |
21/09/21 07:00 |
23/09/21 16:00 |
Permit for signage only |
|
ELM GROVE |
11/10/21 07:00 |
11/10/21 16:00 |
|
|
MOORTOP |
24/09/21 07:00 |
24/09/21 22:00 |
Install stop tap + chamber |
|
GREENLEA AVENUE |
09/11/21 08:00 |
14/12/21 23:59 |
Abandon 296m of 8 SI. Replace with 296m of 125mm PE by dead insertion. Some works in gardens
Connections x 3, Relays x 26, Transfers x 14. |
|
HAW AVENUE |
21/10/21 23:00 |
28/10/21 22:59 |
renew fire hydrant |
|
VICTORIA AVENUE |
15/09/21 11:45 |
21/09/21 22:59 |
|
|
NEW YORK ROAD |
01/11/21 20:00 |
06/11/21 05:30 |
Regent Street Reconstruction Scheme. Paraslim/EMJ Installation. Road Closure from 20:00 to 05:30 overnight with diversion. |
|
NEW YORK ROAD |
08/11/21 20:00 |
13/11/21 05:30 |
Regent Street Reconstruction Scheme. Paraslim/EMJ Installation. Road Closure from 20:00 to 05:30 with diversion. |
|
BARTON GROVE |
24/09/21 07:00 |
24/09/21 16:00 |
Install stop tap + chamber |
|
MARSHALL STREET |
13/12/18 00:00 |
08/12/21 23:59 |
Hoarding |
|
STREET LANE |
03/09/21 09:00 |
30/09/21 22:59 |
NRSWA_Permit_Street Lane, Leeds
Abandon 265.60m of 4 ST, Replace with 265.60m of 90mm PE by Dead Inserted
Connnections x 2 Relays x 14 Transfers x 10 |
|
ASHFIELD ROAD |
31/03/20 23:00 |
31/03/22 22:59 |
INSTALLATION OF MOVA-SCOOT... |
|
ASH TREE GROVE |
07/10/21 23:00 |
08/10/21 16:00 |
Renew stop tap + chamber |
|
WHACK HOUSE CLOSE |
07/10/21 07:00 |
21/10/21 22:59 |
Abandon 112.75m of 100mm Di. Replace with 112.75m of 63mm PE by dead insertion.
Connection x 2, Relays x 11, Transfers x 7. |
|
NEW YORK ROAD |
01/11/21 20:00 |
06/11/21 05:30 |
Regent Street Reconstruction Scheme. Paraslim/EMJ Installation. Road Closure from 20:00 to 05:30 with diversion. |
|
GATHORNE TERRACE |
08/11/21 00:00 |
26/11/21 23:59 |
Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 18 joint holes in footway |
|
HANOVER SQUARE |
30/09/21 23:00 |
05/10/21 22:59 |
Excavate in footway to extend existing Virgin Media network and lay duct in order to provide new customer connection |
|
PARK ROAD |
16/09/21 23:00 |
21/09/21 22:59 |
|
|
WESTON LANE |
23/09/21 23:00 |
28/09/21 22:59 |
Excavate 1 location/s and install copper earthing strip to en |
|
THE CRAG |
17/09/21 07:00 |
21/09/21 16:00 |
Excavate to locate service, check flow + pressure |
|
VALLEY RIDGE |
16/09/21 23:00 |
21/09/21 22:59 |
Excavate in footway and locate/clear blockage(s) in order to provide new customer connection |
|
PARK AVENUE |
27/09/21 06:00 |
28/09/21 17:00 |
Disconnect Cust Supply Rech |
|
MABGATE |
10/05/20 23:00 |
28/11/21 23:59 |
Closure to facilitate access to Contractor?s compound during Regent Street flyover project + Improve... |
|
SAYNER ROAD |
28/06/20 23:00 |
27/12/21 23:59 |
Road closure and turn bans required for remodelling of junction as part of LPTIP works.... |
|
LEATHLEY ROAD |
28/06/20 23:00 |
27/12/21 23:59 |
Road closure and turn bans required for remodelling of junction as part of LPTIP works.... |
|
HUNSLET ROAD |
28/06/20 23:00 |
27/12/21 23:59 |
Road closure and turn bans required for remodelling of junction as part of LPTIP works.... |
|
BURLEY PLACE |
27/09/21 06:00 |
01/10/21 22:00 |
3SM1 Inst Meter MSM Com Pipe LongS |
|
NEVILLE PARADE |
22/09/21 07:00 |
22/09/21 15:00 |
Link Box Lid ? Attendance required to replace/repair damaged link box lid; Trip hazard on link box requires immediate attention |
|
STONEBRIDGE LANE |
10/10/21 23:00 |
29/10/21 22:59 |
Lay New electricity cable from near to the roundabout at A6110 to outside Buzz Bingo Car Park. Works will be done using a lane closure close to the roundabout and all other works will be done under sites 2 way lights. Pedestrian walkways will be provided where footways need to be excavated. |
|
STOCKS BANK ROAD |
04/10/21 17:00 |
26/11/21 23:00 |
Carriageway resurfacing |
|
WINGFIELD MOUNT |
22/09/21 06:30 |
24/09/21 16:00 |
excavation and replacement of existing street lights (2 of) |
|
GREAT PASTURE |
19/09/21 23:00 |
24/09/21 22:59 |
|
|
CROSBY VIEW |
28/09/21 07:00 |
29/09/21 17:00 |
Provide 1 new pole |
|
CROSS STREET |
20/09/21 23:00 |
27/09/21 22:59 |
|
|
SISSONS GROVE |
16/09/21 07:00 |
29/09/21 15:00 |
Cable Overlay (Low Voltage) - Excavate to install cable, joint new cable, transfer services, and reinstate excavations, including 2 joint holes in footway and 12m road crossing |
|
CHURCH LANE |
17/10/21 23:00 |
22/10/21 22:59 |
1 concrete chamber 1220mm x 680mm x 1665mm deep in Carriageway,Build 1 precast chamber in 915mm x 445mm x 965mm deep in Footway,Install 13m of 1 way poly duct in Footway,Install 39m of 1 way poly duct in Verge,Install 6m of 1 way poly duct in Carriageway |
|
CROSBY PLACE |
28/09/21 07:00 |
29/09/21 17:00 |
Provide 1 new pole |
|
TOWN STREET |
23/08/21 08:30 |
01/10/21 12:00 |
Temp lights |
|
SALCOMBE PLACE |
16/09/21 07:45 |
22/09/21 22:59 |
|
|
EASTGATE |
01/03/21 09:30 |
10/02/22 23:59 |
Regent Street Flyover Reconstruction Scheme. Closure of the Western footway beneath the flyover with pedestrian diversion. 24hrs a day between the dates given below. Diversion plan attached. |
|
UPPER NORTH STREET |
06/12/21 00:00 |
10/12/21 23:59 |
Point Closure for work on Oxford Street |
|
HAWTHORNE MOUNT |
01/10/21 07:00 |
07/10/21 16:00 |
ALTER EXISTING GAS SERVICE - WORKS IN FOOTWAY - OPEN CUT - 0.7M-1M DEEP - PEDS TO USE ALTERNATIVE FOOTWAY |
|
FULNECK |
14/10/21 23:00 |
21/10/21 22:59 |
renew fire hydrant |
|
RIDDING GATE |
15/09/21 23:00 |
29/09/21 22:59 |
Installation of track in footway. |
|
WESTON LANE |
13/09/21 07:00 |
24/09/21 22:59 |
Installation of track in footway. |
|
WILKINSON WAY |
14/09/21 23:00 |
28/09/21 22:59 |
Installation of track in footway. 2 x road crossings. |
|
WESTON CRESCENT |
26/09/21 23:00 |
08/10/21 22:59 |
Installtion of track in footway. 1 x road crossing. |
|
WESTON DRIVE |
08/09/21 07:00 |
05/10/21 22:59 |
Installation of track in footway. 4 x road crossings. |
|
THE OVAL |
13/09/21 07:00 |
22/09/21 22:59 |
Installation of track in footway + c/way. |
|
HIGH ASH DRIVE |
20/09/21 07:00 |
22/09/21 22:50 |
Performing an excavation in the footway to install telecoms box/duct. |
|
WILLOW PARK |
27/09/21 23:00 |
04/10/21 22:59 |
TM ONLY - placement of temporary traffic light signal head for works in Leeds Road under ref: NK106YOID346616A |
|
LEEDS ROAD |
27/09/21 23:00 |
04/10/21 22:59 |
Excavate in footway and carriageway to extend existing Virgin Media network, construct new T1 cabinet, new HP1 cabinet, new FW6 chamber and lay duct as part of ongoing diversionary scheme |
|
MARKET PLACE |
20/09/21 07:00 |
28/09/21 16:00 |
LAY NEW SERVICE - 10M IN FOOTWAY + CARRIAGEWAY - OPEN CUT - 0.7M-1M DEEP - MULTI WAY LIGHTS - PEDS TO USE WALKWAY PROVIDED |
|
STOCKS HILL |
20/09/21 07:00 |
30/09/21 16:00 |
ABANDON 20M X 10CI + LAY 26M X 250MM PE - WORKS IN VERGE, F/W + C/W |
|
PORTLAND WAY |
06/09/20 23:00 |
07/03/22 23:59 |
Suspension of disabled car parking, parking, loading and conversion of pay and display car parking t... |
|
HUDDERSFIELD ROAD |
04/10/21 17:00 |
26/11/21 23:00 |
Carriageway resurfacing |
|
WESTON RIDGE |
19/09/21 23:00 |
22/09/21 22:59 |
Works on V-hub |
|
MARCHANT STREET |
30/09/21 07:00 |
01/10/21 17:00 |
Provide 1 new pole,Recover 1 existing pole |
|
OLD ROAD |
01/03/22 08:00 |
14/03/22 23:59 |
|
|
WESTON RIDGE |
19/09/21 23:00 |
15/10/21 22:59 |
Installation of track in footway. 3 x road crossings. |
|
CLARKE STREET |
21/09/21 07:00 |
22/09/21 17:00 |
|
|
KIRKGATE |
19/09/21 23:00 |
21/09/21 22:59 |
|
|
BERNARD STREET |
19/09/21 23:00 |
22/09/21 22:59 |
Excavate in carriageway and locate/clear blockage(s) in order to provide new customer connection |
|